Crab Cavities Activities

Slides:



Advertisements
Similar presentations
1 te 2 1 te 2 1 te-- 1 te-- 1 te 2 1 te 2 1 te 2 te ta 2-- ta 1 te-- 1 te-- 1 te ta 2-- ta 1 te-- 1 te 2 te 1-2.
Advertisements

Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
LHC-YETS Coordination meeting #9 24 th November, 2015.
Crab Cavity in SPS LSS6 S.Mehanneche, F.Galleazzi, G.Vandoni.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
YETS & LS2 Works EN-EL / Power distribution
Crab cavities Cryogenics progress for the SPS
BA6 – crab cavity activities in EYETS
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
LHC-EYETS 2016/17 Coordination meeting #18
K. Foraz on behalf of OSS members
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
Helium spill in LHC tunnel
CE Status: Activities executed until 03/08 and ongoing
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
Days of the week NEXT.
Short LHC-TS week 38 Confirmed by LMC on 16th August
YETS & LS2 Works EN-EL / Power distribution
Status with crucial LSS5 kicker transmission line cables
Days of the Week Les docs d’Estelle –
DAYS OF THE WEEK.
Time management School of Rock.
Sunday Monday Tuesday Wednesday Sunday Monday Tuesday Wednesday
A M P M Name: ________ Voice Log Week of __/__/__ Monday Tuesday
Sutton Elementary HISD
Mrs. Parris’s Class This week in: Homework this week:
Weather Project By Madame Durocher.
Les leçons préliminaires
Several Ad-Supported TV Shows & Sports “Own” Specific
7th Grade Math Warm-ups Week of November 7-11, 2016.
Days of the Week Monday Tuesday Wednesday Friday Thursday Saturday
Monday Tuesday Wednesday Thursday Friday Super student Great job Good choices Ready to learn Think about it Teacher’s choice Parent contact Monday.
MATH 6/6+ – Monday, Sept. 9/25 Agenda: Objective: POW #3/WUp
ONLY 16 DAYS of SCHOOL LEFT!
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019.
Time 1.
Contact
Week of May 19-23, 2014 Warm-ups.
Week of December 2-6, 2013 Warm-ups.
Week of August 28-September 2, 2016
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
7th Grade Math Warm-ups Week of September 6-9, 2016.
7th Grade Math Warm-ups Week of September 7-11, 2015.
Warm-ups Week of October 7-11, 2013.
Week of March 17-21, 2014 Warm-ups.
Week of February 3-7, 2014 Warm-ups.
Week of December 16-20, 2013 Warm-ups.
Week of March 24-28, 2014 Warm-ups.
Week of February 10-14, 2014 Warm-ups.
7th Grade Math Warm-ups Week of February 13-17, 2017.
7th Grade Math Warm-ups Week of September 14-18, 2015.
Week of November 4-8, 2013 Warm-ups.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
Week of November 18-22, 2013 Warm-ups.
7th Grade Math Warm-ups Week of October 3-7, 2016.
7th Grade Math Warm-ups Week of October 24-28, 2016.
7th Grade Math Warm-ups Week of October 5-9, 2015.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
7th Grade Math Warm-ups Week of February 6-10, 2017.
Monday, April 13, 2015 Warm Up – All Grades
Week of October 28- November 1, 2013
Week of January 30 – February 3, 2017
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
Presentation transcript:

Crab Cavities Activities Week 6 06/02/2017 Giovanna Vandoni

Week 5 overview

Cryo warm pipes - top of PA6 shaft Continues on Saturdays, however work is slowed down by the necessity to install equipment on Saturday morning and remove it again Saturday evening. We negotiated with EN/EL that RAM Power will be able to install welding post etc on Friday afternoon Radiological check DEKRA (2 personnes, 165336) welding controls in the shaft, Wednesday evening Un balisage de sécurité sera mis en place à partir de 18h - 18h30 début des tirs radiographiques à 19h. Pendant la période d’intervention il est strictement interdit de franchir le balisage mis en place. Nous ferons faire un balisage en tête de puit mais également en bas du puit.

EN/EL Cabling One of the big parts of the project, which takes place until week 11-12. (purple part on the planning)

Pipes installation in LSS6 Pipes arrived Friday, 175kg per 6m, meaning 30kg/m Discharged from the truck by transport, stored in cryo surface building (ATLAS) 3 segments lowered in TA6 VIC Monday 13/2: 13:00 on site PPSPS Fire Permit IS 37 missing Fiche de Tache Criotec not ready to start, will come back next week Missing piece

Pipes installation in LSS6 “Mode operatoire” tested with Altead + Ouvaroff Handrails of the scaffold removed, transverse beams installed 1 segment lifted with lift truck “a potence” Turned and slid through the scaffolding structure Transported in position Lowered on transverse beams and secured Tube 1 Tube 2 Thanks Altead, Ouvaroff, F.Bais, Jos

Still some work on the scaffold before Criotec arrives EN/EL/FC for consolidation of power cables insulation. Contact A.Jacob 162159 Intervention Thursday 9th Feb

Helium pump area Yellow survey support Helium Pumps Removed! …then TREC labelled twice by me… (sorry) Helium Pumps Need to be installed sufficiently in advance before end of EYETS, not to interfere with Cryoline transport and lifting Scaffold removal Installation of new handling rail Week 8 is possible, previous check with TIDVG removal Week 9 or 10 at latest