Consolidation and Upgrade of the LHC Experimental Vacuum Systems

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
SPS New Wire Scanner Mechanics Review
CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Gerhard Schneider1 14 October 2011 Status of the Composite Vacuum Chambers M. Gallilee, C. Garion, M. Malabaila,
LHeC Experimental Beam Pipe
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Aluminum bellows for experiments
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Training in Vacuum Technology for JUAS 2013 Students
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Summary of Opening Session Emmanuel Tsesmelis / CERN CARE-HHH-APD Workshop Arcidosso 2 September 2005.
Preliminary View on the LHeC Experimental Vacuum Chambers Jonathan Bosch - University of Manchester And Ray Veness - TE/VSC J.Bosch and R.Veness LHeC -
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Next Steps, Priorities, Strategy for Spares Ray Veness.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Consolidation and Upgrade plans for the LHC Vacuum System
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
OLAV3 Engineering Integration and installation of experimental beam pipes: the case of LHC 7/8/20111P.Lepeule for VSC group.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Update on Experimental Beampipe Progress Ray Veness For Beampipe project team in AT/VAC and TS/MME With special thanks to: S.Calatroni, W.Cameron, D.Duarte,
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
LEB 14 X 11 C. Garion Aluminum bellows for LHC experiments C. Garion, TE/VSC.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Straw man layout for ATLAS ID for SLHC
Vacuum System P. Chiggiato TE-VSC
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
News and Introduction from CERN June 15th, 2005
Ultra-vacuum components and systems
Alignment of VSC components along LSS 1&5
TAXS and TAXN ABSORBERS - OVERVIEW
Installation of an Instrument on a CERN machine
Machine-Experiment Interface
Preliminary Y-chamber specifications – First draft
Components for the Machine-Interface Regions
LHC Experimental Vacuum Systems Status October ‘07
M. Alcaide Leon, Paolo Fessia
Antti Onnela CERN – EP – Detector Technologies group
Long Shutdown for the LHC: Vacuum Beam Pipes
Consequences of warming-up a sector above 80 K
Progress with Experimental Vacuum Chambers
Electron cloud & vacuum pressure observations: 2011 proton run
The MTF adjusted system to meet Vacuum Group needs
Accelerator and Experiment Interface Session: LS2, LS3
Upgrade Strategy for the Experimental Vacuum Systems
UK RFD Pre-Series cryomodule
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Q1-Q2, Q2-Q3 Interconnect Zone Disconnection Q1 Magnet Extraction
Interaction Region Design Options e+e- Factories Workshop
Wednesday Summary of Working Group I
Project management Ray Veness.
Production Cryo HL-LHC BPMs
Presentation transcript:

Consolidation and Upgrade of the LHC Experimental Vacuum Systems Ray VENESS For the Experimental Vacuum team

Overview Background Consolidation and upgrade project(s) Current situation for LHC experimental vacuum Challenges of the experimental vacuum systems Consolidation and upgrade project(s) Definition of terms Examples of projects ATLAS VA vacuum chambers Impact of triplet upgrade on experiments New detectors for ATLAS and CMS New materials for LHC luminosity upgrades The project organisation Organisation The work Resources Summary Work for VSC Conclusions Experimental Vacuum 26 VI 09 - R.Veness

Introduction A short, but important part of the LHC vacuum system Q1-Q1 in IR 1,2,5 and 8 ≈ 160m of the ring The LHC experiments cost ~1500 MCHF and every particle they see must first pass through the experimental vacuum LHC experimental vacuum systems are the responsibility of TE-VSC Ensure the reliable operation of the LHC machine Common issues and technologies Maximise efficiency for CERN, exploit synergies, avoid redundancies in skills and designs Experimental vacuum sectors are not ‘stable’ Experiments are continually looking to optimise their detectors LEP experimental vacuum saw 3 generations of chambers for all 4 experiments, plus a number of smaller upgrades Some requests for upgrades from LHC experiments date already from 2001 Experimental Vacuum 26 VI 09 - R.Veness

Challenges: Optimised chambers, supports and instruments Annular ion pump for ATLAS and ALICE LHCb UX85/3 conical beryllium chamber ‘Spider’s web support in LHCb Experimental Vacuum 26 VI 09 - R.Veness

Challenges: Installation and Access Bakeout of the CMS vacuum system Installation of the last chamber in ATLAS Experimental Vacuum 26 VI 09 - R.Veness

Challenges: Interfaces with Detectors Integration of the ATLAS beryllium chamber with the PIXEL detector in clean room Bakeout of the ALICE beryllium chamber – fans keep the detectors cool Experimental Vacuum 26 VI 09 - R.Veness

‘Consolidation’ and ‘Upgrade’ Consolidation (install 2010-12) Production of critical spares, where no spare exists for LHC operation, or the spare is not compatible with operation of the experiment Eg, CMS end cap pipe Replacement of faulty components Eg, LHCb UX85/3 beryllium chamber Replacement of components that will cause problems of activation and background already before nominal luminosity [see example] Eg, ATLAS VA and VT chambers Upgrade phase I (install 2013/14) New chambers for upgraded PIXEL detectors [see example] Changes to layouts due to triplet upgrade [see example] Replacing activated chambers that cannot be modified for ‘ALARA’ reasons Upgrade phase II (install 2017~18) New layouts for SLHC with provision of higher luminosity and activation R&D for new materials for chambers and components [see example] Experimental Vacuum 26 VI 09 - R.Veness

Example 1: ATLAS VA CERN Academic Training 9th June 09 Experimental Vacuum 26 VI 09 - R.Veness

Example 1: ATLAS VA Courtesy of V.Hedberg Experimental Vacuum 26 VI 09 - R.Veness Courtesy of V.Hedberg

Example 1: ATLAS VA Erik’s head is at the ~500μSv/h level (for nominal lumi.) here… We have ~1 day of work here in every shutdown ATLAS have several man/weeks here per year Experimental Vacuum 26 VI 09 - R.Veness

Example 1: ATLAS VA VSC Activities Development Aluminium bellows In progress between VSC and EN-MME Thin walled 2219 aluminium tubes Aluminium ion pump body To do – looking for support in VSC Rotatable minimised aluminium flanges To do Production Welded assembly of 3 chambers NEG coating of aluminium and bellows Integration of optimised bakeout equipment Qualification and test Performance testing Installation testing Installation Planned for 2010/11 shutdown Experimental Vacuum 26 VI 09 - R.Veness

Example 2: Impact of Triplet Upgrade This zone is fully integrated into the experimental cavern (eg. CMS) Interface zone between Q1 and the high-luminosity experiments (ATLAS, CMS) Experimental Vacuum 26 VI 09 - R.Veness

Example 2: Impact of Triplet Upgrade All the vacuum components over this length in ATLAS and CMS will need to be re-designed and replaced Remote flange TAS chamber BPMSW VAX Experimental Vacuum 26 VI 09 - R.Veness

Example 3: New detectors CERN Academic Training 9th June 09 Experimental Vacuum 26 VI 09 - R.Veness

Comment: This means 5~10 MCHF of beryllium beampipes… CERN Academic Training 9th June 09 Experimental Vacuum 26 VI 09 - R.Veness

Example 4: Alternative materials to Beryllium Problems with beryllium Expensive (100-200 kCHF/m) Hazardous (tight restrictions on use at CERN) Limited supply (complex manufacture) Specification for alternatives Transparent to particles UHV compatible Radiation and temperature resistant Carbon-carbon composite tube for test Experimental Vacuum 26 VI 09 - R.Veness

LHC Experimental Beampipes Working Group Project Organisation Requests for consolidation or upgrade Resource planning LHC Experimental Beampipes Working Group ACC-DIR BE-ABP R&D follow-up EN-MEF Layout changes LHC Machine Committee TE-VSC Experimental Vacuum 26 VI 09 - R.Veness

Requests for Consolidation or Upgrade Experimental Vacuum 26 VI 09 - R.Veness

Project Resource Planning Experimental Vacuum 26 VI 09 - R.Veness

Main activities for VSC Analysis of new vacuum layouts Smaller diameters for phase I upgrade Cold + warm machine magnets inside experiments for phase II Development of vacuum components Remote handling for flanges and chambers Aluminium bellows, ion pumps and minimised flanges Production Mechanical design and construction Many new beryllium chambers Integrated bakeout equipment Qualification and installation testing… radiation! NEG coating Smaller diameter, thinner, fragile chambers New materials for vac chambers Carbon-carbon leak-tight coatings and NEG coatings Other materials Experimental Vacuum 26 VI 09 - R.Veness

Summary Experimental vacuum systems are part of the LHC vacuum system, with some particularities Optimised materials and components, difficult access and interface conditions The LHC experiments are working on major consolidations and upgrades, and they require our collaboration 7 MCHF of new vacuum hardware, 2.7 MCHF of development and project costs, 6 persons/year over the next 5 years There are many challenges for VSC New ideas are always welcome! Experimental Vacuum 26 VI 09 - R.Veness