The situation is far better than I had thought.

Slides:



Advertisements
Similar presentations
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
30 GHz waveguide line modification towards 12 GHz.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
CLIC and High Gradient FEL Design D. Schulte for the CLIC collaboration and FEL friends D. Schulte, LSUM, Ankara, October
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
CLIC Spain collaboration CIEMAT: AC structures and Dipoles magnetsCIEMAT: AC structures and Dipoles magnets CELLS - ALBA: Stripline kickers, Impedance.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
The status of RF components G. Riddone, M. Filippova RF development meeting on
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Areal RF Station A. Vardanyan
CALIFES A proposed electron beam test facility at CERN
Multi-stage pulse compressor
WP5 Elliptical cavities
Sub-system integration for the VBOX
Uppsala Commitment to ESS and FREIA Planning
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Accelerator Research and Innovation for European Science and Society
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
X-band Technologies IFIC, Valencia Test Infrastructure
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
ESS RF Development at Uppsala University
Task 2: High-gradient normal-conducting technology development
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Klystron based. Updates 2017.
Recent high-gradient testing results from the CLIC XBoxes
CEPC RF Power Sources System
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
Advanced Research Electron Accelerator Laboratory
RF Pulse Shaping.
Saclay Test Facilities
RF systems introduction
STATUS REPORT OF THE SPARC HIGH POWER RF SYSTEM Nov. 16, 2005 R
Presentation transcript:

The situation is far better than I had thought. Topical session III: High-power test areas Summary Objective: Review the status of possibilities for test stands at collaborating institutes. The situation is far better than I had thought. W. Wuensch CLIC collaboration meeting 11-5-2012

High power RF network 50 MW Klystron Solid state Modulator RF vacuum valve RF vacuum Pumping port CLIC accelerating structure under test RF loads RF pulse compressor Bidirectionnal coupler 50 MW Klystron Solid state Modulator

Possible locations at Saclay Saclay Accelerator Plateform ‘Synergium’ « Clean lab », available now My office! « Fosse Amalthée »: ~ 230 m² at the basement level, need to be restaured STATION D’ESSAI CLIC 12 GHz We have all the necessary infrastructure (crane capacity , electrical power, cooling power and concrete shielding blocks) The future location of the test stand is still in discussion IFMIF injector (bunker available in 2013) SPIRAL2 injector (bunker available in 2013) 10 m CEA Saclay

Tentative planning Feb 2014: CPI Klystron received at Saclay Apr 2014: Modulator installed at Saclay Jan 2015: Operation on accelerating structure CEA Saclay

Equipment EXISTING EQUIPMENT TO BE FUNDED 5 high-vacuum chambers (min. press. 10-8 mbar), Power amplifiers from 435 MHz to 30 GHz Several spectrum analyzers, network analyzers, … Waveguides, directional couplers, cables, attenuators, circulators, isolators, bolometers and others Multichannel multipactor station , unique in the world Electron sources: electron gun, 90Sr, Hg ultraviolet sources XPS-UPS, SEM, electronic spectroscopy Evaporation system for layer growing and outgassing studies 2 clean rooms class 10000 (equivalent to ISO 7) + mechanics & electronics workshop (2D and 3D metrology system) TO BE FUNDED 9.3 GHz pulsed klystron: 6 MW peak, 6 kW average Modulator Vacuum chamber XPS-UPS So far, the High Power RF Space Laboratory (X ray Photo emission Spectrography – Ultraviolet Photo Emission Spectrography) Vacuum chambers: min. pressure 10-6, 10-7 and 10-8 mbar. Dimesions of vacuum chamber with lowest pressure: 1 meter long and 0.6 meter diameter. 9 GHz pulsed klystron

In addition verbal reports from: Sincrotrone, Trieste JINR, Dubna PSI

Institute Power source Features Uppsala CPI 50 MW Dedicated new facility, proposal submitted, funding decision in November. Needs klystron. Saclay Dedicated new facility, has laboratory support, siting under study, needs klystron, some rf components, some additional support. Details are being prepared. Trieste Existing SLAC 50 MW Uses spare XL-5, existing linac infrastructure, has laboratory support, needs some rf components. Details will be prepared. PSI Waiting for commercialization of XL-5 before even considering risking spare klystron. Everything else would be in place. Dubna 6 MW cluster Dedicated new facility. Laboratory support. Hardware from Russian industry. Detailed proposal under preparation. Will require support. Valencia 6 MW, 9.3 GHz Accelerator and medical high-gradient linac R&D. Synergy with Val Space Consortium.