GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
30 June 2005 FSW Status Review 1 GLAST Large Area Telescope Instrument Flight Software LAT Monthly June 30, 2005 Terry Schalk U. C. Santa Cruz Gamma-ray.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Primary Boot Code (PBC) D. Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Thermal Control System Steve Mazzoni Stanford Linear.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Flight Unit Peer Review 16 September 2004 Flight Software Testing Eric Hansen Stanford Linear Accelerator Center
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 4 of 12 Flight Software 1 GLAST Large Area Telescope LAT Pre-Shipment Review Flight.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
GLAST Large Area Telescope Instrument Flight Software Jeff Fisher, FSW Manager Flight Unit Peer Review Overview/Management/Schedule September 16, 2004.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST Large Area Telescope:
I&T&C Organization Chart
GLAST Large Area Telescope:
Existing Perl/Oracle Pipeline
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
EPU load – same as SIU load except…
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
Launch and On-orbit Checkout
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Instrument Flight Software Monthly Status Review January 27, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center

LAT Monthly - FSW Status January Issues AstroRT Debugging Debugging and provided workarounds for instances where Astro-RT does not properly handle various ITOS records. Analysis and characterization of issues continues to absorb time 27 Jan 2005 LAT Monthly - FSW Status

LAT Monthly - FSW Status January Activities Charge Injection Calibration (LCI) Good progress on CAL charge injection calibration Have used the code to pulse a CAL module (electronics only, no logs) and get calibration data back Now analyze physical limitations of the hardware (cross-talk and deteriorating DAC output at high pulse rates) Once CAL complete, move on to TKR and ACD Inter-task Communications System (ITC, LCS, CTS) Development delayed because of ISIS integration and AstroRT testing Scheduled to finish in February Housekeeping (LHK) Minor bug fixes Data set expanding to include new CPU performance metrics Front End Simulator (FES) FES management utilities are complete Now focus on generating a more realistic event data stream Rather than flat or Poisson event rate, simulate pile-ups and otherwise get the stream to look more like the GLEAM data Primary Boot Code (PBC) Multiple boot code image checksum and selection code complete 27 Jan 2005 LAT Monthly - FSW Status

LAT Monthly - FSW Status January Activities (2) File and Memory Management (LFS, FILE, MEM) NRL verified that memory management differs in important ways between the RAD750 evaluation and flight boards Will produce a version of primary boot code for each board Telecommand and Telemetry Database Minor adjustments to FSW command and telemetry formats to compensate for bugs in AstroRT LAT Instrument Manager (LIM)/Mode Controller J. Fisher, M. DeKlotz investigating Spacecraft hardware states and their possible implications for mode control Thermal Control (LTC) New control algorithm received from Lockheed Implementation in FSW is complete Telecommands for this system are being implemented LAT Communications Board Driver (LCBD) Errors encountered during LCB initialization have been corrected 27 Jan 2005 LAT Monthly - FSW Status

LAT Monthly - FSW Status January Activities (3) LAT Diagnostics Framework (LDF) Work in progress To be reassigned, and work will follow completion of the Calibration code Attitude/Time Processing (LSM) At NRL, records from a pre-built attitude data set are successfully transmitted via 1553 from a simulated Spacecraft to a simulated LAT CPU Lookup tables of this attitude data successfully built on the LAT CPU Similar work underway at SLAC for the time data Instrument Physics (LPA) Event delivery and filter code has been updated Code to traverse and unpack events has been adapted to match the newest structure of the data Large (> 4K) events are frequently split up by the hardware Event delivery code now handles reassembly Properly-formatted GLEAM data sets are now available, via OSU, to use as gold standard comparison for FES data Delivery and filter code soon to be put into production and used on the Testbed with the FES Demo Plan laid out again Integration Plan updated 27 Jan 2005 LAT Monthly - FSW Status

Development Status/Schedule Function Planned Code/Unit Testing Complete Status Remaining Effort (person weeks) Forecast Code/Unit Testing Complete Continuing Activities Processor Basic Services (PBS, VXW) Complete 100% coded None Primary Boot 10/30/04 Testing Multiple Boot Image, Checksum 1/21/05 N/A Secondary Boot LAT Communications Board Driver (LCBD) 12/15/04 LCB Service (LCS) 11/30/04 80% coded 2 2/28/05 Interrupted by ISIS & AstroRT testing Command and Telemetry/1553 Service (CTS) 1 Abstract/Inter-task Communications (ITC) 90% coded Instrument Configuration (LATC) 12/01/04 Command and Telemetry Data Dictionary (LCAT) 1/10/05 LCAT tool complete 27 Jan 2005 LAT Monthly - FSW Status

Development Status/Schedule (2) Function Planned Code/Unit Testing Complete Status Remaining Effort (person weeks) Forecast Code/Unit Testing Complete Continuing Activities File and Memory Mgmt (LFS, File/Object) 11/30/04 100% coded 1 Complete Unit testing underway Housekeeping (LHK) 10/15/04 95% coded 1/14/05 Needs minor update after ITC complete Thermal Control (LTC) 12/01/04 80% coded 2/09/05 Coding resumed this month, on track for Feb completion Spacecraft Interfaces (LSM) 11/15/04 90% coded (attitude processing complete) 2 2/11/05 N/A Watchdog (LSW) 70% coded 3 3/04/05 Reassigned Mode Control (LIM) Coding begins after ITC 3/10/05 No progress made due to ISIS, AstroRT testing Power/Initialize GASU (PIG, part of Basic Services layer) Bug fixes. 27 Jan 2005 LAT Monthly - FSW Status

Development Status/Schedule (3) Function Planned Code/Unit Testing Complete Status Remaining Effort (person weeks) Forecast Code/Unit Testing Complete Continuing Activities Charge Injection Calibration (LCI) 12/15/04 50% coded 4 2/18/05 Good progress made this month Diagnostics (LDF) 11/15/04 Being reassigned 2/28/05 Related to calibration; will continue after calibration completed Event Integrity and Delivery (part of LPA) 1/07/05 90% coded 1 2/11/05 Good progress made; code nearing production status Event Filtering (part of LPA) GRB Detection and Response (part of LPA) 60% coded 2 4/15/05 Deferred until completion of filter & diagnostics 27 Jan 2005 LAT Monthly - FSW Status

Requirements-to-Demo Mapping 27 Jan 2005 LAT Monthly - FSW Status

FSW Test Readiness Status/Schedule Test Name Test Number Responsible Eng. Planned Script Development Actual 1553 Interface Test 1 Shantha Sep-04 8 of 8 FSW and LAT initialization 9a Igor K. 19 of 22 Command Functional 2a Oct-04 15 of 15 FSW and LAT re-initialization and recovery 9b 5 of 5 File Management and Memory Upload and Dump Verification 2b Nov-04 22 of 22 LAT Pointing Calculations 10a Igor V. 0 of 2 Vehicle Signals Interface Verification 5 Mark Mao Jan-05 3 of 5 Electronic Calibration 8b Feb-05 0 of 4 Narrowband Telemetry Verification 3 SIU/EPU CPU-to-CPU Communications Functional Test 6a 0 of 1 LAT Thermal Control System (TCS) 15 Eric Event Filtering – Reception of Events and Verification of Filtering Algorithm 8a Mar-05 27 Jan 2005 LAT Monthly - FSW Status

FSW Test Readiness Status/Schedule Test Name Test Number Responsible Eng. Planned Procedure/Script Development Actual Additional Science Processing – Repointing Logic 12b Igor V. Mar-05 EPU Internal Configuration Test 6b Igor K. LAT Time Signal Processing 10b Wideband Telemetry Verification 4 Apr-05 GRB Handling/Repointing Requests 11 T&DF, TKR, CAL, and ACD Internal Configuration Test 7 Additional Science Processing – GRB detection and location 12a Operational Modes – Safe Modes 13a Eric Operational Modes – Science Modes 13b LAT Diagnostic and Calibration Modes 14 LAT Event Performance Monitoring and Operations 16 May-05 27 Jan 2005 LAT Monthly - FSW Status

FSW Test Script Progress 27 Jan 2005 LAT Monthly - FSW Status

FSW Develop and Test Schedule Through FQT Code Develop Integrate FSW Candidate Release Test Plan Procedures Test Integration/Demos Candidate Release Testing Dry Run TRR CR #1 CR #13 FQT PQTR Oct 04 Nov 04 Dec 04 Jan 05 Feb 05 Mar 05 Apr 05 May 05 Sept 04 June 05 July 05 27 Jan 2005 LAT Monthly - FSW Status