Scope of the Meeting: the Framework of the Collimation Project

Slides:



Advertisements
Similar presentations
Simulation priorities for 2015 R. Bruce for task 5.2.
Advertisements

Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
6/14/11 Collimation Upgrade Plan & Questions R. Assmann, CERN for the collimation team 14/6/2011 LHC Collimation Project Review.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Stefano Redaelli, CERN, BE-ABP for the Collimation Project and HL-LHC-WP5 teams The LHC Collimation Baseline for HL-LHC 3 rd Joint HiLumi LHC-LARP Annual.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Concept of a Collimation System with Enhanced Operational Stability and Performance.
Ion operation and beam losses H. Braun, R. Bruce, S. Gilardoni, J.Jowett CERN - AB/ABP.
DS Heat Load Scenarios in Collision Points and Cleaning Insertions. Prepared by F. Cerutti, A.Lechner and G. Steele on behalf of the FLUKA team (EN-STI)
RA CPM 21/2/03 1 Present Approach and Status R. Assmann for the LHC Collimation Team Problem: Al/Cu system would not resist irregular dumps (pre-trigger.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Stefano Redaelli, CERN, BE-ABP on behalf of the LHC Collimation Project and HiLumi WP5 LHC Collimation Status and Plans 2 nd Joint HiLumi LHC-LARP Annual.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
Stefano Redaelli on behalf of the Collimation Project, HL-LHC-WP5, EuCARD, US-LARP teams LHC Collimation Upgrade plans The HiLumi LHC Design Study is included.
RWA, GSI 11/07 Beam Loss and Collimation at the LHC R. Assmann, CERN/AB 15/11/2007 for the Collimation Team GSI Beschleunigerpalaver.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
RWA, 4/11/2005 Review Movement & Motorization November 4 th, 2005 Program Introduction & Charge – R. Assmann Mechanical design & SPS results – O. Aberle.
Joint IR Studies: Operating Margins Nikolai Mokhov Fermilab bnl - fnal- lbnl - slac US LHC Accelerator Research Program LARP Collaboration Meeting SLAC.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Heat Deposition Pre-Evaluation In the context of the new cryo-collimator and 11-T dipole projects we present a review of the power deposition studies on.
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
WP2: Beam dynamics and optics Workflow between Work Packages 1 O. Brüning – BE-ABP WP2 HL-LHC meeting 17. November 2011.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Ralph Assmann 1
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
News and Introduction from CERN June 15th, 2005
ICE SECTION The coolest place to be! Elias Métral
Ion Commissioning: Thursday & Friday
Tracking simulations of protons quench test
S. Roesler (on behalf of DGS-RP)
The LHC - Status Is COLD Is almost fully commissioned
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
LHC collimation MDs, crystals and halo control
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Plan for Collimator Commissioning
Progress in Collimation study
Federico Carra – EN-MME
Energy deposition studies in IR7 for HL-LHC
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Intensity Evolution Estimate for LHC
Beam loss mechanisms in relativistic heavy-ion colliders
CERN, Geneva, Switzerland PAC 2003 – Portland, Oregon, USA
Proton Intensity Evolution Estimates for LHC
Introduction to dispersion suppressor collimation
The 4th International Particle Accelerator Conference, IPAC13
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Collimation Requirements
Optic design and performance evaluation for SPPC collimation systems
Why do BLMs need to know the Quench Levels?
Collimation after LS1: cleaning and β* reach
Collimation margins and *
Beam Loss Simulations LHC
Wednesday June 30,  40-S2-A01 (open session)
Introduction and Requirements
Collimators: Operations - Baseline Assumptions
Improving Collimator Setup Efficiency
FLUKA Energy deposition simulations for quench tests
LHC Phase II Collimation
Presentation transcript:

Scope of the Meeting: the Framework of the Collimation Project R.W. Aβmann Meeting on Interface 11 T - Cold Collimation 5 Oct 2011, CERN 3 Primary Collimators in Betatron Cleaning (IR7) 04/10/2011

The Collimation Project Team & Close Collaborators Results on phase I collimation are outcome of lot of work performed over last 9 years by the following CERN colleagues: O. Aberle, J.P. Bacher, V. Baglin, G. Bellodi, A. Bertarelli, R. Billen, V. Boccone, A.P. Bouzoud, C. Bracco, H. Braun, R. Bruce, F. Burkart, M. Cauchi, J. Coupard, D. Deboy, N. Hilleret, E.B. Holzer, D. Jacquet, J.B. Jeanneret, J.M. Jimenez, M. Jonker, J. Jowett, Y. Kadi, K. Kershaw, G. Kruk, M. Lamont, L. Lari, J. Lendaro, J. Lettry, R. Losito, M. Magistris, A. Masi, M. Mayer, E. Métral, C. Mitifiot, N. Mounet, V. Parma, R. Perret, S. Perrolaz, V. Previtali, C. Rathjen, S. Redaelli, G. Robert-Demolaize, C. Roderick, S. Roesler, A. Rossi, F. Ruggiero, M. Santana, B. Salvachua, R. Schmidt, P. Sievers, M. Sobczak, J.P. Tock, K. Tsoulou, G. Valentino, E. Veyrunes, H. Vincke, V. Vlachoudis, T. Weiler, J. Wenninger, D. Wollmann, … Crucial work also performed by collaborators at: EuCARD/ColMat partners (see GSI talk), TRIUMF (D. Kaltchev), IHEP (I. Baishev & team), SLAC (T. Markiewicz & team), FNAL (N. Mokhov & team), BNL (N. Simos, A. Drees & team), Kurchatov (A. Ryazanov & team). 04/10/2011

The Last Phase 1 Collimator 04/10/2011

Many PhD‘s & Fellows Related to Collimation This challenging topic attracts many excellent students and fellows! PHD‘s (some later fellows): C. Bracco, M. Brugger, M. Cauchi, A. Dallocchio, D. Deboy, L. Lari, V. Previtali, G. Robert-Demolaize, G. Valentino, ... Master students: F. Burkart, ... Fellows: R. Bruce, S. Redaelli, B. Salvachua, T. Weiler, D. Wollmann, FLUKA fellows for collimation, ... 04/10/2011

Quench Limit of LHC Super-Conducting Magnets Nominal design at 7 TeV Beam 362 MJ 56 mm SC Coil: quench limit 5-30 mJ/cm3 04/10/2011

Quench Limit of LHC Super-Conducting Magnets Situation at 3.5 TeV (on September 26, 2010) Beam 6.2 MJ LHC beam is about 60,000,000 times above quench limit of super-conducting magnets (per cm3)! Of course, diluted… Not a single beam-induced quench at 3.5 TeV yet! 56 mm SC Coil: quench limit 15-100 mJ/cm3 04/10/2011

Loss rate: 9e11 p/s @ 3.5 TeV  505 kW 16 bunches, 3.5 TeV Provoked beam loss: beam blow up on 1/3 resonance Loss rate: 9e11 p/s @ 3.5 TeV  505 kW 04/10/2011

Leakage into SC Magnets 3.5 TeV operational collimator settings (not best possible) No quench of any magnet! 04/10/2011

Settings in nominal beam sigma at 3.5 TeV Settings in mm at 3.5 TeV for tightest collimator settings achieved (beam 1) 04/10/2011

Observed Losses (Normalized to Primary Collimator) 99.995 % 04/10/2011

(In) Efficiency Reached (Coll  SC Magnet) 99.960 % worse 99.995 % MD better 04/10/2011

LHC Collimation Status & Outlook The LHC collimation problem has been solved for nominal beam: Design goals for nominal intensity and 7+7 TeV beams were demonstrated. Better than design cleaning efficiency was shown. In addition gain from lower than specified beam losses. Some improvements are ongoing (e.g. minimize collimation setup time): Faster collimation setup with direct feedback from beam loss monitors (2011/12 christmas stop). IR2 collimator move (2011/12 christmas stop). Replacement of IR1/2/5/8 tertiary collimators and IR6 collimators with BPM collimator design  faster setup, lower beta* (long shutdown 1). Radiation measures: remote handling, easy handling, remote survey, ... R&D on low impedance materials (collimation phase 2, for LS2) R&D on new solutions: hollow e-beam lens, crystal coll., non-linear coll. On long-term (LS2, performance > nominal) expect to become limited by fundamental losses into LHC dispersion suppressors: Protect dispersion suppressor collimators in IR1/2/3/5/7/8 04/10/2011

Work Ahead for DS Collimation Concept Specify cases for collimation (p intensity, ion intensity, lifetimes, p-p luminosity, Pb-Pb luminosity, any other future use cases) for IR1/2/3/5/7/8 independently, including HL-LHC parameters! Define candidate locations for DS collimators, candidate material and candidate jaw length (also 1-sided vs. 2-sided). Define gaps for DS collimators. Simulate collimation efficiency (SixTrack with Collimation) for defined cases. Vary parameters (material, length, gaps). Possibly iterate location until losses for all cases are reliably intercepted (study 1 versus 2 collimators per DS). Once OK for beam losses, define reference case (material, length, gaps, locations). Define power load. Try to have one collimator solution. Calculate energy deposition (FLUKA) and heating for defined cases, including accident cases. Calculate jaw temperature and cooling. Check response to accident cases (ANSYS). Define design reference case. Check impedance and trapped modes (RF simulations). Iterate if necessary. Freeze design. 04/10/2011

Collimation Work Organization Collimation project management & project meeting Collimation upgrades in DS’s and IR’s: Studies and specifications DS upgrade technical feasibility Phase 1 studies and improvements includes BE studies crystal coll, coll with BPM’s, hollow e-beam lens Collimator design and production 04/10/2011

Upgrade Dispersion Suppressors Assumed solutions: 11T or IR3-type (magnet movements) Scope: IR1, IR2, IR3, IR5, IR7 for proton and ion losses DS upgrade specification: Forum: Upgrade specification meeting Mandate: Specify jaw material & length, collimator gaps & precision, collimator locations and power loads, performance improvement Scope: loss simulations, tracking with protons and ions, energy deposition, radiation impact, optics studies, operational studies Runs until specification is provided DS upgrade technical feasibility: Forum: Technical integration meeting (V. Parma & J.P. Tock) Mandate: Feasibility of installing cold collimators, housed in cryo-assemblies, in the continuous cryostat during LHC LS2 Collimator design for dispersion suppressors (warm/cold)  Coll Design Meeting 04/10/2011

Conclusion The LHC collimation system is very powerful but cannot protect the LHC dispersion-suppressors (long predicted, due to basic physical limits). On the long term (for much beyond nominal performance, e.g. for HL-LHC) we will need to protect the dispersion suppressors against losses from collimation insertions and collisions. 11T magnets provide an elegant solution to the problem (preferred). Backup solution is the movement of magnets and use of missing dipole space (much less elegant). A lot of work is ahead to work out a detailed a solution and to prove that the 11T solution with collimator delivers the required performance: Collimation efficiency and power loads for future requirements (nominal is not enough). Behavior of cold surfaces under power load, cooling, ... Technical feasibility of integration of a long collimator into an 11T assembly. Developments must be advanced in parallel to explore all possible issues early. Plan for success. We have all the tools and experience to advance this efficiently. 04/10/2011

Thank you ... Now more details from Adriana... 04/10/2011

DS Upgrade Technical Feasibility What ? Feasibility of installing really cold collimators, housed in cryo-assemblies, in the continuous cryostat during LHC LS2, as required by collimation (pt.1, 2, 3, 5 and 7)? Goals Analyze potential schemes of cold collimators coupled to 11 T magnets; Identify potential show stoppers, either related to the implementation of the layout schemes or related to operational aspects of the associated technical systems (vacuum, cryogenics, machine protection, alignment, etc). Identify potential needs for R&D with its associated effort and timeline. How? Set-up a Working Group coordinated by MSC-CMI (V.Parma, J.Ph.Tock as alternate), meeting every 2-3 weeks with the following proposed participants by system: Collimators:, EN-MME Vacuum : V Baglin, TE-VSC Cryogenics : R.Van Weelderen, TE-CRG 11 T magnets: M Karppinen TE-MSC Machine Layout & Integration: V.Parma (J.Ph.Tock),TE-MSC HL LHC coordinator : L Rossi (TE-HDO) Collimation project leader or representative Reporting? to the Collimation Management Meeting. Technical feedback and requests to the specification meeting. 04/10/2011