Run coordinator report March 23 – 30, 2011

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
BSY D10 replacement dump Proposal Dieter Walz Alev Ibrahimov March
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
XFEL-INJ1/2 DUMPS Remarks / Requirements, Injector Beam Dynamic Review Meeting, DESY, Mon. 23. October 2006 ‹#› XFEL - INJ 1/2.
Design of Vacuum Chambers of SSRF Storage Ring Yonglin. Chen, Dikui. Jiang SSRF Vacuum Group Shanghai Institute of Applied Physics(SINAP) China Academy.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
AfterSalesTraining Welcome to AfterSalesTraining.
AEM Meeting E906/SeaQuest Kazutaka Nakahara University of Maryland 1/13/2014.
Run coordinator report March 23 – 30, 2011 Brad Sawatzky JLab MCC 1:30pm Meeting March 30, 2011 Q weak.
HMS Status Steven Lassiter Jan 20, 2017.
LCLS-II Technical Requirements
Hall C Readiness Review – Small Angle SHMS Operation
MICE Operations Scenario Run 1
Project Manager’s Report + DC/MoM Report
Vacuum System Failures at HERA
Hall A Target Status 9/27/16 Dave Meekins.
SNS Operational History
Summary Friday h38: Ramp down and pre-cycle.
Replacement of a Leaking Beam Port Bellows
Conventional Neutrino Beams Day 2
MICE Coupling Coil Update
The PEP-II Interaction e+e- Factories Workshop
How to Detect Leaks in Your Car's Exhaust Manifold.
Hall C Down Stream Beam Pipe And Dump Interface Design
Auto Upkeep Basic Car Care, Maintenance, and Repair (2nd Edition)
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Anthony DiPette Installation / Vacuum Group Leader 7/17/2015
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Summary Thursday h21: Stable beams fill #1303.
C100 Refurbishment Brainstorming
Hall C Dump Status Beam Resuscitation Review
Beam Halo Considerations for Back Angle Running
Summary Tuesday h23: Machine closed. Precycle started.
SR Background Update for JLEIC
Polarized 3He target installation
Presentation transcript:

Run coordinator report March 23 – 30, 2011 Brad Sawatzky JLab Hall C Weekly Meeting March 28, 2011

Summary (1) Fix bad vacuum in beamline downstream of target Noted that there was a significant hot-spot at the 1 o'clock position (roughly 10x higher than 7 o'clock) Extensive leak checking up and down the line made difficult by the poor vacuum, RGA doesn't work well found large leak at seal on downstream bellows flange, (partially) resealed when 3 bolts were tightened near the 1 o'clock position Working hypothesis is that small-angle Mollers, etc. are being swept by QTor into the flange. Did a quick test plan on Thursday with tune beam and recently repaired dump viewer: http://opsweb.acc.jlab.org/CSUEApps/atlis/task/10990 http://opweb.acc.jlab.org/CSUEApps/elog/entry/1576387 Primary beam is indeed steered up and to the right – ie. in the direction of the hot spot.

Beam Spot at dump w/ QTOR at 2.0 kAmp

Beam Spot at dump w/ QTOR at 8.9 kAmp Roughly 2cm shift toward upper right. Jay attempted to find a magnetically neutral trajectory. No Luck. Best indications are that this shift has been there since summer. Can not find ELOG to verify one way or the other.

The Plan® Developed with input from Ops, JRRP, Radcon, ... Replace the gasket at the leaky flange. Add thermometry to flange. Nominal warning limit is 125 C, “HIHI” is 175 C (stay above the “knee” in Al 6061-T6 tensile strength vs temperature) Add cooling fan on bellows/flange region. Pre-run piping for water cooling around bellows/flange, leave connection points well outside historical radiation area. Not connected now, but could be hooked up later if needed. Updated the COO with section discussing regions that accumulate significant radiological activity. Engineering will run some models to get a better feel for thermal stresses on joints in the bellows region.

To Do List Get back up and running! Un-park target. Test plan for Scanner to study effects of MD pre-radiator. Scanner has been repositioned downstream of MD in preparation. Get back up to production running at full current Do this in steps, while monitoring temps and watching for plateau. Moller on Wednesday? There was a spot move last Thursday, this will be first polarization measurement since then. Miscellaneous New hardware for cdaql3, moving bulk of online analysis load to that machine. (Paul says we're close on getting the full analysis stage moved to the Farm.) FFT and position difference studies continue (Buddhini, Jay: care to comment?) Fill shift schedule!

Shift Schedule is “sparse”