Prototype activities update

Slides:



Advertisements
Similar presentations
Recent news about SiPM based applications R&D in DESY Nicola D’Ascenzo University of Hamburg - DESY.
Advertisements

Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
Performance of new strip scintillator Jungeun Lee, Jaeyun Choi, Kyungpook National University Minseok Park.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
T1008 status W.Baldini for the Ferrara and Padova SuperB-IFR Group.
Status of scintillator KLM study P. Pakhlov (ITEP)
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Study of the MPPC performance - R&D status for the GLD calorimeter readout – Nov 6-10.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
28 June 2007G. Pauletta: ALCPG Tests of IRST SiPMs G. Pauletta Univ. & I.N.F.N. Udine Outline 1.IRST SiPMs : baseline characteristics 2.first application.
Gain stability and the LYSO beam radiation monitor measurements
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
first results from EMCal test beam
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
SPHENIX EMCAL R&D Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Super-IFR Detector R&D summary Wander Baldini Ferrara, Padova, Roma1 INFN and University on behalf of the superB-IFR group: Ferrara, Padova, Roma1 INFN.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
FTOF Status Anton A. Izotov, Frascati
IFR Status Report W. Baldini, on behalf of the Ferrara SuperB-Group XIV SuperB General Meeting, Frascati Sept.27 – Oct
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
TOF Update GlueX Collaboration Meeting Jefferson Lab May 12, 2009 Paul Eugenio & Alexander Ostrovidov Florida State University.
Prototype Assemblying, SiPM Characterization and QC
IFR Detector R&D status
IFR Detector R&D status
Activities and Results from PNPI GATCHINA
Wander baldini on behalf of the SHIP Muon Group
Roberto Calabrese Ferrara University and INFN
Straw prototype test beam 2017: first glance at the data
H.E. Fisk, A. Meyhoefer, A. Para, E. Ramberg, P. M. Rubinov Fermilab
Overview of SuperB Particle identification, and work towards the TDR
Commissioning of the Crystal evaluation setup
IFR Status Summary W. Baldini on behalf of the IFR Group
SuperB meeting, Frascati
Status of Prototype Preparation and SiPM Characterization
Backward Calorimetry For SuperB
The Beam Test at Fermilab:
Focusing Aerogel RICH with SiPM Photodetectors
Preliminary Performance of the L2 Chamber (Side A)
IFR detector mechanics
CLAS12 Forward Detector Element PCAL
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
Vishnu V. Zutshi For the NICADD team.
ITEP&MEPhI status report on tile production and R&D activities
R&D of MPPC for T2K experiment
Efficiency Study of Prototype Scintillator for INGRID
Scintillator HCal Prototype
General Introduction to IFR
T2Kロシアグループに向けたMPPC(SiPM)の性能評価
CLAS 12 Status of the test bench Calculation of the time resolution
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
The MPPC Study for the GLD Calorimeter Readout
Presentation transcript:

Prototype activities update W. Baldini on behalf of the Ferrara IFR Group XXVII SuperB Workshop and Kick off Meeting Isola d’Elba May 28 - June 02 2011

Prototype activities in Ferrara After the Fermilab beam test the prototype has been shipped back and is now installed and running in Ferrara The configuration is the same as at Fermilab: Same Pizza Box configuration (CP1) Distances among PB are the same No Iron We are following the plan showed in Frascati in April: Taking cosmic data overnight with different working conditions (Vbias , thresolds ..) Improvements, debugging and other measurements during the day Pizza Boxes

Plans for cosmic data taking (from frascati meeting) At the very beginning triggering with the upper and lower-most layers, mainly for debugging purposes As soon as we reach a stable condition, switch to an external scintillator trigger and measure: Efficiency and time resolution for different SiPM bias voltages (to understand a strange behaviour of some PB @ the testbeam) Number of p.e./mip for the different combinations of scintillator-fibers-SiPM (at the testbeam not enough time…) Test the special module with MPPC (not tested at the Dic. testbeam) Comparison with testbeam data Done Done Ongoing Ongoing

Cosmic Data Taking schedule Date Filename Start Stop N evts Run # Comments May 11 FEEConfig_base Baseline conf. (G=14,17) May 12 FEEConfig_High_Gain High Gain (15,18) May 13 FEEConfig_High_Gain_2 High Gain (16,19) May 14 FEEConfig_AllV_32.75V All channel @ 32.75V May 15 FEEConfig_AllV_33.00V All channel @ 33.00V May 16 FEEConfig_AllV_33.25V All channel @ 33.25V May 17 FEEConfig_AllV_33.50V All channel @ 33.50V May 18 FEEConfig_AllV_33.75V All channel @ 33.75V May 19 FEEConfig_AllV_34.00V All channel @ 34.00V May 20 May 21 May 22 May 23 Pulser – th scan Random trigger May 24 May 25 May 26 Due to problems with the high temperature (up to 32 C) some runs have to be repeated see Gigi’s Talk on Tuesday

Light Yield measurement Measure how many p.e. we have for different options: Scint. 1 or 2 cm thickness WLS fibers 1.0 mm vs 1.2 mm in diameter SiPM 1.2x3.2 mm2 (4020) vs 1.4x3.8 mm2 (4380) The method is very simple: measurement of the gain (2pe – 1pe) on the Dark count spectra In the same conditions (Vbias,T) measure the average signal on cosmics, triggering on the other SiPM of the same scintillator, with a high threshold (5-6 pe). Npe= Average-signal/G

Light Yield Measurement: the method 1 pe 2 pe Gain Dark count (low Thr) Cosmic Signal (High Thr on other SiPM) signal pedestal Npe = (sig. – ped)/Gain

Light Yield Measurement: preliminary results Fiber length L=3.25m Fiber length L=0.75m Pizza box #1 (scint=2cm, fib=1.0mm, SiPM=4020 ) This are very preliminary results, high temperature (up to 32 °C, no air conditioning yet…)

Light Yield Measurement: next steps Measure the light yield for other configurations: PB #5 : fibers 1.2mm in diameter and SiPM 1.4x3.8mm2 PB with 1cm scintillator and Kuraray 1.0 and 1.2mm fibers Measure precisely the temperature dependence of Gain (and Dark Count rate) in order to make corrections on Vbias settings Test MPPC module (PB #7) and compare with SiPM

Preparation for the next testbeam Exploit the previous experience to optimize the next data taking: Cerenkov cables: prepare 75W  50W adapters larger S3,S4 scintillator Faster S1-S2 scintillator (or use the TOF) …. Other?? Cerenkov gas: check if the bottle is still full Understand how to reduce SiPM temperature on site Start shipping procedure…

Next main activities Testbeam in July-August (Ju;y 13-20 installation, July 20 – Aug 3 data taking Testbeam data analysis and comparison with MC simulations Radiation damage test (LNL or ENEA) : monitoring of current, Dark Count rate, Gain vs dose direct comparison unshielded/shielded devices comparison SiPM and MPPC Design of SiPM Mass Characterization setup TDR: collect all data and start writing