Electron cloud & vacuum pressure observations: 2011 proton run

Slides:



Advertisements
Similar presentations
Radiation Levels in ALICE Andreas Morsch Meeting on ALICE Radiation Tolerance 30/8/2004.
Advertisements

Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Vacuum and Cryogenics observations for different bunch spacing J.M. Jimenez On behalf of CRG and VSC Groups with the contributions of G. Arduini, V. Baglin,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
1 LHC vacuum Rossano Giachino Acknowledgments Jimenez,V.Baglin,J.C.Billy,I.Laugier Rossano Giachino November 2007.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Beam screens in IT phase 1
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
1 Vacuum chambers for LHC LSS TS Workshop 2004 Pedro Costa Pinto TS department, MME group Surface Characterization & Coatings Section.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
1 Vacuum in LER and HER. First estimation for the pumping system requirements (part II) A.Variola for B.Mercier, C.Prevost Annecy - Mars 2010.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Electron Cloud Effects
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Studies at BINP Alexander Krasnov
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Heat load estimates for the Long Straight Sections of the HL-LHC
Some Thoughts About Possible Measurements with SR at DaFne
LHC Machine Status report
Machine Coordinators: G. Arduini, J. Wenninger
G.Bregliozzi - VSC-LBV Section Collimation working group 08/07/02013
Study of the Heat Load in the LHC
Long Shutdown for the LHC: Vacuum Beam Pipes
CEPC Vacuum System Dong Haiyi 2017/11/5.
Electron cloud and collective effects in the FCC-ee Interaction Region
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Requirements from the Vacuum Systems HE-LHC
BINP New SR beam line at BINP for photo-desorption and photo-electron emission investigations. Experimental program for HiLumi. Options for future experiments.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Study of the Heat Load in the LHC
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
TDI with large gaps V. Baglin (21/10/11) CERN TE-VSC, Geneva
Summary of Week 16 G. Arduini, J. Wenninger
Discussion on the TDI impedance specifications
Scrubbing progress - 10/12/2012
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Monday 24 October hours of 25ns MD
Summary first Scrubbing test 31/10/2010
X-rays in A4L2-A4R2 and A4L8 - A4R8 V. Baglin (19/11/11)
CINVESTAV – Campus Mérida Electron Cloud Effects in the LHC
Scrubbing progress - 08/12/2012
IP8 aperture measurements (07:30-10:30)
CEPC Vacuum Systems Design Consideration
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Cryogenic management of the LHC Run 2 dynamic heat loads
Preliminary Results of MD wk46 V. Baglin, G. Bregliozzi, P. Chiggiato,
Presentation transcript:

Electron cloud & vacuum pressure observations: 2011 proton run G. Bregliozzi on the behalf of the TE-VSC group General layout of the LHC vacuum system Electron cloud at 25 & 50 ns: Vacuum Observation Pressure Spikes & Heating effects Strategy and Mitigation solutions Conclusion

The LHC cryogenic vacuum system Stand Alone Magnet at 4.5 K in LSS ARC and IT at 1.9 K Beam Screen @ 5 – 20K Unbaked LHe RT compatibility reason with cryo vacuum system L ~ 0.5 m Cold-Warm transition It takes advantage of the cryogenic cooling for the superconducting magnets: the pumping is distributed onto surfaces cooled at temperature in the range 1.9 to 20 K. Gauge Cold beam pipes (Stand Alone Magnet) are also present in the 8 long straight sections. Cold-Warm transition present in each connections between room temperature and cryogenic system: unbaked due to compatibility reason with cryogenic vacuum system and vacuum sectorization. G. Bregliozzi – TE-VSC-LBV 2

The LHC RT vacuum system The pumping system rely mainly on TiZrV thin film coating with some localised ion pumps “Combined” sector both side of each experiment Both beams circulates in the same beam pipe NEG-NEG Area Gauge Baked Uncoated parts in the room temperature beam pipes “Twin” sector Beams circulate in different beam pipes Gauge Gauge G. Bregliozzi – TE-VSC-LBV 3

Electron Cloud at 25 & 50 ns Vacuum Observation

Vacuum System Performances Secondary Electron Yield: TiZrV C. Scheuerlein et al. Appl.Surf.Sci 172(2001) No electron cloud in NEG areas after vacuum activation Baked and unbaked cryogenic areas requires scrubbing V. Baglin, R. Cimino, 2003 G. Bregliozzi – TE-VSC-LBV 5

E-cloud Effects in LHC Vacuum at 50 ns Pressure increase is function of the h (Baked and Unbaked), pumping speed and length of the area . Two distinctive area in the LHC: Unbaked and baked. 10-11 10-6 444 bunches 1·10-7 Factor 5 2·10-8 Bunch spacing 50 ns G. Bregliozzi – TE-VSC-LBV Data from 20.11.2010 No Scrubbing and Vacuum Cleaning: Almost as received surfaces 6

E-cloud Effects in LHC Vacuum at 25 ns Still two distinctive area in the LHC: Unbaked and baked. 10-11 10-6 2100 bunches Cold-Warm Transition apparently high pressure increase.......... 8·10-8 Factor 50 Bunch spacing 25 ns 1.5·10-9 Baked System: clear indication of pre-scrubbing and pre-cleaning at 50 ns Bunch spacing 25 ns G. Bregliozzi – TE-VSC-LBV 7 Data from 14.10.2011

Drift: Baked and Unbaked transition Bend: ARC with saw tooth Heat load due to electron cloud effects: Bending magnets and drift spaces Drift: Baked and Unbaked transition Bend: ARC with saw tooth 50 ns Larger conditioning rate in field free regions compared to ARC and stand alone magnets. Pressure increase in baked and unbaked transitions was limiting the LHC performance. 25 ns Baked and Unbaked transitions: almost fully scrubbed. Pressure increase: dominated by desorption of beam screen (~24 Km of LHC) LHC performance limited by electron density in ARCs with high power dissipated in the beam screen. F. Zimmermann: LHC Project Note 201 Simulated heat load due to electron cloud as a function of the maximum secondary electron yield for bending magnets and drift spaces in the LHC arcs G. Bregliozzi – TE-VSC-LBV 8

E-cloud Effects in LHC Vacuum at 25 ns Effectiveness of the scrubbing Case of Cold-Warm Transition 25 ns operation just at the limit of the multipacting threshold Absence of “optimized” beam cleaning 8·10+10 p/b New beam time is required for further scrubbing and analysis at 25 ns G. Bregliozzi – TE-VSC-LBV 9

Synchrotron radiation Effectiveness of 25 ns scrubbing run Pressure reduction observed during the year while accumulating photon dose Accumulated dose so far 1023 ph/m Beam conditioning of the arc vacuum system Further cleaning after 25 ns MDs G. Bregliozzi – TE-VSC-LBV 10

Pressure Spikes & Heating Effects

Pressure Spikes in LSS2 and LSS8 Frequently, pressure spikes are observed mainly at LSS2 and LSS8 Location of pressure spikes is in LSS2 and LSS8: TCTVB-TCLIA/TCDD areas Fill 2266 Fill 2267 Spikes during stable beams above 10-8 mbar D1L2, D1L8, D1R8 Spikes during injection and stable beams above 10-7 mbar D1L8, D1R8

Typical default in the RF Finger TCDD Point 2 Left side: Side view VGPB.120.4L2.X D1L2 Heating of RF fingers and spring holding the RF fingers in contact with the slots Spring and RF fingers were deformed between May and November 2011 During beam operation possible electric arcs could induce degassing: pressure spikes VPIA.A151.4L2.X Christmas break: The non-conform modules will be repaired and consolidated. Further studies ongoing. G. Bregliozzi – TE-VSC-LBV 13

Pressure increase in TDI LSS2 and LSS8 Target Dump Injection for LHC (78 m from IP2) LSS 2 TDI Jaws Distance:  22 mm: pressure increased  55mm : pressure stays at 10-8 mbar LSS 8 Christmas break: the pumping at TDI2L will be doubled 22mm 55mm G. Bregliozzi – TE-VSC-LBV 14

CMS Forward Area: Pressure Increase CMS background suffers from pressure rise localized around 18 m from the IP Fill 2241 at 50 ns bunch spacing Fill 2251 at 25 ns bunch spacing, small pressure rise were detected The CMS magnetic field ensure the multipacting suppression Pressure excursion at 18 m does not seems to be triggered by multipacting Christmas break: X-Ray and upgrade of pumping system G. Bregliozzi – TE-VSC-LBV 15

ALICE Background ALICE background is dominated by the pressure rise at 110 m from IP that must be below 10-8 mbar One layer (1 Km) of solenoid was installed at each extremity to check potential electron cloud activity: a small reduction of the pressure was observed with solenoid ON. Christmas break: layout will change, NEG reactivation and possible solenoid re-installation (2 layer). G. Bregliozzi – TE-VSC-LBV 16

Strategy & Mitigation Solutions

LHC Strategy for Electron cloud The LHC Strategy is scrubbing “Operating the LHC with nominal parameters relies on the surface conditioning (scrubbing) effect, akin to the process of an RF cavity, by which the secondary emission yield decreases from an initial value of about 2 to about 1.4 or below, after depositing a sufficient dose of electrons on the chamber wall. During commissioning, when the yield is still high, an increased bunch spacing and/or a reduced bunch intensity will greatly reduce the heat load….” From LHC Design report (p. 116). Scrubbing and vacuum cleaning at 25 ns  For operation at 50 ns Some LSS sectors are vented during Christmas break: need a new scrubbing and cleaning of these area. Scrubbing Run Scenario: Optimize time and efficiency. Higher and stable beam intensity >1.1 – 1.2·1011 p/b Fill the machine with lower number of bunches while keeping stable intensity: 72 trains injection, then 144 trains and finally 288 trains. Determination of scrubbing efficiency: when the beam is dumped, injection of just 1 train with a fixed p/b intensity to check pressure increase. Could be applied after each TS for 24-48 h of time or for a dedicated MD (7-10 days) : the earlier the better. G. Bregliozzi – TE-VSC-LBV 18

Mitigation solutions Mitigation Solutions for Electron Cloud Installation of solenoids in non-coated areas: In MKI regions to decrease pressure increase during scrubbing run and ID800 to decrease ALICE background. Increase local pumping speed by the use of NEG cartridges: Vacuum pilot sector for 2012 run: TDI, VAMTF module in LSS2 and in the cold-warm transition of ITL2 & ITR2. Mitigation Solutions for Heating Effects TDI: It was shown that running the machine with a gap of  50 mm limit the increase of pressure and temperature in the TDI jaw. VAMTF Modules (Location of pressure spikes): Installation of different springs to withstand high temperature. Add NEG cartridges to increase pumping speed. ALICE ZDC in LSS2: Layout will be changed during Christmas break. NEG reactivation and possible solenoid re-installation(2 layers). G. Bregliozzi – TE-VSC-LBV 19

PRESSURE SPIKES AND HEATING EFFECTS Conclusions ELECTRON CLOUD Scrubbing period with 50 ns was very efficient to reduce the stimulated gas desorption and increase the multipacting threshold During this period, pressures increased in the range 10-7 mbar. During the year, average pressures were in the range 10-9 mbar. 25 ns beams stimulated further gas desorption from the beam screen of ARCs and stand alone magnets: pressure increased again in the range 10-7 mbar Another period with 25 ns with <ppb> above threshold is needed for further scrubbing and analysis. PRESSURE SPIKES AND HEATING EFFECTS Pressure increase in TDI and ALICE should be significantly reduced thanks to new layout and the increased parking distance between the TDI jaws. Consolidation of vacuum module: New spring material and additional pumping. CMS: Upgrade pumping system and X-rays as complementary diagnostic G. Bregliozzi – TE-VSC-LBV 20