Gonçalo Borges on behalf of LIP

Slides:



Advertisements
Similar presentations
INFSO-RI Enabling Grids for E-sciencE Operation and management issues in the EGEE/SWE grid infrastructure G. Barreira, G. Borges,
Advertisements

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 report for LIP-Lisbon Gabriel Amoros on behalf of LIP-Lisbon J. Aparício, G. Barreira,
EGEE is a project funded by the European Union under contract IST SA1 and NA3 Alistair Mills Grid Deployment Group +41.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Pilot Test-bed Operations and Support Work.
The Preparatory Phase Proposal a first draft to be discussed.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
Co-ordination & Harmonisation of Advanced e-Infrastructures Research Infrastructures – Grant Agreement n Regional progress report: Mediterranean.
EGEE-II INFSO-RI Enabling Grids for E-sciencE AP ROC Min-Hong Tsai ASGC SA1 Transition Meeting May 8 th, 2008
Climate Sciences: Use Case and Vision Summary Philip Kershaw CEDA, RAL Space, STFC.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
Enabling Grids for E-sciencE EGEE III Security Training and Dissemination Mingchao Ma, STFC – RAL, UK OSCT Barcelona 2009.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
The EGI Blueprint: Grid Operations and Security Migration to the next grid operations era Tiziana Ferrari (Istituto Nazionale di Fisica Nucleare)
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Enabling Grids for E-sciencE 1 EGEE III Project Prof.dr. Doina Banciu ICI Bucharest GRID activities in RoGrid Consortium.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
October 2006ICFA workshop, Cracow1 HEP grid computing in Portugal Jorge Gomes LIP Computer Centre Lisbon Laboratório de Instrumentação e Física Experimental.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
LIP workshop LIP Computing Overview Jorge Gomes Laboratório de Instrumentação e Física Experimental de Partículas.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 work in the SWE Federation Antonio Fuentes.
7 September 2007 AEGIS 2007 Annual Assembly Current Status of Serbian eInfrastructure: AEGIS, SEE-GRID-2, EGEE-II Antun Balaz SCL, Institute of Physics,
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Ian Bird LCG Project Leader On the transition to EGI – Requirements from WLCG WLCG Workshop 24 th April 2008.
WLCG Laura Perini1 EGI Operation Scenarios Introduction to panel discussion.
Grid Activities in Portugal Gonçalo Borges Jornadas LIP 2010 Braga, Janeiro 2010.
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
AEGIS Academic and Educational Grid Initiative of Serbia Antun Balaz (NGI_AEGIS Technical Manager) Dusan Vudragovic (NGI_AEGIS Deputy.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Deliverable DSA1.4 Jules Wolfrat ARM-9 –
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
Dr. Isabel Campos Plasencia (IFCA-CSIC) Spanish NGI Coordinator ES-GRID The Spanish National Grid Initiative.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
FP6−2004−Infrastructures−6-SSA [ Empowering e Science across the Mediterranean ] EUMEDGRID NGIs F. Ruggieri – INFN (EUMEDGRID Project Manager) EGEE’07.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EGI-Engage is co-funded by the Horizon 2020 Framework Programme of the European Union under grant number GGUS Service Provider GGUS –
Pedro Andrade > IT-GD > D4Science Pedro Andrade CERN European Organization for Nuclear Research GD Group Meeting 27 October 2007 CERN (Switzerland)
NGI_TR Emrah Akkoyun TR-Grid Operational Center EGI-InSPIRE – SA1 Kickoff Meeting1.
EGI-InSPIRE Project Overview1 EGI-InSPIRE Overview Activities and operations boards Tiziana Ferrari, EGI.eu Operations Unit Tiziana.Ferrari at egi.eu 1.
Setting up NGI operations Ron Trompert EGI-InSPIRE – ROD teams workshop1.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
Grid Colombia Workshop with OSG Week 2 Startup Rob Gardner University of Chicago October 26, 2009.
1 The Life-Science Grid Community Tristan Glatard 1 1 Creatis, CNRS, INSERM, Université de Lyon, France The Spanish Network for e-Science 2/12/2010.
CESGA QR2 SA1-SWE Partner Coordination Meeting 2 CICA, Sevilla
Bob Jones EGEE Technical Director
Il Sistema di Supporto INFNGrid & GGUS (Global Grid User Support )
JRA2: Quality Assurance
Regional Operations Centres Core infrastructure Centres
EGEE is a project funded by the European Union
JRA3 Introduction Åke Edlund EGEE Security Head
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
EGEE support for HEP and other applications
Overview of IPB responsibilities in EGEE-III SA1
Networking support (SA2) tasks for EGI
The CCIN2P3 and its role in EGEE/LCG
LCG Operations Workshop, e-IRG Workshop
Connecting the European Grid Infrastructure to Research Communities
Leigh Grundhoefer Indiana University
Presentation transcript:

Gonçalo Borges on behalf of LIP LIP QR2 report Gonçalo Borges on behalf of LIP

General Information Beneficiary number: # 30 Beneficiary name: Laboratório de Instrumentação e Física Experimental de Partículas Beneficiary short name: LIP Country: Portugal Lead beneficiary (JRU): ROC: South West Europe (SWE) Period: QR2 (August-October 2008) LIP QR2 Report

Progress Report (1/3) TSA1.1: Grid Management Coordination/Interoperability with national and regional projects Ongoing deployment of the IBERGRID infrastructure between Portugal and Spain, the Portuguese national grid infrastructure, and EGI-DS. Infrastructure architecture assessment for interoperability between EGEE, the Portuguese NGI, and other infrastructures. Work with the Portuguese NGI to prepare the deployment and integration of a new national grid datacenter Contribution to the SWE ROC and coordination of the EGEE infrastructure in Portugal. Operation of the Portuguese Grid Certification Authority and its coordination with EGEE.   LIP QR2 Report

Progress Report (2/3) TSA1.2: Grid operations and support First line support for problems in the region. Operation of core services for the SWE region. Restructuring of the PPS service moving towards a VM based service. Support for new resources deployment at the PT LCG Tier-2 Upgrade of the computing/storage capacity in Lisbon, Coimbra and LNEC. Support for the Lustre and StoRM deployment in the PT Tier-2. Commissioning of new hardware at LIP To host the PPS and grid core services Blade center with iSCSI storage Prepare restructuring of the core services Assessment of virtualization techniques and iSCSI for supporting SWE core services in Portugal. Prepare the migration of the services to the new Portuguese NGI facilities at LNEC. Improvement of the monitoring capabilities. LIP QR2 Report

Progress Report (3/3) TSA1.3: Support to VOs, Users, Applications TPM in August. Trouble tickets routing for the SWE federation. Regional COD setup including training. Support for Portuguese users and sites. TSA1.4: Grid security Coordination of security in Portugal. Support for the security incident at UMinho-CP. Interoperability effort to include CERT-PT in the SWE security management. Relations and coordination with EUgridPMA.   Organize EUgridPMA meeting in Lisbon. LIP QR2 Report

Considerations (1/2) What are the deviations? Availability of the production and PPS services has been affected by the restructuring of the LIP-Lisbon and LIP-Coimbra resource centres. No effort was committed to… Training activities. Regional COD task. What is the main success in the reporting period? Successful support for the migration of the Portuguese Tier-2 storage systems to StoRM. Successful support for the Portuguese Tier-2 upgrades. Negotiations with Spain towards a regional federation for EGI and discussion of initial plans for migration of the EGEE SWE federation towards this model. The virtual environment to host the PPS and the core services is operational and looks promising LIP QR2 Report

Considerations (2/2) What is the main issue in the reporting period? Interoperability with other infrastructures in the context of the planning for the Portuguese NGI, IBERGRID and EGI. Hiring: how many SA1 PMs are still not assigned (e.g. because of hiring problems)? Not applicable. Which services are made available to EGEE… Two Resource Centres in operation in EGEE production infrastructure (LIP-Lisbon and LIP-Coimbra). Core resources (RB, WMS, Top-BDII, LFC, PX) in production for the SWE region. Deployment of core resources (RB, WMS, Top-BDII, LFC, PX) and resource centre resources for the EGEE pre-production infrastructure. LIP QR2 Report

Cross Activities contributions Milestones & deliverables: Not applicable. Review and moderation for others milestones and deliverables. Review of the MSA3.4.1 deliverable: “Definition and documentation of the revised software life-cycle”. A list of the participation of the partner in any of the main groups, task force, bodies PPS; TPM; ROC; PMB and CB Training: Not applicable. Publications: Not applicable. Standardisation bodies: EUGRIDPMA; TAGPMA. Anything else which is relevant. Participation in the EGEE’08 conference. Participation in the SWE ROC face-to- face meeting in Sevilla. Participation in the Spanish e-Science network workshop in Sevilla. Participation in the Cracow Grid Workshop (oral presentation) Participation in the ADVCOMP 2008 conference in Valencia (oral presentation) LIP QR2 Report

Comments Additional comments from Lead beneficiary (JRU): Initiatives to increase any type of centralization in the project should be avoided (centralized installation of middleware). Additional comments from ROC: The middleware architecture of EGEE should move towards an interoperable decentralized infrastructure towards the future NGI/EGI model enabling interoperability between national/regional autonomous infrastructures for example the information system model is yet centralized raising a lot of issues for infrastructures trying to interoperate between themselves. LIP QR2 Report