Standard Form of Contracts

Slides:



Advertisements
Similar presentations
The Important Thing About By. The Important Thing About ******** The important thing about ***** is *****. It is true s/he can *****, *****, and *****.
Advertisements

Section 12 Under Construction. Your role as the owner What to expect at the preconstruction meeting Dos and Dont during construction How to handle change.
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
ODOT Errors & Omissions Policy ODOT Errors & Omissions Policy ODOT/ACEC Conference Presentation April 17, 2007 Cathy Nelson, ODOT.
ABC Change Orders College of Environmental Design
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
NEC - Engineering and Construction Contract (ECC)
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Numbers
TRANSPORTATION PLANNING Session 06 Subject: S0012 / Introduction to Civil Engineering Year: 2007.
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
Indefinite Delivery/ Indefinite Quantity (IDIQ) Jorge A. Rueda.
2012 AASBO Summer Conference Insurance Pools as an Option in the Quest To Purchase Health Insurance Effectively Bill Munch, VSMG Ken Carter,
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Multiple Choice vs. Performance Based Tests in High School Physics Classes Katie Wojtas.
Ministry of Transport and Road Safety. Introduction Historical Approach to Contracting with Foreign Companies Current Policy and Requirements for Foreign.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
 Virtual construction CE 6016  Project 2013 Second Skin Facade to Civil And Environmental Engineering Building UCC The objectives of the project were.
King Fahd University of Petroleum & Minerals
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Project Procurement Management
Request for Proposals Notification When to use?. When to use….. Federal funds to be used as reimbursement for PE, R/W, CE. 100% local funds for PE and/or.
ELECTRICAL DISTRIBUTION FRAMEWORK CONTRACTS Presented by: Chris J van Rensburg to -- AMEU -- Date: 11 November 2015 Municipal Infrastructure Support Agent.
Objective Explain major factors to consider in planning new construction or repair work.
1 Welcome to the International Right of Way Association’s Course 506 Advanced Business Relocation Assistance 506.PM.R
Title Category #1 Category #2 Category #3Category #
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
PRE-BID MEETING CONSTRUCTION OF MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING INSURANCE PRESENTATION Presented by: Dennis Govender 13 November 2014.
Minimum Price $100. Minimum Price $45 Minimum Price $40.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Administration of a FIDIC Contract - Pre-Contract Phase -
Recent Trends in Contracting – Standard Forms & Current Market Demands In The Irish Construction Industry Karen Killoran, Partner Infrastructure, Construction.
Recruiting Services SYSTEMART, LLC We Optimize. You Capitalize
COST PLANNING AND ESTIMATION
CHANGING PROJECT DELIVERY SYSTEMS
Yahoo Mail Customer Support Number
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
Cell References and Sorting
Engineering Project Tendering.
Government of Bihar Road Construction Department
التسعير الفصل الرابع عشر.
THANK YOU!.
Supply Unit 2: Supply and Demand.
Contractual Arrangement
Recruiting Services SYSTEMART, LLC We Optimize. You Capitalize
Thank you.
Thank you.
Delran Township School District
Dennis Li - HKCIC Lecturer
Dennis Li - HKCIC Lecturer

Definitions EPC EPCM Design/Build Contract Lump Sum
A NEW APPROACH. A NEW APPROACH WHAT CAUSED THE MAINE DOT TO CONSIDER CBE? LACK OF COMPETITION VOLITILE MATERIAL COST LACK OF FUNDING CONTRACTOR TAKING.
Supply Unit 2: Supply and Demand.
Construction Contracts
Make the process work for you
Composition & Inverses Review
Types of Errors And Error Analysis.
Օրենսդրական բացերը ընդերքօգտագործման ոլորտում
5626 BESG Construction Contracts
Presentation transcript:

Standard Form of Contracts

What’s to be discussed ? What is it Advantages Various types

Standard form of contract What is it ? A standard form contract is a contract between two parties, where the terms and conditions of the contract are set by one of the parties, and the other party has little or no ability to negotiate. Contracts Standard form of contract

feedback

Advantages Time saving Flexible Minimizes errors Not biased

True or false

Thank you Examples International federation of consulting engineers NEC New engineering Contract International federation of consulting engineers The Joint Contracts Tribunal (JCT) Option A – Priced contract with activity schedule. Option B – Priced contract with bill of quantities. Option C – Target contract with activity schedule. Option D – Target contract with bill of quantities. Option E- Cost reimbursable contract Option F- management contract DB – design and build CD – contract design CE – constructing excellence IFC – intermediate form of building contract MC – management contracting Thank you