Smart Meter Texas: Usability & UX Analysis Process and Implementation

Slides:



Advertisements
Similar presentations
Business Development Suit Presented by Thomas Mathews.
Advertisements

Proposed AMIT SMT Methodology and Release Strategy March 9, 2010.
Delegated Admin Tool Edit Personal User Profile Training Module.
Web 2.0 Testing and Marketing E-engagement capacity enhancement for NGOs HKU ExCEL3.
AMIT Transition to RMS Update March 20, 2013 Christine Wright Infrastructure & Reliability Division Public Utility Commission of Texas.
NITAAC Customer Support Phone: Website: NITAAC.nih.gov Customer Guide for using the electronic Government.
SATERN for Supervisors May Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.  Log.
1 SMT On Demand Read March 12, 2012 Processes and Storyboards ‘Access, Control & Convenience’
State of Indiana Business One Stop Process Storyboards To support RFP and Requirements As of September 13, 2013 Prepared by: RFP Attachment L.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT 2015 Approved AMWG Change Requests.
OneView Benefits Sales collaboration across network A “one-stop” utility portal Ease of use, scalability & accessibility Useful reports and metrics Improved.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Smart Meter Texas: Usability & UX Analysis Process and Implementation.
Lead Management Tool Partner User Guide March 15, 2013
SMART METER TEXAS Status Update May 5, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics –
1 3 rd Party Ongoing Relationship Agreement Extension Request June 27th, 2012 Processes and Storyboards ‘Access, Control & Convenience’
SATERN for Supervisors Updated: January Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.
SMART METER TEXAS Smart Meter Texas Scope “Fall Release” May 4-5,
Heuristic evaluation Functionality: Visual Design: Efficiency:
SMT Joint TDSPs AMWG 17 Change Requests Update To RMS May 6, 2014 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright August 17, 2011
3rd Party Update To RMS November 20, 2013 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT JDOA)
WHEN TITLE IS NOT A QUESTION N O ‘WE CAN’ Deal Registration Entry and Submission August 2010.
3 rd Party Registration & Account Management JDOA Update To RMS October 28, 2014.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT 2015 Approved AMWG Change Requests.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT Post R 4.3 Potential Enhancements.
© 2012 IBM Corporation 3 rd Party Registration & Account Management 1 1 SMT Maintenance and Support Suggested Enhancements for Potential AMWG CRs.
VLSC December 2009 Release Release Date: December 7th, 2009.
Global Field Operations From Vision to Value Cisco Confidential1© 2011 Cisco and/or its affiliates. All rights reserved. Access to PMC Partner Training.
Update to RMS December 9,  Reviewed proposed revisions to AMWG Procedures and Change Request Form ◦ Will continue discussion at December meeting.
HIOS Portal Release Issuer Training.  Provide an Overview of HIOS Portal Release 20 Enhancements  Outline CMS Portal UI Changes  Provide an Overview.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
3 rd Party Registration & Account Management SMT Update To AMWG May 24, 2016.
3 rd Party Registration & Account Management SMT Update To AMWG March 22, 2016.
3 rd Party Registration & Account Management SMT Update To AMWG September 23, 2014.
Update to RMS August 4,  All CRs will have a sponsor, particularly 3 rd party and business related enhancements  Delayed multiple reporting-related.
Web Content And Customer Relationship Management Solution. Transforming web sites into a customer-focused, revenue generating channel with less stress.
myWizard Metrics User Guide For Base Deployed Projects
Request-to-Resolve Scenario Overview
Program Management Portal (PgMP): What’s New in R8 for the Client
TuNGSTEN E-INVOICE SUBMISSION GUIDE.
myWizard Metrics User Guide Agile Projects
Status Update of AMWG Change Requests As of February 15, 2016
Global Grid Forum GridForge
SMT Format Short Story ‘Access, Control & Convenience’ SMT Format Short Story April 24, 2012.
How to use the Salesforce Support Portal
Conducting the performance appraisal
Request-to-Resolve Scenario Overview
myWizard Metrics User Guide Full Integration project
Conducting the performance appraisal
Successful Website Accessibility Testing
Increased Efficiency and Effectiveness
Introduction to the New SSA OnePoint Online Website
Request-to-Resolve Scenario Overview
Enterprise Program Management Office
The Educator Development Solution
vTools Updates Chris Gunning
Unemployment Insurance Agency Michigan Web Account Manager
User Research Goals Memorability/Desirability Usability
Request-to-Resolve Scenario Overview
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Manage Sourcing - Supplier
Presentation transcript:

Smart Meter Texas: Usability & UX Analysis Process and Implementation

Introduction An effort was undertaken to improve the overall user experience (UX) of the Smart Meter Texas web portal Retained Shannon Graf, a consumer insights professional Conducted a heuristic evaluation of the overall SMT site usability against industry standards and best practices Proposed changes to be considered to improve the user experience. The TDSP’s reviewed and elected to include recommendations that could be included in the new third party solution without impacting the ability to release third party in 2014. Ms. Graf then conducted user validation testing on the new SMT UX design changes Validated that the changes improved the usability of the site Incorporated feedback from these session with additional changes to further improve the user experience

Heuristic Evaluation of SMT Site Usability (UX)

Summary of Research Methodology Results The evaluation involved Ms. Graf utilizing the existing Smart Meter Texas solution to perform all new and existing customer functionality. Ms. Graf also walked through the design documentation and navigation prototype tool to review the new Third Party functionality. Results The research resulted in development of industry best practice recommendations intended to improve the Smart Meter Texas solution usability and user experience (UX).

Key Takeaways: Quick Fixes & Proposed Solution Quick Fixes solve for… Addressing key issues that are a barrier to success in the existing portal Reducing cognitive load currently required during each step from registration to management Consolidating the steps needed to register, view, and manage agreements Proposed Solution solves for... A simplified process which aims to reduce overall cognitive load and increase efficiency for all user types Organization of processes in modal windows by critical tasks Visual representation of key data to help users identify at-a-glance: pending agreements, overall usage, updates / notifications, and entry points to action items, (i.e. 3rd party agreements)

Summary of Recommendations Topic Description Recommendation High level findings and recommendations Identified key ways in which the existing infrastructure can be simplified to enhance the overall organization, ease of use, and navigation. Addressing the overall infrastructure under which business processes operate is critical to meeting the business objectives; at minimum, Phase I recommendations should be considered. Visual and relevant content Content that is prioritized by relevancy to the user types (3rd Party, Residential, Business), on a visual dashboard once they have logged in, will assist in quick identification of key information. Implement interactive dashboard functionality that allows users to drill down into more information, (i.e. 3rd Parties can view pending agreements at a glance via a content management system or CMS module). Consolidate and Group Like Content As an example, Customer Meters, Agreements, HAN Device Messages, My Profile, Company Profile, Manage Users, and Pending Approvals are related to ‘My Account’, but are not strategically linked to a flow. Regroup these options based on critical tasks: Evaluate (profile, information and messages) Create / Initiate (agreements) Manage (modifications to user accounts) Contextual Help Data entry fields that are industry-specific (i.e. not the standard name, address, email, phone) often become points of confusion and disrupt a process for users, particularly if they are unclear as to whether or not they have completed a step or the process in its entirety. Instead of excessive links to additional pages of content, provide guidance inline, particularly alongside data entry fields. Additionally, provide confirmation at the completion of a key step, as to what users have just achieved, (e.g. ‘Registration Completed! Click on the to the Messages tab to access your confirmation.’).

New Smart Meter Texas UX Presentation of New SMT UX Navigation Tool

SMT New UX Design Validation Testing

Summary of Research Methodology Results The study involved 15 in-depth interviews (IDIs) across two days on May 6th and 8th, 2014 in Dallas and Houston, respectively. The interviews were conducted with both residential and business customers and prospects, including representative consumers of the Hispanic community. Results The research resulted in consistent strategic and tactical findings across all respondents, and validated that changes made as a result of the first round of design reviews are positive and well-received.

Validation Testing Participant Profiles Mix of male (7) and female (8) Mix of residential SMT customers (5) and residential SMT prospects (4) Mix of current SMT small business owners (2) and prospective SMT small business owners (4) Hispanic representatives: Residential SMT customers (2) Prospective SMT residential customers (2)

Key Takeaways Opportunities for Improvement Strengths The new designs were deemed less overwhelming due to key options being presented as needed, not “all at once” The registration process for new customers was described as “simple” and “painless” The new ‘Usage’ default landing page for authenticated users was well-received, as it was described as “exactly why we are here” The revised order in which the authenticated navigation options are presented matched users’ mental model Opportunities for Improvement Both customers and prospects expected to see images of meters / in- home devices and / or scenarios explaining how tracking usage can save money The concept of connecting with, and viewing, friends’ usage was lost on users While they appreciated ‘About Us’, they still want to know “who is behind this” upfront on the Homepage Both customers and prospects, (whether SBOs or residential) mentioned wanting the option to contact SMT through an online channel – whether web form or live chat – if they had questions

Additional Changes to Solution Implemented

Summary of Changes Made Based On Validation Testing Added information to the ‘What is Smart Meter Texas’ FAQ Unauthenticated Residential Landing and Business Landing - Added scenarios describing how tracking usage leads to savings in energy and ultimately cost Global Navigation About Us – Added links to the TDSP web sites Registration Steps within SMT – Added description of a Third Party Authenticated Agreements – Added content to clarify description of 3rd parties agreements and Friends agreements Changed ‘Share Testimonial’ to ‘Share Feedback’ ‘Friends and Family’ not changed due to complexity

User Experience Implementation The UX heuristic evaluation was an in depth study with a wealth and volume of results documented by Ms. Graf. The report from Ms. Graf is not included in this presentation but will be published for access by the Market As stated previously a selected portion of the study recommendations were implemented that could be included in the new third party solution without impacting the ability to release third party in 2014. Additional UX heuristic recommendations can be included in future releases through the AMWG change request process if so desired by the Market.