EHC Joint Working Group – Status Report

Slides:



Advertisements
Similar presentations
IEEE DASC Co-Sponsorship of UPF Working Group Proposal prepared by: Stephen Bailey Chair, Accellera UPF Technical Subcommittee.
Advertisements

ANNUAL REPORT TO THE COLLEGE SENATE SUNY ONEONTA MAY 7, 2012 Strategic Planning Council.
University Assembly REVIEW AND REFERRAL OF ISSUES Session.
California Health Benefit Exchange Level 1.2 Establishment Grant -- Draft Narrative and Work Plan David Maxwell-Jolly Chief Operating Officer California.
8 th Address Policy SIG Report Takashi Arano Yong Wan Ju Kenny Huang Chair/co-Chairs of APNIC Address Policy SIG.
Department of Medicine Faculty Development
Power of Choice (PoC) Program Overview
Bow Basin Watershed Management Plan Revised Terms of Reference
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
CEOS Response to GEOSS Water Strategy
Implementation Review Team Meeting
Kenya’s INDC: Sector Meetings
IT Strategy Roadmap Template
Oct 22 Group Leaders Planning meeting
DSC Assurance Team Reporting
Office of Port and Facility Compliance (CG-FAC)
IANA Functions Contract Expires
National Maritime Security Advisory Committee
PROGRAM CONSULTATIVE FORUM Meeting pack
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
Background on the 2016 Study Program Process
Twelfth Policy Board meeting Lima, Peru 8-9 July 2014
National Maritime Security Advisory Committee
Hydrographic Services and Standards Committee
A Strategic, Financially Effective Research Program, Part 2
How to Successfully Implement an Agile Project
Appendix C New Administration General Assembly Session
Project timeline # 3 Step # 3 is about x, y and z # 2
Broward County Consolidated Communication Committee Update
<Location> – <Project Name>, Sponsor: <name>
The UN Ad Hoc Committee The process to draft a new human rights treaty for people with disabilities.
Status report / Activity Plan of OBD Task Force
SG4a Project Timeline January 2003 doc.: IEEE /056r0
ctclink Steering Committee

This Presentation Pack is brought to you by
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
United Way of Benton & Lincoln Counties
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
GOMACTech-04 Technical Program Committee Timeline
Transit Integration and Efficiency Study Transit Advisory Committee
Vermont Health Information Technology Plan (VHITP) Workgroup Meeting
IC IEEE 802 Network Enhancements for the Next Decade Type: Individual Report Date: 14 February 2019 Chair: Roger Marks (Huawei) Participants: Individuals,
Key Value Indicators (KVIs) Version 1.1 (amendments from V1.0 in red)

SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
<month year> doc.: IEEE < e> January 2012
Back-End Payor Sub-Group
IEEE IMT-Advanced Review Process
Transmission Planning Code Review
17 April 2018 Progress report ccc General capacity requirements for SAIs for conducting IT audits.
IC IEEE 802 Network Enhancements for the Next Decade (DRAFT) Type: Individual Report Date: 14 February 2019 Chair: Roger Marks (Huawei) Participants:
Lessons Learned Process – A Strawman
IEEE IMT-Advanced Review Process
Water Framework Directive 2000/60/EC
Roger Marks (Huawei) capable 13 March 2019
Ctclink executive leadership committee May 31, 2018
XRN Feb 19 Minor Release - Status Update

Preliminary Project Execution Plan
Presentation to workshop
Project timeline # 3 Step # 3 is about x, y and z # 2
<month year> doc.: IEEE < e> January 2012
Proposed Approach to Strengthening Information on Development Effectiveness of Multilateral Organizations Presented by: Goberdhan Singh for the Task Team.

Pilot of revised survey
Summary of the IEEE 802 Coexistence Process Discussion
Presentation transcript:

EHC Joint Working Group – Status Report Captain Marcus Woodring, NMSAC EHC WG Chair October 18, 2016

Background Review of EHC security mandated by USCG Authorization Act of 2010 Issue has been worked since 2008, including Cargo Security Summit in 2009 and Commodity Flow Study in 2010 Chemical Transportation Advisory Committee (CTAC) and National Maritime Security Advisory Committee (NMSAC) given Task Orders by USCG to form a “Joint Working Group” Deliverables: Short Term: NLT 6 months after completion of Commodity Flow Study Medium Term: August 30, 2019 Long Term: February 28, 2021

Timeline Sep15 – NMSAC Meeting – EHC tasker presented Mar16 – CTAC Meeting – EHC tasker presented, working group established with John Temperilli as Chair May16 – NMSAC Teleconference – EHC Task Order in draft form and forthcoming soon Jul16 – NMSAC Telemeeting – EHC Task Order presented, working group established with Captain Woodring as Chair Aug16 – Joint CTAC/NMSAC EHC WG Meeting – Task Orders reviewed and modified Sep16 – CTAC Meeting – CTAC signed Task Order Oct16 – NMSAC Meeting – NMSAC signed Task Order (?)

Key Components Short Term: Medium Term: Long Term: Commodity Flow Study Review five EHCs, add or subtract? Medium Term: Identify risk management principles in industry Review current rules, i.e. ANOA, transfer, movements Assist in recommending strategies for resource allocation Assist in establishing a COP and discipline that is coordinated Long Term: Assist in implementing 4 goals of “Strategy for the Waterside Security of Especially Hazardous Cargo” Assist in determining best method for tracking EHCs Assist in developing a “common risk framework” for security decision making

Summary First Joint WG meeting held in Houston Task Order reviewed and clarified with USCG at Joint WG meeting Task Order revisions done by USCG and signed by CTAC Request Task Order be signed by NMSAC today Schedule next Joint WG meeting with primary focus on Commodity Flow Study and considering additions or subtractions to the five EHCs currently listed in National Strategy