Management of Placement Area at Bayport Container Terminal (RFQ-147)

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

1 Solicitations/Advertisements Solicitations/Advertisements
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session 05 August 2013 The Road Accident Fund.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
The Importance of the Qualifications Based Selection (QBS) Process
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Purchasing Overview. Fundamentals of Purchasing Procedures.
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Water Supply Planning Initiative State Water Commission November 22, 2004.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Request for Qualifications: Design Consulting Services for Consolidated Rental Car Facility (“CONRAC”)- Airport Transit Center Presented by: Aviation Department.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
PLANNING, DESIGN & CONSTRUCTION RECITAL HALL PROJECT # DESIGN PROFESSIONAL SELECTION PRE-SUBMITTAL MEETING January 12, 2016.
Construction Management At Risk Process
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Designer selection procedures. Legal framework Article 3D. Procurement of Architectural, Engineering, Surveying Services, and Construction Manager at.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
State of Utah Small Package Delivery Services States Kickoff Webinar
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Pre-Bid/Proposal Meeting
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
CM at Risk v. Design-Bid-Build
Pre-Proposal Conference
Amendment to Anderson Penna Partners Contract for Contract Code Compliance Services City Council March 20, 2017.
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Developing and Issuing the RFP
CSP – Remodel Gate Services Building for USDA at Bayport Terminal
Drainage Improvements at VW Yard (RFQ-101)
PRE-PROPOSAL MEETING, January 25, 2018 Contract No.:
City of Phoenix Request for Qualifications and Scoring Process Update
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics
Architectural Services RFQ
PROJECT DELIVERY METHODS
CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project.
Registry Data Session Introductions States represented in the room.
OCPS CCNA SELECTION COMMITTEE TRAINING
Multi-discipline academic research science technology engineering & math (stem) building project phase 1 NAU Project No RFQ for Construction.
RFP-311 JDE Managed CNC Services
RFP – 1148 Disparity Study Services
Pre-Submittal Meeting As Needed Environmental Services RFQ
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO CONDUCT A MARKET DEMAND STUDY AND BUSINESS CASE ANALYSIS FOR REDUCTION OF EMISSIONS THROUGH INTERMODAL.
PURCHASE OF MISCELLAEOUS PERSONAL SAFETY EQUIPMENT FOR BARBROURS CUT TERMINAL, BAYPORT CONTAINER TERMINAL, AND TURNING BASIN TERMINAL.
Horticulture Services at Menlyn Office RAF/2013/00023 Compulsory Briefing Session The Road Accident Fund 05 August 2013.
Design and Engineering Services
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Management of Placement Area at Bayport Container Terminal (RFQ-147) Brenda Trevino, P.E. Project Manager October 10, 2016

Management of Placement Area at Bayport Container Terminal Agenda Introductions Procurement Services Selection Process Submittal Requirements Selection Criteria Tentative Procurement Schedule Scope of Services Questions

Management of Placement Area at Bayport Container Terminal PHA Personnel: Jeff Davis – Chief of Operations Roger H. Hoh, P.E. – Director, Project & Construction Management Brenda Trevino, P.E. – Project Manager Yvette Camel-Smith – Director of Procurement Services Pedro Gonzalez – Small Business

Management of Placement Area at Bayport Container Terminal Format and Delivery Requirements RFQ Due Date: October 19, 2016 Before 11:00 A.M. Late Submittals Will Not Be Evaluated Eight (8) Hard Copies & 1 Electronic Copy

SELECTION PROCESS 1st 2nd 3rd Internal preliminary rank and evaluate meeting, short listing firms/teams 2nd Short listed firms/teams may personally present their qualifications to PHA 3rd PHA will select most highly qualified firm/team from short list based on demonstration competence and qualifications (Commission Award)

SUBMITTAL REQUIREMENTS Format & Delivery Example: Completeness of requested information; organization and ease of identifying content Corporate Expectation of Respondent Example: Proof of licensing and registration; required ownership information; list of similar projects completed by firm within the last 5 years Experience of Staff Example: Qualified individuals with backgrounds in similar projects; identification of current workload; Texas PE Project Manager A B C

SUBMITTAL REQUIREMENTS(Cont’d) Project Team Organization Example: Project organization chart; firm/team functions and responsibilities Performance Plan Example: Details of the methods of accomplish project requirements Other Benefits Example: Unique or special processes; special staff qualifications or capabilities; special technical utilization D E F

SELECTION CRITERIA RELATIVE WEIGHT 25% 40% 20% 15% 100% CRITERIA RESPONDENT’S REPUTATIONS AND QUALITY OF SERVICES PERSONNEL QUALIFICATIONS AND EXPERIENCE PERFORMANCE PLAN AND OTHER BENEFITS OVERALL COMPLIANCE WITH PORT AUTHORITY POLICIES TOTAL RELATIVE WEIGHT 25% 40% 20% 15% 100%

TENTATIVE PROCUREMENT SCHEDULE (SUBJECT TO CHANGE) October 19, 2016 RFQ Due Date October 20, 2016 to November 17, 2016 PHA Evaluation Period December 13, 2016 or January 24, 2017 Port Commission Meeting to Award Contract

Management of Placement Area at Bayport Container Terminal Background: There is a need to manage existing and future fill material to prepare for construction of the Intermodal Yard and potential business opportunities south of Port Road on Port Authority properties. Scope of Services: Utilize existing H&H, Drainage, Geotechnical, Fill Plan and Master Plan reports and Special Studies. Perform a geotechnical investigation to determine the most effective use and conditioning of the existing soil for the development of the property Perform a brief alternatives analysis for use of the information provided Provide a material management plan with phasing Coordinate with the appropriate agencies, where required, to approve the plan and provide a road map for any permitting required Provide preliminary design documents (30% level), if authorized separately Prepare construction documents of selected option(s), if authorized separately Provide construction phase services, if authorized separately

Management of Placement Area at Bayport Container Terminal

Management of Placement Area at Bayport Container Terminal

Management of Placement Area at Bayport Container Terminal

Thank You & Questions