Report to T-10 Task Force T-10 EGR Hardware Update 24 April 2001

Slides:



Advertisements
Similar presentations
Dual Fuel Engine Conversion
Advertisements

Byron High School Auto Diagnostics V8 Engine Disassembly Mr. Hintz.
Engine Operation Chapter 3
Chapter 3 Engine Operation
2009 / 03 NOTE Year / Month T1003/T903 FIG 101 ALTERNATOR GP-CHARGING 4 P1.
June 2012 H50TIC – New Engine Generation. Tier 4/Stage IIIb with DOC only June 2012H50TIC – New Engine Generation
Automotive Engines Part 2 (Block ).
Welcome to Malaga WeBex Common Rail Fuel System
Diesel Engine Components
ECM Sensors. Air Temperature Sensor Air Flow Meter.
Mechanical Arrangement
piston/connecting rod assembly
Diesel Engine 4 Stroke Cycle model
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
1 Mastery Flight Training. Inc. TurboTalk: Turbocharger Failures Thomas P. Turner M.S. Aviation Safety, Master CFI 2008 FAA Central Region CFI of the Year.
TIMING THE CAM TO THE CRANK u Timing marks facing each other u Timing marks a specified number of links apart u Timing marks aligned with colored links.
@ Perkins Proprietary Information of Perkins Engines Company Ltd., © 2000.
Marine Engine Systems Merchant Marine Training Centre.
Fluid Coupling Torque Multiplication
ELECTRONIC FUEL INJECTION COMPONENTS
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.
Engine Construction Stationary Parts 2 s/c Slow Speed BEDPLATE LUBE OIL SUMP A FRAME CYLINDER BLOCK JACKET WATER CYLINDER LINER CYLINDER HEAD INTAKE PORTS.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only.
Engine theory Red = on unit test.
TEI has received 21 skids of liners from Federal Mogul. Our original order was for 19 skids. The additional 2 skids were part overrun pieces and TEI decided.
CPD Report Mack Surveillance Panel May 2, 2012 Mack T-11 / T-12 / T-8 Test Kit Hardware Inventory Update Inventory of Mack Engine Miscellaneous Parts Connecting.
Materials Management Summer Training Report by: Anand Swarup Laskar B.Tech - sophomore, IIT Roorkee.
Diesel Engine Power Plant Prepared By: Nimesh Gajjar
Mack T12 Engine Test Update
PISTON ENGINE PROPULSION Chapter 1 Mechanical Arrangement 1933 Alvis Engine 2014 Hyundai Engine.
CPD Report Mack Surveillance Panel June CPD Report Mack Surveillance Panel June 2004.
CPD Report Mack Surveillance Panel September, 2005.
ISM Test Development Task Force Report June 21, 2004.
LESSON 16 ENGINE OPERATION
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI February 21, 2005.
JACTest Monitoring Center T-10 PB Ad Hoc Task Force Report to the Mack Test Surveillance Panel September 10, 2004 Richmond, VA.
Engine Terminology The 5 Piece Bottom End Lesson 4 March 2008.
2008 / 05 NOTE Year / Month T553/T503/T433 P1 FIG 101 CYLINDER BLOCK GROUP 4.
Mack T12 Piston Distress October 11, CMIR piston 4 CMIR piston 5 TRWL = 101mg TRWL = 31 mg.
Manifold Block “A” Click on the slide to continue.
Gasoline Direct Injection
Date of download: 9/18/2016 Copyright © ASME. All rights reserved. From: A Survey of Analysis, Modeling, and Diagnostics of Diesel Fuel Injection Systems.
Diesel Engine Components
Mack Surveillance Panel
Overview Hose Assembly PRECISION MACHINING Fitting Manufacturing
Chicago Pneumatic Compressors Company Presentation
FUEL SYSTEMS AND ITS COMPONENTS
CYLINDER BLOCK GROUP FIG 101
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
BDB RCS Injection Pump.
Ram-air, Superchargers, Turbochargers and Nitrous Oxide
Volvo/Mack CPD Report T8/T11/T12/T13
Figure 36.1 A gasoline direct-injection (GDI) system injects fuel under high pressure directly into the combustion chamber.
Engine Lubrication Systems
Statistical Summary of the Mack T10 Precision/BOI Matrix
Figure 24.1 A gasoline direct-injection (GDI) system injects fuel under high pressure directly into the combustion chamber.
How Can We Make Fleets More Reliable
1.6 Allowable Stress Allowable Load < Failure Load
SB Packing Automatic Downpuller Power Unit
Diesel Engine 4 Stroke Cycle model
Engine Systems Parts Review.
OBD II Emission Monitoring
מבנה המנוע שיעור מספר 5.
Monthly Production from NCS 2018 compared with prognosis and 2017
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Modified at -
Presentation Title Presenter(s) name(s) and job title(s), if needed
Data Lost Prevention (DLP) © Copyright 2009 Technica All rights reserved. No part of this presentation in all its property may be used or reproduced in.
Presentation transcript:

Report to T-10 Task Force T-10 EGR Hardware Update 24 April 2001 Cylinder Kits 85 tests worth in inventory of current batch Next batch to be delivered in May (~200 tests) Future kits to be segregated by test type if approved Connecting Rod Bearings Matrix can be completed using Batch D Batch E and all future batches to be segregated and serialized by test type if approved

T-10 EGR Hardware Update (Cont.) Main Bearings Report to T-10 Task Force 24 April 2001 T-10 EGR Hardware Update (Cont.) Main Bearings 29 tests of current batch in inventory Next batch will be new style bearings (higher oil pressure) Future batches to be segregated by test type if approved

T-10 EGR Hardware Update (Cont.) EGR Coolers Report to T-10 Task Force 24 April 2001 T-10 EGR Hardware Update (Cont.) EGR Coolers New coolers modified w/4 bolt flanges Used coolers can be modified if desired EGR Turbos Both styles in inventory

T-10 EGR Hardware Update (Cont.) EGR Oil Pumps ECM’s Injectors Report to T-10 Task Force 24 April 2001 T-10 EGR Hardware Update (Cont.) EGR Oil Pumps Survey indicates ~ 20 needed as spares ECM’s One each available for diagnostics only Injectors Working on stocking spare injectors

T-10 EGR Hardware Update (Cont.) Report to T-10 Task Force 24 April 2001 T-10 EGR Hardware Update (Cont.) Other EGR Hardware Blocks/Engines Spare blocks needed? Injection Pumps Spare pumps needed?