Data Acquisition (DAQ) Status

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
A N DY Trigger and DAQ System A N DY Review Chris Perkins UC Berkeley/Space Sciences Laboratory Stony Brook University 11/08/2011.
July 16/17, 2002 MUEGAMMA review PSI1 Slow Control.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
TRIUMF Qweak Electronics Des Ramsay Nov Status of Electronics November, 2008  36 VME modules (# 001 and # ) delivered to JLab  001, 003,
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Mircea Bogdan, NSS2005 Oct , 2005 – Windham El Conquistador Resort, Puerto Rico1 Simultaneous Sampling ADC Data Acquisition System for the QUIET.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
False asymmetries/Ground Loops David Bowman 4/27/12.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
ECE 101 Exploring Electrical Engineering Chapter 7 Data Acquisition Herbert G. Mayer, PSU Status 11/30/2015 Derived with permission from PSU Prof. Phillip.
R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.
LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
SKIROC status Calice meeting – Kobe – 10/05/2007.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
Overview of E906 Electronics, Readouts, and DAQ System E906 DAQ workshop Ting-Hua Chang (7/6 – 7/7/2009)
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Digital Acquisition: State of the Art and future prospects
Rainer Stamen, Norman Gee
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
PRAD DAQ System Overview
Counting Mode DAQ for Compton
Readout electronics for aMini-matrix DEPFET detectors
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
ETD meeting Electronic design for the barrel : Front end chip and TDC
PADME L0 Trigger Processor
Hall A Compton Electron detector overview
EMC Electronics and Trigger Review and Trigger Plan
A First Look J. Pilcher 12-Mar-2004
Front-end electronic system for large area photomultipliers readout
LHCb calorimeter main features
BESIII EMC electronics
Hall D Trigger and Data Rates
SKIROC status Calice meeting – Kobe – 10/05/2007.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
PREX / CREX Collaboration Meeting and Status
The CMS Tracking Readout and Front End Driver Testing
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
PID meeting Mechanical implementation Electronics architecture
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
DAQ and visualization software
Presentation transcript:

Data Acquisition (DAQ) Status Layout of DAQ Inventory and Present Status Comparison of Qweak and HAPPEX ADCs Possible Upgrades To – Do List PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

Parity DAQ Left Spectrometer Right Spectrometer 1 Qweak (*) 2 HAPPEX RS485 Trigger Supervisor RS485 2 Qweak 2 HAPPEX Spare ADCs Counting House 2 Qweak (*) 10 HAPPEX Each crate has 6100 cpu, TI board (“old” style), HAPPEX timer board, 3801 scaler 5 Qweak 4 HAPPEX (*) - Don’t have in hand yet, but Dustin has 2 network network Injector 11 Qweak no HAPPEX scalers Event Builder Tape (MSS) PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

From Qweak: TRIUMF VME integrator Ext NIM Gate Status LEDs VME Access Ext Clock Enb Ext Gate Enb 8 inputs Ext NIM Clock Analog Filters VME Module Select Switches ADC FPGA must be programmed to produce the sums and check numbers. FPGA Prog/ Debug Ports DC-DC Converter FPGA

From Qweak: TRIUMF VME integrator Ext NIM Gate Status LEDs VME Access Ext Clock Enb Ext Gate Enb 8 inputs Ext NIM Clock Analog Filters VME Module Select Switches Good module with excellent specs Input +/- 10 volt 500 ksps sampling, 18-bit ADCs, output: 32-bit sum Superior bit resolution, more convenient dynamic range in comparison to HAPPEX ADCs. DAC noise not needed (given resolution and Shot noise) Engineering support ?? -- unclear, at present. ADC FPGA must be programmed to produce the sums and check numbers. FPGA Prog/ Debug Ports DC-DC Converter FPGA

Put your detector PMT into this, output goes to ADC Note, we’ve reconfigured the HAPPEX ADCs to also require these preamps. PMT ADC PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

HAPPEX ADCs Integrate signals over the helicity period, same aim as Qweak ADCs but different design. Used by HAPPEX-III and PREX-I PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

HAPPEX ADCs Recent work: resistors adjusted so that ADC works for 0 – 5 V for 30 Hz < f < 240 Hz Will be made available for any of our detector or beamline signals. DAC noise pickup issue (10 ppm noise which mostly cancels ) Only “V” mode now, the “I” mode needs the preamps (same as Qweak ADC) PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

Recent work on HAPPEX ADC : resistors adjusted Recent work on HAPPEX ADC : resistors adjusted so that ADC works for 0 – 5 V for 30 Hz < f < 240 Hz Example of calibration plot PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

DAQ Inventory and Needs Item Deployed in our DAQ now Spares on Hand Needed Qweak ADCs 18 (*) 3 HAPPEX ADCs 8 10 Model 6100 cpu 4 2 Model 5100 cpu in TS 1 Crates including TS 5 Trigger Interrupt (TI) Trigger Supervisor HAPPEX Timer 6 Flexio board Model 3801 Scalers Model 7200 Scaler 1 (injector) Intel / Linux VME cpu 5 + 1 spare (**) (*) I hear there are “a few” more Qweak ADCs in a cabinet at Jlab. Also, 2 at Idaho State (**) If using CODA 3 PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

CODA 2.5 CODA 2.6.2 We should consider CODA 3 It’s what the DAQ group supports, many improvements Fits better with new computers But costs money (new cpus) CODA 3 PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

DAQ Test Stand Located in the TEDF building (Technology Engineering and Development Facility) 2 DAQ crates, computers, NIM electronics, test bench (adjacent cubicle unused). Bryan Moffit volunteers to help with CODA3 porting. It could use a student. PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

To – Do List for DAQ (and related) Job Status Revive all crates Mostly accomplished Feedback Underway, needed by Injector Studies Run-dependent database generation Software exists, need to revive Coil pulsing ditto Panguin Prompt analysis Synchronization check Dismantled, need to revive E-logbook entries Needs work since new E-logbook DAQ for GEMs ? The rest of the HRS DAQ is ready. Upgrade to CODA 3 ??? An idea. We can start on test crate PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

The End Backup slides on DAC noise pickup follows. PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

HAPPEX ADCs DAC noise is added to “base” and “peak”, then subtracted. This reduces differential nonlinearities. However, the DAC noise is also picked up and produces noise in the ADC value (peak minus base). ADC value Time  At the right, we’ve reduced DAC noise to 800 channels with reduced stepsize of 4. Residual noise is 4 channels RMS. ADC value Time  PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab

Current status of DAC noise pickup: it causes a ~10 ppm noise floor (not helicity correlated). PREX/CREX Collab. Mtg, Oct 1-2, 2017 Bob Michaels, JLab