Background and Process

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

1 Harmonization of Cross Border Transmission Tariffs between Portugal and Spain (CNE/ERSE) Public hearing 15 th SG Meeting S-GRI Madrid, 7 th February.
Convergence in the structure of access tariffs – Harmonisation between cross border and domestic access tariffs in Spain and Portugal (MIBGAS) Terms of.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Nina Grall DG TREN – Directorat C GRI SSE-EFET WS, 21/01/2008, Prague Concepts for the EU Gas Market Requirements and framework EUROPEAN COMMISSION.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Walter Boltz, ERGEG Vice President 18 th Madrid Forum 28 th September 2010 Capacity allocation in natural gas transmission networks Pilot framework guideline.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
NRA’s vision on GRI NW work plan 2011 Stakeholder Group meeting Brussels, 26 November 2010 Peter Plug Chairman of GRI NW.
Gas Regional Initiative South South-East
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Storage users in entry/exit regimes suffer from double charges for transmission
10 year investment plan ERGEG approach and contribution
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Harmonization of Cross Border Transmission Tariffs between
Review Group 291- Ofgem Update
Gas Transmission Europe
ERGEG GRI South South East – , Maribor
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Update on European Network Codes
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
CESEC Energy Community Project Monitoring
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Gas balancing – where next
Gas Quality & TSO – LSO Coordination
37th IG Meeting South Gas Regional Initiative
Walter Boltz Chairman, CEER Gas Working Group
DRAFT DG TREN Staff Working Paper on LNG
Gas Regional Initiative South South-East
Incentives for electricity infrastructure – ERGEG view
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
XIIIth Madrid Forum (16th/17th October 2007)
Review Group 291- Ofgem Update
LNG Workshop Bilbao, March 13th 2009 GLE.
ERGEG comment to KEMA study on Art. 3 and 7
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Gas Regional Initiative South South-East
Presentation transcript:

Background and Process Legal requirements on transmission tariffs De-coupled entry-exit systems No distinction between domestic transport and transit Qualitative requirements (Commission Staff Working Document) KEMA Study 2009 Evaluation of existing differences in the methodologies for gas transmission network tariffs in Europe - Identification of barriers to cross-border trade 17th Madrid Forum invited ERGEG to start preparatory work on the framework guideline on tariffs Preparatory work and analysis of national charging systems by ERGEG since November 2010 5 bilateral meetings with ENTSOG Scoping discussion with the EC 19th Madrid Forum: EC announced that work could be pursued in the context of Commission Guidelines

Main legal requirements Article 41, Gas Directive (2009/73/EC) The NRA shall ensure that TSOs are granted appropriate incentive, over both the short and long term, to increase efficiencies, foster market integration and security of supply and support the related research activities. Article 13, Gas Regulation (EC) 715/2009: Transmission tariffs or methodologies Shall facilitate efficient gas trade and competition, while at the same time avoiding cross-subsidies between network users and providing incentives for investment Reflect the actual costs incurred Tariffs may also be determined through market-based arrangements, such as auctions, provided that such arrangements and the revenues arising from them are approved by the NRA.

Identification of problems Tariffs can act as barriers to efficient gas trade and competition Premium on short-term capacity products allocated with a short lead time may frustrate arbitrage flows and price convergence Need to assess the relation between prices for short term and long term capacity products and the risks associated to optimization strategies by shippers Pricing of interruptible and non-physical backhaul capacity Need to find a proper balance between facilitating short term gas trading and providing long term signals for covering costs and promoting efficient investments Cross subsidies between cross-border and domestic network usage Cross subsidies within a market and Cross subsidies between two adjacent markets  Cost-reflectivity as a background principle

Identification of objectives Objective 1: Harmonized transmission tariff structures shall facilitate efficient gas trade and competition Objective 2: Harmonized transmission tariff structures shall avoid undue discrimination between cross-border and domestic network usage Objective 3: Harmonized transmission tariff structures shall guarantee recovery of allowed revenues associated to cross-border interconnection points Objective 4: Harmonized transmission tariff structures shall provide incentives for new and efficient investments  relation with the Energy Infrastructure Package  Work on the Gas Target Model, FG CAM and Balancing to be taken into account in the Tariff FG development process.

Cross-border interconnection points Proposed scope Cross-border interconnection points IPs between two or more Member States as well as IPs between adjacent entry-exit-systems within the same Member State IPs to LNG and storage facilities may be included, if relevant for market integration and the contribution to non-discrimination, effective competition and the efficient functioning of the market Contribute to recovering the allowed revenues (associated to interconnection points) However, detailed rules for the determination of costs (or allowed revenues) are not within the scope

Discussions on the Initial Impact Assessment Define a cost allocation methodology Avoid undue discrimination between cross-border and domestic network usage Mitigate the risk of pancaking Recovery of allowed revenues Deal with over-recovery and under-recovery of allowed revenues Setting of reserve prices For short term products  effects on TSOs ability to recover allowed revenues For interruptible and backhaul capacity Split of auction revenues between TSOs for bundled capacity products

Thank You!