Hélène ROZELOT, Y. M. Abiven, S. Blanchandin, J. Chabard, C

Slides:



Advertisements
Similar presentations
Technology Department EDMS nb.?????? Maintenance methods and policy in FPS section Maintenance Management, Spare Parts Management. Overview of activity.
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Group 7 - Chapter 3 Steven Shroyer - Introduction, ad hoc, level 2 Xiao Jingshan - Levels 3 and 4 Dusting Marker - Level 5 and example companies Definintions.
ACG 6415 SPRING 2012 KRISTIN DONOVAN & BETH WILDMAN IT Security Frameworks.
ITIL: Service Transition
Capability Maturity Model (CMM) in SW design
OHT 14.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Software quality infrastructure components The need for procedures and.
CHAPTER 9 DEVELOPING BUSINESS/IT STRATEGIES. IT Planning Planning an information system doesn’t start with bits, and bytes, or a Web site. It starts with.
Managing the Information Technology Resource Course Introduction.
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Capability Maturity Model
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
How To Apply Quality Management
Evolving IT Framework Standards (Compliance and IT)
N By: Md Rezaul Huda Reza n
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
SECTOR POLICY SUPPORT PROGRAMMES A new methodology for delivery of EC development assistance. 1.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Program Management The Financial Sector Presented by Bob Walker 3 shaping the future of program management
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Community of Expertise: ICT Competency Standards for Teachers Abdul Waheed Khan :: UNESCO :: Paris ::: GAID : : Strategic Council Meeting :: Santa Clara.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
Application of a CAMMS to CERN’s cryogenic installation park G. Perinić and S. Knoops, CERN.
Software Production ( ) Lecture 3: Dr. Samer Odeh Hanna (PhD) office: 318.
Proven systems for managing asset integrity & reliability by implementing effective Ex maintenance and inspection strategies Streamlining the ATEX inspection.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
“New and Improved”: The JLab (state-of-the-art) HCO System Dr. Ken Baggett Engineering Support Liaison to Operations At least until the next guy talks…
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
A Collaborative work platform, based on an IT tool. All the data and all the work in a single, specialized and friendly application Jorge Tavares Managing.
ITIL: Service Transition
Essential Needs of Software Test Automation
How To Apply Quality Management
Machine operation and daily maintenance management in SOLEIL
Maintenance Scheduling
Performance monitoring framework for the technical infrastructure
Europe’s Environment Assessment of Assessments EE-AoA 2011
Chapter 18 Maintaining Information Systems
UNIT –V SUPPLY CHAIN MANAGEMENT
RCM Turbo SQL Version.
IEEE Std 1074: Standard for Software Lifecycle
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
the CERN Electrical network protection system
Software Requirements
EIN 6133 Enterprise Engineering
The Enterprise Relevant Scope of DM
Project Management 6e..
EMIS. EDUCATION MANAGEMENT INFORMATION SYSTEM (EMIS)
Product Development Scenario Overview
Christophe Duhamel Global Office Coordinator, FAO Statistics Division
Software Engineering Lecture 16.
Capability Maturity Model
Identification of critical Beamline components for preventive maintenance plans at synchrotron SOLEIL CHABARD Jules, ROBERT Emmanuel, NICOLAS Christophe,
Challenges in Promoting Data and Data Dissemination Policies
SOLEIL: Status of Maintenance Policy
Chapter # 8 Quality Management Standards
Towards SOLEIL unique portal
Research Issues & Projects Sadiq M. Sait
Capability Maturity Model
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
Project Management 6e..
Project Management 6e..
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
International Standards and Contemporary Technologies,
Presentation transcript:

SOLEIL : from a Maintenance Management System Towards a Maintenance Policy Hélène ROZELOT, Y.M. Abiven, S. Blanchandin, J. Chabard, C. Herbeaux, P. Prigent At SOLEIL it is necessary to ensure optimal operating condition because the equipment is becoming older and older. In the maintenance management system, two main difficulties have been pointed out: the weakness of preventive maintenance and the lack of a general maintenance policy which results in a fragmented view of the failures. Therefore the top management has recently decided to undertake concrete actions that could be shared in the whole Synchrotron Facility in order to improve the maintenance management. ORGANISATION At SOLEIL there is not a unique maintenance service. Each group, in charge of its own equipment, is responsible for the management of its own assets. Each group has its own working methods : corrective maintenance, or preventive maintenance (process sheets for regulatory control), even Failure Mode Effects Analysis (Building & Infrastructures Group). Each group imputes its interventions into one of the several software tools available: CMMS, Bug tracker (JIRA), Electronical Logbook… This information is then reported and analysed by a "coordination level" (Executive Coordinators & Operation Group for the Accelerator Department; Coordination Group for the Scientific Department) which has the overall view of the operation and failures and therefore of the maintenance activities to be carried out. This coordination level extracts operating indicators and verifies that all lights are green. Then the coordinators define priorities (taking into account the Beam Schedule with shutdowns) in accordance with the strategic lines defined by Top Management. All these actions of data analyses and coordination give rise to many meetings. Maintenance System Organisation Operation Objectives: 5000h scheduled for users with an availibility of photons >99% MAINTENANCE INFORMATION SYSTEM Functional class Geographical class Controls Configuration Service Data sheet Drawing number Link towards the drawing database To be implemented Link towards the procurement database  To be implemented Designation Magnetic measurement DB Magnet &Insertion Maintenance System This section gives examples of the various data provided by the software tools to ensure the maintenance of end to end service (from accelerators to beamlines). In order to facilitate the overall view of the operation, we make the effort to correlate the information between each database / software : CMMS, Configuration DB (TANGO control system), Documentation Database (MERIDIAN), Electronical Logbook. These interfaces are carried out in all the fields of activities. Chemistry Maintenance System Beamlines: Number of interventions per activity field ECA Stock and Spare Management System IMPROVEMENTS In order to improve the management system and to increase performance, a solution would be to define a global maintenance policy for the whole facility. We are at the beginning of the process. This policy would mainly consist in defining strategic priorities (preventive maintenance, subcontracting strategy, etc.) and defining common methods and common tools shared by all. Among them: the single online portal (for the service management) and the criticality matrix which allows us to identify critical equipment and actions to be carried on. This maintenance policy is supported by the new SOLEIL organisation with clusters (in scientific department) and Quality Unit. New Maintenance System Approach PLEIADES: Critical Matrix The implementation of a maintenance policy will allow us to improve the specification of processes, organisation and methods, contributing to the excellence of the facility. As soon as this maintenance policy will be well established for the whole synchrotron, it would be useful to integrate the maintenance issues at the very beginning of the « Upgrade » Project.