Integration – preliminary ideas on routing and tests

Slides:



Advertisements
Similar presentations
André Augustinus 16 June 2003 DCS Workshop Safety.
Advertisements

04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Cable and Service Installation David Warner Colorado State University May 11, 2009.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
2 Davide Aguglia TE-EPC-FPC Sept. 23 rd rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Status of the NA62 network R. Fantechi 23/5/2012.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
CLEX TBM T0 Cooling system Design strategy 1 V. Soldatov, A. Vamvakas, BE-RF
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
DCal-ALICE integration and installation plan and status A. Tauro.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
Straw man layout for ATLAS ID for SLHC
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Update of MVD services and requests
Beam
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
- CT INSTALLATION PROCEDURE OVERVIEW -
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Micro Vertex Detector of PANDA Strip Detector
CMS Area Working Group Meeting
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
T1 Electronic status Conclusions Electronics Cards:
n_TOF “Draft” plans for YETS and LS2
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Work packages status in Torino and perspectives
Regional Cal. Trigger Milestone: Production & Testing Complete
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Integration – preliminary ideas on routing and tests D. Calvo

Presented by B. Giraudo and D. Orecchini MVD integration – I step MVD assembled with the services inside the straw tracker and around the beam and target pipes in a dedicated laboratory at the GSI (? To be verified) [ about 12m x 10m] Routing from the GBT to the super modules done Routing from the DC/DC converters to the super modules and to the GBT done Routing of the cooling pipes from patch panels to super modules done MVD test performed using cooling system , power supplies and optical fibers with daq, locally Presented by B. Giraudo and D. Orecchini 2

Presented by B. Giraudo and D. Orecchini MVD installation – II step MVD – Straw tracker – Beam/Target cross system moves from the dedicated laboratory (?) to the platform in front of the magnet Presented by B. Giraudo and D. Orecchini 3

MVD installation – III step Connection of optical fibers, supply cables, cooling lines following the SCENARIO 1 SCENARIO 2 MVD test 4

MVD installation – SCENARIO 1 Supply cables from Racks to patch panels Optical fibers from Count. Room to patch panels Cooling lines from cooling plant + pressure controllers to be connected to the maniforlds around the beam pipe Intermidiate patch panels are installed in front of the magnet Issue with the optical fibers intermidiate connections ? Probably no Supply cables and cooling pipes are disconnected after the test for the sliding in the magnet of only the tracker More convenience in the test phase and in the installation because the supports are limited The voltage drop of the short cables from patchpanels to the DCDC is perfect All parts have to be arranged to avoid conflit with the phase of the calorimeter installation 5

MVD installation – SCENARIO 2 Supply cables from Racks (S2) Optical fibers from Count. Room (S2) Cooling lines from cooling plant + pressure controllers to be connected to the maniforlds around the beam pipe No interruption of the optical fibers and of the supply cables. No additional patch panels Long optical fibers and long supply cables (higher vol. drop) to handle with supports Calorimeter already in front of the tracker platform to fulfill the routing operation The calorimeter moves when the tracker slides inside the magnet Optical fiber and supply cables spares have to be routed from the beginning. All parts have to be arranged to avoid conflit with the phase of the calorimeter installation 6

MVD installation – IV step The system slides in the magnet Connection of the cooling lines Connection of fibers and supply cables at the patch panels in the SCENARIO 1 MVD test disconnection of the cooling lines and of fibers and supply cables at the patch panels in the SCENARIO 1 7

MVD installation – V step After the calorimeter installation Connection of the cooling lines Connection of the optical fibers and supply lines (SCENARIO 1) MVD test Supply cables from racks + patch panels in front of the magnet(S1) Supply cables from racks (S2) Optical fibers from c.r. + patch panels in front of the magnet(S1) Optical fibers from counting room (S2) Cooling lines from cooling plant connection + pressure controllers in front of the magnet 8