City of Bloomfield Hills

Slides:



Advertisements
Similar presentations
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Advertisements

Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City of Bloomfield Hills 2015 Road Improvement Program.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
CITY OF VAUGHAN Watermain Replacement and Roadworks in Kleinburg (Napier Street, John Street, Kellam Street and Stegman’s Mill Road) WELCOME TO THE KLEINBURG.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Rte 11, Canton Village PIN Village Board Meeting October 29 th, 2007 Project Information.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Westside Yucca Sewer Interceptor Project Open House & Public Meeting April 26, 2016.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Board of County Commissioners Presented By the Orange County Public Works Department November 18, 2008 Revisions to the Subdivision Regulations.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
2016 Mill and Overlay Project
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Agenda Updates to Driveway and Sidewalk specifications and permits
Town of Brighton, Department of Public Works
Jefferson County SA Red Rocks Site Approval
Scoping Meeting April 20th 6:00 pm
City of San Jacinto 7th Street Pavement Repairs
S.R. 30A / U.S. 98 / Panama City Beach Parkway
June 5, 2017.
General Road Construction Information
Interdisciplinary teams Existing or new roadway
Santa Cruz avenue sidewalks Project
DICKINSON AVENUE RECONSTRUCTION
Request #2 Request #1 Segment built by LCPS.
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
SW Gage Blvd - Street Repair Project
FY14-19 Recommended Infrastructure and Capital Improvement Plan (ICIP)
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
1200 West Widening and Reconstruction Project
State Aid Standards Development
Geometric Design: General Concept CE331 Transportation Engineering.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Meadow Lake Boulevard Street Extension Project
S.R. 26 Road Rehabilitation in Clinton County
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Robincrest/Elmgate/ Linneman Improvements Welcome!
2019 Capital Program Title of Presentation
2020 DWRF Project Plan Kalamazoo, Cooper and Parchment
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

City of Bloomfield Hills 2018-2019 water main Improvement Program Jamie’s Slide

introductions City Commissioners in Attendance City Staff David Hendrickson, City Manager Jamie Spivy, DPW Foreman Hubbell, Roth and Clark, Inc. James Burton, PE Melissa Coatta, PE Jamie’s Slide

Purpose of meeting Provide an update on the water main and road program Define the scope of the proposed work Review the tentative Construction Schedule Answer general questions Opportunity to review work near your home on a one-on-one basis Jamie’s Slide

update The City Commission selected the southwest portion of the City for road improvements in coordination with a water main replacement. Existing 6 inch water main replacement Road replacement via milling, pulverizing, or reconstruction New shoulders or concrete curb and gutter Select drainage improvements Jamie’s Slide

disclaimer Plans subject to change due to budgetary concerns Jamie’s Slide

General construction issues We aim to minimize: The disruption and inconvenience of construction Increased truck traffic Jamie’s Slide

General construction issues We suggest: Following the proposed detours Avoid driving through the construction areas (Local Traffic Acceptable) HRC Field Representative will be available Jamie’s Slide

Underground Installations Typical construction Jamie’s Slide Underground Installations

Typical construction Jamie’s Slide Brick Pavers

Typical construction Jamie’s Slide Roadway Grading

Proposed project Melissa’s Slide

Road Reconstruction or Road Reconstruction with Water Main Replacement EXIST. HMA PAVEMENT. WIDTH VARIES 22’-23’ Road Reconstruction or Road Reconstruction with Water Main Replacement Melissa’s Slide

Road Reconstruction or Road Reconstruction with Water Main Replacement 10’ LANE TOTAL WIDTH 22’ Road Reconstruction or Road Reconstruction with Water Main Replacement 9.5’ Conc. Curb or Gravel Shoulder Melissa’s Slide

Proposed Improvements Roadways with reconstruction Drainage improvements Possible Edge drain Installation Possible storm sewer and catch basin rehabilitation Potential raising of existing storm manholes Consistent 20’ road width 2’ Gravel Shoulder or Concrete Curb and Gutter Melissa’s Slide

Water service schedule Roadways with water main replacement: Watermain shut down will typically occur for approximately 4 hours, 2-3 times Boiled water advisories may be required Appropriate notification will be distributed Melissa’s Slide

Mill and Overlay Melissa’s Slide

Proposed Improvements Roadways with mill and overlay Possible storm sewer and catch basin rehabilitation Consistent 20’ road width 2’ Gravel Shoulder or Concrete Curb and Gutter Melissa’s Slide

Proposed tentative schedule Consumers Energy Gas Main Improvements: Completed the east portion of the subdivision in 2017 West subdivision will be replaced in Spring 2018 Streets with Water Main Replacement: Construction in Spring and Summer of 2018 Street with Road Reconstruction and Mill and Overlay Construction in 2018-2019 Working with City Budgets Melissa’s Slide

Maintaining traffic Roads closed to thru traffic Local traffic only The City reserves the right to enforce one-way traffic only Follow suggested traffic detours Limited Trips = Increase in Contractor Productivity Reduces duration of inconvenience Melissa’s Slide

Previous project: Manorwood drive (2016) Melissa’s Slide Completed Pre-Construction

Previous project: Vaughan road (2015) Melissa’s Slide Completed Pre-Construction

Previous project: S. Cranbrook road (2015) Melissa’s Slide Completed Pre-Construction

Previous Project: Epping lane (2011) Melissa’s Slide Pre-Construction Completed

Drainage improvements Intent is to preserve and protect the road Will be installed in select locations Looking for input from residents Melissa’s Slide

Drainage improvements Melissa’s Slide Existing Conditions along Kennebec Court Existing Conditions along Rudgate Road

City right-of-way management Utility Installations Intent of right-of-way is to provide and maintain public infrastructure Vehicle Safety Recovery Zone (Clear Zone/Crash Zone) Lateral Offsets Recommended 4’ to 5’ lateral offset free from obstructions for low volume low speed roads Melissa’s Slide

City right-of-way management Trees within City ROW may be impacted In-line with utility improvements Overhanging roadway Aesthetic improvements within City ROW Intent is “Not To Disturb” Will be placed back to the best of the Contractor’s ability Examples (Brick paver drives, planting beds, stone mailboxes) Will be placed back to meet minimum City requirements Examples (Guardrails, Concrete drives) Melissa’s Slide

City right-of-way management Melissa’s Slide

City right-of-way management Melissa’s Slide

City right-of-way management Melissa’s Slide

City right-of-way management Melissa’s Slide

Existing Drainage Problems Utilities Irrigation Systems City of Bloomfield hills Road improvement program is interested in knowing about? Various Concerns Existing Drainage Problems Utilities Irrigation Systems Lighting, Invisible Dog Fences, Landscaping, etc. Special Events Jamie’s Slide

Road improvement program contacts City website www.bloomfieldhillsmi.net City Hall 248.644.1520 City Manager, David Hendrickson DPW Foreman, Jamie Spivy Hubbell, Roth and Clark, Inc. Jamie Burton, P.E. Vice President, LEED AP, CFM 248.454.6363 jburton@hrcengr.com Melissa Coatta, P.E. Senior Project Engineer 248.454.6567 mcoatta@hrcengr.com Jamie’s Slide