Machine parameters of SuperKEKB

Slides:



Advertisements
Similar presentations
Crab crossing and crab waist at super KEKB K. Ohmi (KEK) Super B workshop at SLAC 15-17, June 2006 Thanks, M. Biagini, Y. Funakoshi, Y. Ohnishi, K.Oide,
Advertisements

Short bunches in SPEAR J. Safranek for the SPEAR3 accelerator group November 2, 20101J. Safranek CLS THz Workshop.
ILC Accelerator School Kyungpook National University
1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
Bunch compressors ILC Accelerator School May Eun-San Kim Kyungpook National University.
1 Luminosity of cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
Accelerator Plans at KEK
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II.
10 36 ??? 20 Apr K. Oide Super B Workshop.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Beam-beam simulations M.E. Biagini, K. Ohmi, E. Paoloni, P. Raimondi, D. Shatilov, M. Zobov INFN Frascati, KEK, INFN Pisa, SLAC, BINP April 26th, 2006.
Crab-Crossing and Luminosity Simulations J.W. Flanagan, KEK
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
CSR calculation in ERL merger section Tsukasa Miyajima KEK, High Energy Accelerator Research Organization 8 November, 2010, 13:30 Mini Workshop on CSR.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
July 2002M. Venturini1 Coherent Synchrotron Radiation and Longitudinal Beam Dynamics in Rings M. Venturini and R. Warnock Stanford Linear Accelerator Center.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Synchrotron radiation at eRHIC Yichao Jing, Oleg Chubar, Vladimir N. Litvinenko.
Max Zolotorev AFRD LBNL 1 Max Zolotorev CBP AFRD LBNL Radiation & Acceleration Tutorial.
Simulation of Microbunching Instability in LCLS with Laser-Heater Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Main Bullet #1 Main Bullet #2 Main Bullet #3 Advances in Coherent Synchrotron Radiation at the Canadian Light Source Jack Bergstrom.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Scaling Law of Coherent Synchrotron Radiation in a Rectangular Chamber Yunhai Cai FEL & Beam Physics Department SLAC National Accelerator Laboratory TWIICE.
Beam-Beam Simulations Ji Qiang US LARP CM12 Collaboration Meeting Napa Valley, April 8-10, 2009 Lawrence Berkeley National Laboratory.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Emittances Normalised r.m.s. Emittances at Damping Ring Extraction Horizontal Emittance (  m) Vertical Emittance (  m)
Electron cloud in Final Doublet IRENG07) ILC Interaction Region Engineering Design Workshop (IRENG07) September 17-21, 2007, SLAC Lanfa Wang.
Measurement of the Electron Cloud Density in a Solenoid Field and a Quadrupole Field K. Kanazawa and H. Fukuma KEK June 2009 CTA09 1.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Beam dynamics in crab collision K. Ohmi (KEK) IR2005, 3-4, Oct FNAL Thanks to K. Akai, K. Hosoyama, K. Oide, T. Sen, F. Zimmermann.
Issues related to crossing angles Frank Zimmermann.
Accelerator Physics Topic VIII Coherent Synchrotron Radiation
T. Agoh (KEK) Introduction CSR emitted in wiggler
fundamental equations of LHC performance
Beam-beam effects in eRHIC and MeRHIC
ILCDR08 10 July 2008 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK)
Electron cloud and collective effects in the FCC-ee Interaction Region
The PEP-II Interaction e+e- Factories Workshop
Beam-beam R&D for eRHIC Linac-Ring Option
Microbunching of Electron Beam in a Magnetic Compressor
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Status of SuperKEKB Design: Lattice and IR
Some CEPC SRF considerations
A Head-Tail Simulation Code for Electron Cloud
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Beam-beam simulations with crossing anlge + crab-waist
Beam-Beam Effects in the CEPC
Accelerator R&D Results from the B-factory
LCLS bunch length monitor utilizing coherent radiation
Upgrade plan of KEKB from 2012 to 20XX Y. Ohnishi / KEK
Super-B Accelerator Overview
Coherent Synchrotron Radiation Study
SuperB IRC Meeting Frascati, Nov. 13th 2007
Sawtooth effect in CEPC PDR/APDR
Enhanced Self-Amplified Spontaneous Emission
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Machine parameters of SuperKEKB SuperKEKB Mini Workshop November 28, 2003 Machine parameters of SuperKEKB Y. Ohnishi / KEK

Luminosity Luminosity formula: Alternative luminosity formula: Beam-beam parameter: Transparency condition: N : number of particles/bunch f : collision frequency sy*/sx* = 1%-6% RL/Rxy = ~0.8 w/o dynamical effect due to beam-beam Assumed that no beam size blowup due to electron cloud.

Luminosity reductions Beam-beam reduction K0 : Bessel function qx : crossing angle (in the boosted frame) Montague's factor longitudinal beam distribution ex/ey=18/0.18 nm ex/ey=30/1.8 nm

List of machine parameters Luminosity 1035 is optimized by by*=3 mm, xy=0.05, I=9.4/4.1 A.

Beam-beam parameters Luminosity is given by overlap integral: (cm-2s-1) (Ohmi, beam-beam simulations) ~1 ~0.8 includes beam size ratio and ratio of reduction factors.

Coherent synchrotron radiation SR is emitted independently when wave length is shorter than bunch length. Intensity ∝ N (E ∝ N1/2;statistical) SR of longer wave length is emitted coherently. (E ∝ N;same phase) Intensity ∝ N2 ← Coherent Synchrotron Radiation (CSR) CSR spectrum region is enlarged as bunch length decreases. Refs. : Yokoya, Oho2003, Juhao Wu, G. Stupakov, et al., SLAC-PUB-9629, G. Stupakov and S. Heifets, PR-ST vol.5 054402

Coherent synchrotron radiation (cont'd) Emitted energy per unit orbit length : B A A' B' L=rq g ~ c Energy gain is expressed by : Head of bunch is accelerated, tail of bunch is decelerated. F(z/sz) z +z Head of bunch Tail of bunch

Coherent synchrotron radiation (cont'd) Wakefield catch up bunch ? Shielding effect A L=rq ~ c B g B' Short range in a bunch ! A' g 3 mm half of chamber height : h C If chamber height >> h, reflected light reaches after bunch passes through. A L B shielding cut-off wave length : lc ~ 4 mm (r=23/2/p1/2) in LER SR at longer wave length is shielded. Coefficient r has less accuracy.

CSR in wiggler Dispersion relation: Impedance of wiggler (low frequency) On ReZ and ImZ plane W→+i0 n0 : number of particles/unit length Particles : Gaussian distribution Bw : peak magnetic field of the wiggler (0.773 T) lw : period in meter (1.6 m)

CSR in wiggler (cont'd) Threshold wave length vs bunch current Lw = 120 m (half of KEKB LER) sz = 3 mm sz = 4 mm sz = 5 mm sz = 6 mm

Integrated luminosity Hazumi 5x1035 major upgrade more RF more RF crab cavities