WF on NB-IoT Radio Link Monitoring Performance Test Procedure

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

Way Forward Proposals for Inter-band CA Consisting of B41
WF on PBCH Coverage Enhancement
LTE-A Carrier Aggregation
WF on DL LBT Scheme for DRS
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
Relative Timing of Super-Frames in the Legacy-Support Mode IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE S802.16m-08/244.
QUALCOMM PROPRIETARY QUALCOMM Corporate R & D1 Performance of VoIP Services over 3GPP WCDMA Networks Ozcan Ozturk Qualcomm.
WF on MCOT and CWS for LBT priority classes
WF on Regulation and MCOT
LTE Measurement Monitor and Trace (MMT) Application.
WF on LAA DL Multi-Channel LBT
Proposal for NB-IoT single-tone only UE
EHRPD-LTE Inter Technology Spectrum Optimization Source: Qualcomm Incorporated Contact: Jun Wang/George Cherian September 9, 2013 Notice ©2013. All rights.
Definition of Device Collaboration Mode for Low Power Consumption IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16p-10_0030.
Way forward on RAN2 aspects of multiple PRB operations
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
3GPP2 TSG-C SWG1.2 Maui, HI C R2/C of 12 TSG-C WG3/SWG1.2 joint meeting 12/07/05 BCMCS FEC evaluation simulation requirements.
Text Proposal of PC-A-MAP IE Assignment in IEEE D4 (16.3.6) Document Number: IEEE C802.16m-10/xxxx+8 Date Submitted: Source: Yu-Hao Chang,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
Way Forward on UE measurement definition and capability
Offline Discussion on remaining details about RACH Procedure
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on single Tx switched UL
RACH configuration ZTE, Sanechips R1-171xxxx
Proposals on remaining issues on search space
3GPP RAN1 #90 meeting summary on LAA Enhancements
WF on Beam Indication for Beam Management
WF on measurement capability and measurement gap for NR
3GPP TSG RAN WG1 Meeting #90bis
R : SRS Enhancements for LTE-A
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
Discussion on TB-ack/CBG-Nack for initial transmissions
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
WF on transmit diversity for DFTsOFDM
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
LTE-A Relays and Repeaters
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on Radio Link Monitoring in NR
WF on UE mandatory channel bandwidth for NR bands
Evaluation Model for LTE-Advanced
WF on 4Tx UL Codebook For CP-OFDM
WF on UL Beam Management
WF on UL Beam Management
WF on CB-group based retransmission
Intra LTE Handover.
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
TESTNG TECHNIQUES FOR NB-IOT PHYSICAL LAYER
Adaptive Quiet Period Control in TDD WRAN System
WF on LTE-NR Coexistence
Comment resolution on CID 20175
Comment resolution on CID 20175
3GPP RAN1 status on NR-Unlicensed
Jing Sun, Qualcomm Incorporated Rapporteur of Rel.16 NR-U Work Item
Presentation transcript:

WF on NB-IoT Radio Link Monitoring Performance Test Procedure R4-79AH-0262 3GPP TSG-RAN WG4 #79-AH Hong Kong, 28th – 30th June, 2016 WF on NB-IoT Radio Link Monitoring Performance Test Procedure Qualcomm Incorporated, …

Background In RAN4#79, RAN4 discussed RLM test procedure The legacy RLM tests have an SNR variation as shown in figure below Periodic CQI transmission on UL is used to test UE IS/OOS behaviour

NB-IoT RLM Test Proposal Proposed SNR variation for OOS testing for RLM SNR1 SNR3 T1 A T2 B T3 C D

NB-IoT RLM Test Proposal OOS Proposed Test Procedure The UE behaviour in each test during time durations T1, T2, T3 shall be as follows: During the period up to time point A, eNB shall provide the UE with a UL grant UE is expected to decode the UL grant, switch to UL, and complete the UL transmission UE switches back to DL During the period from time point A to time point B, SNR shall be linearly decreases from SNR 1 to SNR 3 During the period from time point B to time point D, Option 1 The above 3 steps are repeated ‘[10]’ times to ensure UE decoded NPDCCH at least once during T3 Option 2 UE initiates RRC-re-establishment procedure after T310 expires during T3 The UE shall stop transmitting uplink signal no later than time point C and continues to keep its transmitter off until point D

NB-IoT RLM Test Proposal Test Requirements(cont’d) The UE shall stop transmitting uplink signal at least in all sub frames configured for UL transmission according to the configured UL grant no later than time point D ([TBD] ms after the start of time duration T3). The rate of correct events observed during repeated tests shall be at least 90%

NB-IoT RLM Test Proposal Proposed SNR variation for IS testing for RLM SNR1 SNR3 A T1 B T2 C T3 D

NB-IoT RLM Test Proposal IS Proposed Test Procedure The UE behaviour in each test during time durations T1, T2, T3 shall be as follows: During the period up to time point B, Option 1 eNB shall provide the UE with a UL grant UE is expected to decode the UL grant, UE switches back to DL The above 3 steps are repeated ‘[10]’ times to ensure UE decoded NPDCCH at least once during T3 Option 2 UE initiates RRC-re-establishment procedure after T310 expires during T3 The UE shall stop transmitting uplink signal no later than time point C and continues to keep its transmitter off until point D During the period from time point B to time point C, SNR shall be linearly increases from SNR 1 to SNR 3 During the period from time point C to time point D, switch to UL, and complete the UL transmission

NB-IoT RLM Test Proposal Test Requirements(cont’d) The UE shall start transmitting uplink signal at least in all sub frames configured for UL transmission according to the configured UL grant no later than time point D ([TBD] ms after the start of time duration T3) The rate of correct events observed during repeated tests shall be at least 90%