PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
19 January 2006 PS&SPS DAYS AD equipment tests and startup with beam Slide 1 AD and AD experimental areas: equipment tests and startup with beam Tommy.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
PS CHILLED WATER PROJECT SHUT-DOWN WHY? THE AGE OF THE PIPING - installed in years ago - technical life of piping normally years.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
What’s Falling Apart in the Injector Chain ? PS/SPS Days January 2005.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
SPS Applications Software issues - startup in 2006 and legacy problems
ABT-EC EYETS Activities 2nd reports
Situation of the Static Var Compensators at CERN.
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
Controls & software Andy Butterworth.
Status and Plans for InCA
TE-MSC activities in SPS during LS2
Injector De-cabling Project
Evolution and future of the Access safety and control systems
Beam Loss and Radiation Working Group: Conclusions
Configuration Management and Layout Database ELENA Project
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TE-ABT Activities for LS2
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Olof Bärring LCG-LHCC Review, 22nd September 2008
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
the CERN Electrical network protection system
SPS activities during LS2 TE-EPC (Power Converter Group)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
James Ridewood BE-OP-SPS
TE-MSC activities in SPS during YETS
East Hall under construction
Michael Benedikt AB/OP
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Beam requirements and operational scenarios in 2010
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Experimental Areas – LS2 planning
ABP/RTL Main RTL Activities for 2007/8:-
Presentation transcript:

Installations, modifications, consolidation in 2005: What is planned and can we do it ? Louis Rinolfi CERN - PS&SPS Days - 13th January 2005

Layout of PS & SPS complex

Open questions presented at ATC ATC - 11h March 2004   1) When beams (p+, Pb ions, e-) should be available in 2006 ? Present scenario is beginning of April 2006. 2) Access control not available in winter 2005/2006 for ions commissioning period ? 3) Bottleneck in PS main coil supply --> first PS magnet will be removed in February 2005 --> according to which procedure ? 4) What about the SPS control room at the start-up in February 2006 if the new CCC is not ready ? --> consequences on the hardware tests ? 5) What is the available support from other departments (mainly AT, TS and SC/RP) ? Can we plan all shut-down works as presented today ? Otherwise what are the priorities ?

Answers today  1) When beams (p+, Pb ions, e-) should be available in 2006 ? Present scenario is beginning of April 2006. ==> ??? 2) Access control not available in winter 2005/2006 for ions commissioning period ? ==> Solution consist to consider LEIR ring as a secondary beam zone. 3) Bottleneck in PS main coil supply --> first PS magnet will be removed in February 2005 --> according to which procedure ? ==> Magnet evaluation for 100 magnets finished 18th December 2004. ==> Order of removal for the weakest 40 magnets still under discussion. 4) What about the SPS control room at the start-up in February 2006 if the new CCC is not ready ? --> consequences on the hardware tests ? ==> ??? 5) What is the available support from other departments (mainly AT, TS and SC/RP) ? ??? Can we plan all shut-down works as presented today ? ==> ??? Otherwise what are the priorities ? ==> LHC,LHC,.... but the PS&SPS injectors complex should be operational in 2006 !

Inputs for shut-down activities in 2005 Planning available for operational machines Planning available for CERN and AB projects Information available from the AB Consolidation project Previous documents written about consolidation and proposed installations Reviews made in the ABIC Several beams should be in use in 2005 (Not all machines are shut-down) No considerations on budget and manpower (Only technical matters)

What is planned in 2005 ? Only major items Linac 2: Routine shut-down Linac3: Installation of the new ion source PSB: Routine shut-down PS: 40 main magnets renovated and 100 magnets realigned with zero offset AD: Upgrade of the e-cooling system (=> but no resources clearly defined) Transfer lines: TT2: Installation of new quadrupoles for ions beams. SPS: LSS6 + TCC6 activities for TI 2 line (Old target, irradiated cables, 4 kickers, ...) Replace TDC2 irradiated + PVC cables Quadrupole jacks upgrade Compensator consolidation 18 kV cables replacement (Last news from TS/EL "not foreseen")

What is planned in 2005 ? Jan 05 Jan 06

"Interferences" with projects LHC CNGS SLI LTI I-LHC CTF3 Linac4 All these projects require work from AT/VAC, AT/MEL, TS, SC/RP. Very often it is the same people dealing with several projects and several machines Same remark for all AB technical groups (ATB, BDI, BT, CO, PO, RF) Some illustrations: Lack of SC/RP technicians for SPS ==> Delays of installations in TCC6 (for TI2) From mid-2005, almost all AT/VAC people will be on LHC ==> Consequences ??? No available bellows ==> Crisis for LEIR installation in AT/VAC and TS/MME Same AT/MEL people work on PS magnets, LEIR, CTF3 magnets ==> ??? .......

What could delay the start-up in 2006 ? General 1) Management policy: diversion of resources, late changes to 2006 schedule, etc. 2) Contractual uncertainties: suppliers or subcontractors going bust or strike. 3) Delivery times: given the heaviness of CERN purchasing procedures. 4) Delays in CCC availability (a non-reversible activity which has begun).

What could delay the start-up in 2006 ? Specific to the PS complex 1. Material damage due to accidents during the PS revision programme. 2. No modernization of the PS tunnel air conditioning equipment. Breakdowns or flooding (seen by the DG during his visit at the PS). 3. High Voltage breakdowns of the remaining unrevised magnets during the end of shutdown. Specific to the SPS complex 1. Nothing that is predictable (if an activity can't be finished it won't be started: example of TDC2 irradiated + PVC cables foreseen in September 2005). 2) Insufficient H/W tests time.

Why 12 weeks of hardware tests in 2006 ? 1) Because AB-PO alone require 10 weeks after a normal shutdown. Their power tests are usually carried out with tunnel OPEN. However we request to do the same tests with tunnel closed (preclosure) to allow other tests in parallel (ex. Machine interlocks, Magnet polarities, etc.) 2) Because we will have a BRAND NEW CCC. 3) Because all the equipment, including general services (CV + EL) will not have functioned normally for over a year. 4) Because we need some contingency. 5) Because of the psychological effect; work will ALWAYS continue until just BEYOND the closing date. 6) Because experience suggests (ex. TI8 H/W test period was 10 weeks + 2 weeks cold check-out).

Proposals The PS&SPS documentation is in poor state. ==> Take this year to update the layouts and drawings. ==> More manpower from TS/MME and more money. The SPS H/W tests period does not cover the tests of the SPS main magnets/converters which can only be carried out from EDF supply. Under the present contract is beyond the first of April. ==> Change the EDF contract in order to start these tests in March 2006. ==> More teams to work in parallel.

Conclusion 1) No major show stopper for the long 2005 shut-down "We can do it !" 2) End of shut-down installations in the PS and SPS complex: ==> 21st December 2005 3) The 3 months of hardware tests for PS are foreseen mainly for the renovated magnets and cold check out. The 3 months of hardware tests for SPS do not include cold check out. AB-OP requests a further month: ==> No beam possible before the first of April 2006 in PS ==> No beam possible before the first of May 2006 in SPS

Acknowledgments Thanks to Machine Superintendents: C. Mastrostefano (Linac2 & 3) S. De Man (PSB) R. Brown (PS) C. Lacroix (AD & n-TOF) A. Spinks (SPS) and M. Planning: J. Monteiro