Introduction to Development of a city-wide traffic calming program

Slides:



Advertisements
Similar presentations
 Corridor Plan and Meeting Objective  Project Background  Short Term Improvements  Long Term Improvements/Corridor Planning  Construction Funding.
Advertisements

Louisiana Safe Routes To School Program
DESCRIPTIONDESCRIPTION PROCEDURESPROCEDURES CUT- THROUGH RESTRICTION TRAFFIC- CALMING $200 FINE FOR SPEEDING SIGNS MULTI-WAY STOP (“MWS”) SIGNS THROUGH.
to 2015 Operating Budgets Governance & Priorities Committee March 7, 2013.
River Road West Penrose Street Bridge Street Road Safety Scheme May 2014.
Department of Transportation NTMP 2.0 Neighborhood Traffic Management Program TAC Meeting December 11, 2009.
MICHIGAN DEPARTMENT OF TRANSPORTATION Davison TSC
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Westminster City Council and Westminster Primary Care Trust Voluntary Sector Funding 2009/10 Voluntary Sector Funding Eligibility, Application Form Funding,
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Lecture Six Radu ANDREI, PhD, P.E., Professor of Civil Engineering
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Boulder County Mountain Canyon Cyclist-Motorist Working Group October 29, 2009.
1 RMS Task Force on Retail Market Customer/ESI Transition October 16, 2003.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Is Transportation Sustainable?. Objectives By the end of this unit, students will be able to: 1.Examine and prioritize transportation project impacts.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
TECHNOLOGY PLANNING FOR Mary Mehsikomer Division of School Improvement November 2006.
Proposition 1 Workshop: the Grant Application Process July 2015.
Neighborhood Traffic Management Program (NTMP) Background The NTMP program was develop to promote and maintain the safety and livability of local residential.
King Fahd University of Petroleum and Minerals Civil Engineering Department CE599-Seminar Traffic Calming Techniques By: Maen A. Abu Olba.
District 5 Town Hall Neighborhood Safety June 14th, :00 NW Area Command Substation.
December 2015 Detailed Presentation STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS CALIFORNIA Water Boards.
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
LOCAL GOVT. FINANCE: An Introduction to CAPITAL PLANNING Alan Probst, Local Government Specialist Local Government Center University of Wisconsin – Extension.
OneBayArea Grant Update ( Cycle 2 STP/CMAQ) Regional Advisory Working Group April 3, 2012 Craig Goldblatt, MTC.
ROTARY GLOBAL/DUNN SCHOLARSHIP IMPLEMENTATION SCHEDULE AND PROCEDURE FOR D Using the flyer E. & W. Hartford clubs advertise/spread the word in their.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
Volunteer Crossing Guard Program Marin County Office of Education Superintendents Meeting February 3, 2016.
An Overview of Stakeholder Roles and Federal Legislation at Grade Crossings May 18, 2016 presentation to CPWA Saskatchewan Chapter, Saskatoon Railway Safety.
Adjusting Speed Limits
City of Charlottesville
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
Bristol’s 20 mph experience Peter Mann Service Director, Transport
PREFERENTIAL PERMIT PARKING
Vision zero IN NYC NYC's Data Driven Approach to Saving Lives
Financial Aid Overview 2016/2017
Complete Streets Award Program
School travel planning an engineer will love
Pilot Project Evaluation
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
Finance Committee & City Council August 8, 2016
2 Selecting a Healthcare Information System.
Neighbourhood Traffic Calming Open House
Traffic Committee Meeting August 17, 2017
Introduction to Traffic Calming “vekehrsberuhigung”
WELCOME.
GMAS Preproposal Entry
Traffic Committee Ontario Traffic Manual & Warrants March 24, 2015
City of Saginaw Curb Side Leaf Collection Update
Residential Placement Application 2011
RPPP Policy and Procedures Update
Participatory Road Program neighborhood meeting Donahoo 174th Street
City of Wilmington Bike Plan Update
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM
Public Consultation on Traffic Calming in Gifford
United Way of Benton & Lincoln Counties
Traffic Study Presented by Keith Wenners, pe, ptoe
Contract Award to Toole Design Group, LLC for Consultant Services to Prepare a Complete Street Blueprint Programming Tool City Council July 23, 2018 Item.
HERO UNIT Training Module
[OUR CITY NAME]’S OLD SEWERS
NEIGHBOURHOOD TRAFFIC SCHEMES PRIORITIZATION METHOD
Selecting a Health Care
Kenilworth – Amberleigh Homeowners Special Assessment Meeting
Fixing Our City’s Old Sewers
Recommended Best Practices in Research Fund Management
City Council Meeting May 23, 2011
ARCHIE BRIGGS Traffic Calming
Presentation transcript:

Introduction to Development of a city-wide traffic calming program Public SAFETY COMMITTEE MEETING October 20, 2016

Traffic calming is the combination of mainly physical measures that reduce the negative effects of motor vehicle use, alter driver behavior and improve conditions for non- motorized street users. --I.M. Lockwood, “ITE Traffic Calming Definition,” ITE Journal, Vol. 67, July 1997, pp. 22–24.

The Three e’s of traffic calming Enforcement Education Engineering #4 - Evaluation

process Can be a few steps up to dozens of steps Many of the steps can be combined Each step can be simple or complicated

Elements of The Process Application form Preliminary investigation Initial recommendation OR Contact city traffic engineer Public engagement Funding established Maintenance agreement Installation Review Removal (if necessary)

Elements of the form Contact information Specific location/area of concern Map Details of concern What would you like to see happen? Would you be willing to serve on a committee to investigate? May include initial public engagement petition

Submitting THE FORM Is there an annual deadline to make a request or open? If all traffic calming funding is coming from the same source To coordinate construction/installation Online or paper only?

Used in the process to make sure that there is neighborhood support for traffic calming The step with the most amount of choices public engagement

Decisions for the Public Engagement Process Include: Schedule Type People Initial engagement to gauge support To present idea(s) To present design, schedule, cost, etc. After installation to gauge effectiveness Petitions and Surveys Mailed or door-to-door Neighborhood meeting Special meeting for location Meeting for all traffic calming concerns Included in other meetings (i.e. Ward meetings) Committees Within a certain radius of the location of concern Local institutions (schools, etc.) Local businesses Other residents City officials/staff Consultant

Other things to consider Minimum level of support (i.e. two-thirds of households within one block) May include initial public engagement survey or petition with the original form Does city staff only process/move forward forms for locations where there is a minimum level of initial support? Should be available to all residents within a radius of the area of concern Residents may not be able to make scheduled meetings One signature per household or one signature per adult?

Maintenance Landscaping agreement with residents Allows alternative designs if there is no budget or agreement for maintenance: Bollards instead of planters Hardscaping or painting instead of landscaping

Frequent Concerns are: Sight Lines at Intersections Intersection Congestion Pedestrian/ Child Safety Speeding High Volumes

Criteria for Street Eligibility Fn. Classification Lanes/width Volume Speed/85th percentile Speed limit

Preliminary Investigation Done by city staff or consultant? Site visit Pictures Intersection/location sketch List signs and note speed limit Request crash reports from police Review preapproved solution list

Next Steps There is a need for a traffic calming device, and the solution is in the established Brentwood Toolkit Further steps are handled by the Public Safety Committee and the city staff There is a need for a traffic calming device, but the solution is not in the established Brentwood Toolkit Contact the city traffic engineer There is not a need for a traffic calming device at this time

If no device is warranted: Request increased police presence Implement educational measures Evaluate traffic control signage and regulatory signage to ensure minimum requirements are met Time limit for re-evaluation (i.e. one year, five years for a second application)

Prioritization of Projects Considerations Ways to Prioritize Funding usually dictates which approved projects and how many can be done Some funding applies only to specific locations or situations It is best to have plans for when funding become available from others (grants) Dates of application may or may not affect which measures are installed – funding cycles, weather, etc. First come, first served Highest volumes Highest speeds Most public support Funding availability

Preapproved Solution List Low-cost solutions Easy implementation Designed to address the concern Do NOT include measures not recommended for traffic calming

Other Considerations Motorists may speed up between traffic calming devices to make up for lost time Causes acceleration and braking noises Measures need to be installed at intervals that don’t allow cars to get back up to speed Water drainage needs to be considered Maintenance Leaf and debris cleanup Snow plowing

FUNDING

COSTS INCLUDE Investigative City staff’s time Consultant fees (one location may be $1,500 to $5,000) Implementation Materials Installation Maintenance

INSTALLATION SCHEDULE Frequently dependent on season and temperature Usually between March and October Temperatures between 60 and 90 degrees Fahrenheit Dry conditions Short-, mid-, and long-term measures Depends on funding

AFTER INSTALLATION Monitor the effectiveness of the device Solicit residents’ feedback (postcard survey) Allow for removal of device following a set process

Removal Process Resident petition with (two-thirds?) majority for removal Engineering considerations Maintenance considerations