Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
2- Crankshaft, Piston Pin, and Piston Rod Bushing.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Drawer Systems Smart Slide Slidea Smart Box
>78>63>42 >33 Average 57.2 Median 58.5 Highest 98 Lowest 18.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Helical Milling Unit 71.
AUTOMATIC LATHES These are machine tools in which components are machined automatically. The working cycle is fully automatic that is repeated to produce.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
ATLAS Pixel Detector July 2003 ETC ‘04 E. Anderssen LBNL BPSS and Service Panels Santa Cruz, CA E Anderssen LBNL.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Summary of first round of testing of shim concept for modular coil assembly
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
IPC-2221 Connectors and Interconnects
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
The analysis runs in the following slides are based on a W8 x 58.0 wide beam with dimensions shown bellow.
CLAS12 Drift Chamber Prototyping
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
ATLAS Pixel Detector Pixel Support Tube Interfaces Pixel Support Tube PRR CERN, Geneve E. Anderssen, LBNL.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
Fluid Power Control.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
FORCES SPRINGS This section of work is also known as Hookes Law.
Mechanics of Solids (M2H321546)
Annex 4 - Moving Frame and Whiffletree assembly
Belt Drives.
No Solder Battery Interrupter
Easy centering and setting system
Date of download: 10/8/2017 Copyright © ASME. All rights reserved.
ATLAS pixel module assembly flow
Electricity and Magnetism
MQXC Nb-Ti 120mm 120T/m 2m models
GEAR CUTTING PREPARED BY SOUNDHAR.A
SBN Far Detector Installation & Integration
DEVICE FOR THE IMPLANTATION OF NEURAL ELECTRODE ARRAYS
new straw end plug: D=10.6 mm straws support frame Levan option
MP – I BROACHING machines
Status of straw production straw module assembling
SNS COLLEGE OF ENGINEERING
Beam Pipe and Service Support Structure Production Progress
Low Mass mechanical design
GEAR CUTTING.
Assignments cont’d… 1. Determine
CDC Structure S. Uno KEK
Electricity and Magnetism
Making a simple steady hand game
Enclosure openings with wires
Looks like a manual, but it’s really a Powerglide!
Presentation transcript:

IBL Wire Handling Concepts for Beampipe Support and Adjustment Neal Hartman June 21, 2011

Wire “Handling” Beampipe Extraction Requirements Must either extend wire with zero radius increase OR remove adjuster Preferably, we can handle both Beampipe mounting requirements Must be able to “mount” wires to IST far inside the package This should be achievable with only wire action (not an absolute requirement, but preferable)

Extraction – Extend Wire with no Radius Increase Installed Wire Extension Wire Wire Collet Trim back wire braid Wire Collet Epoxy or solder Wire Collet Inject or flow Into new collet Now Wire MAY pass Through collet

Extraction – Remove Adjuster 1/2 Adjustor Longeron Wire Install Temporary Jig Temporary Fixation Jig Adjustor Longeron Cut

Extraction – Remove Adjuster 2/2 Temporary Fixation Jig Adjustor Longeron Remove Adjustor, install Extension Temporary Fixation Jig Small Wire Crimp Longeron Extension Wire Now wire can pass into longeron

Beampipe Mounting Mechanism OPEN for Insertion Closed for Support This is shown for Beampipe Diameter of ~50mm

IST Mounting Mechanism OPEN for Insertion Clear bore Dia. 130 Closed for Support This is shown for IST Diameter of ~86mm

Issues – Wire Mounting Cruciform Hole is about 200mm This shouldn’t pose problem for inserting wire mounting system However, mounts exceed this diameter when actuated Could be problematic on one side of the ID for beampipe bakeout (large axial motion) Wire also runs quite close to the cruciform Limits the size of the “leaf springs” and could be problematic May need positive engagement to ensure load carrying capacity for vertical wire (see next slide)

Wire Mechanism w/ Positive Engagement Receiving fixtures On horizontal springs (perhaps unnecessary) Pins on vertical springs Actuation of horizontal wires performed first, then vertical wires, to engage pins and provide Positive engagement for movement/support in both dimensions.

Potential Solution to Size of Wire Mounting Mechanism Thinner Thicker Fits within 200mm Diameter, but only barely…

Next Steps Clearly, all of this needs prototyping Wire extension Adjustor removal Wire mounting For wire mounting, before prototype… Must analyse flexible structure (composite material) Define thicknesses, laminate, etc. Reduce size? Define necessary clear bore for IST insertion… One other note – baseline IBL weight will most likely exceed the wire tensions used in the original adjustors. This will most likely require some kind of re-design in order to handle higher load.