Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.

Slides:



Advertisements
Similar presentations
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Advertisements

SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.
PAL/POSTECH 제 2 회 한국 국제선형충돌가속기 워크숍 Waveguide System for Linear Collider Woon-Ha Hwang Linac Division Pohang Accelerator Laboratory 2005,12,28.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Design of Standing-Wave Accelerator Structure
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
High-gradient Experiments with Narrow Waveguides Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Noboru Kudo, Shuji Matsumoto, Shigeki Fukuda, Mitsuo Akemoto,
CERN klystron test stand – CLIC Workshop, Oct page 1 F. Peauger High-Power RF Test Areas: Design & Planning Progress of the CERN Klystron Test Area.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
30 GHz waveguide line modification towards 12 GHz.
Update of KEK X-band Research Activity March 3, 2009 Shuji Matsumoto Accelerator Laboratory, KEK 2009/3/31US High Gradient Workshop.
CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
CLIC meeting, Prospects for developing new tubes I. Syratchev, CERN.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
W. Wuensch CLIC project meeting High-power rf structure testing.
Update on PETS experiments (Igor for the CLIC collaboration)
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
RF Pulse Compression system for CTF3.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Test Accelerating Structures Designs, Objectives and Critical Issues
Areal RF Station A. Vardanyan
Prospects for developing new tubes
Multi-stage pulse compressor
Syratchev(CERN) on behalf of
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
Abstract EuSPARC and EuPRAXIA projects
Development of X-band 50MW klystron in BVERI
Manipulating RF phase and amplitude at high power level.
An X-band system for phase space linearisation on CLARA
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Optimisation of single bunch linac for FERMI upgrade
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
NC Accelerator Structures
Review of rf structure test results
SPARC RF gun status by P. Musumeci Review committee
12 GHz High Power RF components requirements for CEA activities
Testing Infrastructure, Program and Milestones
Shuji Matsumoto Accelerator Lab., KEK
Task 2: High-gradient normal-conducting technology development
X-band Facilities and High Gradient Tests Stands Around the World
CLIC Klystron based. Updates 2017.
High Efficiency X-band Klystron Design Study
High Efficiency X-band Klystron Design Study
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
Electric Field Amplitude (MV/m)
CEPC RF Power Sources System
CLIC Feasibility Demonstration at CTF3
Operational Experience with LCLS RF systems
Presentation transcript:

Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev

Could the testing period be reduced by increasing the repetition rate? 50 MW klystron. The XL-4 klystron was tested at 120 Hz and reduced pulse length - 1000 ns. To make it to operate reliably at a full spec some modification of the RF window and collector will be needed? Accelerating structure cooling circuit is designed for 50 Hz, increasing average power by factor 2-3 (100-150 Hz) is feasible (under investigation). Operation. Currently the processing is conducted at ~ 10-5-10-4 BRD trip rate. With 2 structures running in parallel the after-BRD down time will slow down processing progress. Longer term tests (at a low BRD trip rate) will profit from the higher repetition rate. 1 min after-BRD-down-time was assumed Processing zone With a single source, the repetition rate and processing time are not correlated linearly Running: BDR TR ~10-6 Processing: BDR TR ~10-5

Can we go even higher (above 100 Hz) in a repetition rate? 40 MW x few hundred ns, X-band klystrons cluster power station + Pulse compressor. 0+/2 0 +/2 -90 0 0+90 2xPhM 2x5.5 MW 400 Hz V1 1 AM V2 2 Load Amplitude: 10 Constant phase PC, Q0=1.8x105 To structures ~ 40 MW Example: Tin=3.2s, Tout=300 ns Pin=2 x 5.5 MW, Pout=38 MW Peak power vs. pulse length Tin=3.2s, =4.75 Structures =4.75 Power, norm. Combining the two stations we get an accesses to 80 MW peak power kHz range test facility! Drawback: The efficiency goes down to ~ 14% for 240 ns pulses. Load Time, ns

High power 4 port commutation with a phase manipulation 12 GHz (5.5 MW x 4.6 sec x 400 Hz) x 4 PhM PhM AM AM Pav/Kl.=10 kW 100 Hz x 4 400 Hz x 1 133 Hz x 3 82 MW x 240 ns (61 MW x 400 ns) 200 Hz x 2 By RF phase manipulation of klystrons pairs (0- ), we can established 4 testing slots running at 100 Hz each. In the case of a single/few structure/s breakdown/s, the missing pulse can be send to any other testing channel, thus maintaining the overall repetition rate available for the tests.

Single klystron parameters (for 78 MW x 240ns compressed pulse) Single klystron peak and average power issues 5.5MW-6.5MW peak power klystron looks like an optimal choice to provide efficient generation of the pulses for CLIC accelerating structures testing. +20% for RF components losses Time, ns Power, MW Single klystron parameters (for 78 MW x 240ns compressed pulse) 400 Hz/Kl. example Operation issues: After breakdown, the accelerating structure needs to be re-processed. This is normally done by gradual increasing both the peak power and pulse length. In our case it can be done in a simple way by changing only the klystron pulse length without re-programming klystron phase modulation. In a similar way the peak power can be balanced between the channels

The 9. 3 GHz version of such a tube is available on the market The 9.3 GHz version of such a tube is available on the market. At least two companies (CPI and L3 in US) have developed industrial prototypes and Thales (Europe) has a paper design. L3 CPI Thales All these companies were contacted and expressed their interests in scaling the existing 9.3 GHz devices to 12 GHz

High peak power klystron vs. medium power klystrons cluster. Performance issues. Equivalent in terms of delivered number of pulses

Compact SLED-type X-band pulse compressor. Design & components by F. Peauger, CEA. H01 Mode Converter F36mm Short circuit + pumping port H0 1 31 Cavity H01 Circular Taper (F36mm→ F50mm) Iris Hybrid To Accelerating Structure From Klystron SLAC-type Double height 3 dB hybrid H01M ‘rugby’ cavity Mode: H0,1,31 Length: 420mm Max. : 110 mm Q0: 1.82x105 (HFSS) H01 tapers (36->50) KEK-type compact H10-H01 mode converter The mode converters are used to pre-fabricate H01 mode in a circular waveguide ( 50 m). The coupling iris and tuning piston are also placed in the same diameter to avoid diffraction coupling to the modes with higher radial number (H0,N>1,M). The cavity shape is optimized to provide required Q0 (1.8x105). The internal tapers are designed to minimize modes conversions of the operating mode. The fixed tuning pistons will be used as a separate (not the part of vacuum system) pieces to balance the cavities frequencies. Final frequency tuning will be done with the cooling water temperature control. These components were designed and fabricated by CEA as a French in-kind contribution to the 12 GHz klystron station waveguide network at CERN

Other applications The new collaboration between CLIC/CERN and KVI/GRONINGEN (Netherlands) has been recently established. The subject is the development of high gradient electron linac based on CLIC (12 GHz) accelerating structure technology capable to operate at ~1 kHz repetition rate. X-band linac module The moderate peak power klystron cluster plus pulse compressor is the most economic way to deliver high peak RF power and high repetition rate.