Pam Lopker March 2009 1 1.

Slides:



Advertisements
Similar presentations
Company Background: Nestlé SA is a giant food and pharmaceuticals company that operates virtually all over the world. Headquartered in Vevey, Switzerland,
Advertisements

__________________________________HDPL Believes in …_____________________________ Monitor - your company from anywhere in the world View - instant reports.
Supply Chain Management
Migration Director Engineered for Change.
“The Effective Enterprise: Building for the Future” Running QAD on Your Mobile Device Steve McHugh-Broomstreet Martin Cohen-Broomstreet Amy Vasquez-Strategic.
Enterprise Resource Planning (ERP). ERP: Process-oriented, Enterprise-wide, Transaction-tracking Information Systems Since the 60’s, information technology.
Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches Gary Wasserman – Applications Specialist.
Optimize Your Manufacturing Equipment With EAM Nancy Majure EAM Specialist, QAD Inc From MRO to Project Management.
CRM Deployment. GROWTH Growth in CRM markets Deploymen t Types.
QAD Business Intelligence: A Closer Look Luc Janssen Director, Product Management, QAD Inc. QAD Explore 2012.
NextEnd. Supply Chain Management – Definitions Supply chain management is the management of a network of interconnected businesses involved in the ultimate.
QAD Solutions for Configurable Products Frank Feustel, Director, Product Management, QAD Inc. Jim Smith, QAD Improvement Leader, R. W. Beckett Corporation.
QAD Distributed Order Management
Sage User Network 11 th June 2009 Andrew Credland - Product Development Manager.
Easy On Boarding Carol Cvitkovich Director, Global Resource Model.
SUBTITLE TEXT. Optimal Solutions What is E- Business Suite Oracle E-Business Suite is the most comprehensive suite of integrated, global business applications.
Carl Holmes Christy Lee Vendor Information SAP is headquarters is in Walldorf, Germany. Largest computer software company in the world. 47,804 employees.
Building Blocks for the Effective Enterprise MWUG Fall 2013 Pam Lopker President and Founder.
QAD Master Scheduling Workbench (QAD MSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC MMUG.
Tally.Server 9 Enhancing the Operational Efficiencies of your Enterprise.
How to Establish a Measurable ROI from Implementing IBM Maximo Asset Management Mountain West Maximo User Group Monday, August 3 rd, 2015 Created by Leon.
QAD Production Scheduling Workbench (QAD PSW) Carianne Nieuwstraten – Sr. Product Manager – MFG/SC Brent Shooltz – Sr. Business Systems Analyst – MFG/SC.
1 Copyright © 2004, Manugistics, Inc. All rights reserved. Objectives At the end of this section you will be able to:  Understand the key pains and challenges.
ADTRAN: The Network Access Company. 2 Telecommunications u Multi-billion dollar industry u Voice and digital data transmission u Carrier and End User.
Pam Lopker March QAD Proprietary Op Budget ROI Efficiency Training.
The Power of Enabling Technology
Intelligent Supply Chain Management Course Transportation Scheduling
1 Slides used in class may be different from slides in student pack Managerial Briefing 13 Enterprise Resource Planning Systems  Enterprise Resource Planning.
Main Function of SCM (Part I)
Towards a GHG Reduction Strategy for Ontario: Industrial Competitiveness, Investment, Innovation, & Growth September 2010 Canadian Manufacturers.
Report Manager works with any Sage Accpac ERP product. GL,AR,AP,IC,PO,SN,VM, etc. Use Report Manager to design simple user interfaces with finders, drop.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
QAD Demand Management Patrick Grace, QAD Solutions Consultant September 27th, Fall MWUG Session.
SAP Process Mining by Celonis
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
CSI - SMART Business NUF Thursday 17th November 2016.
Tago Tago IoT DAY GRAIN BIN LEVEL? The epicenter of middleware
AAtom ERP.
Digital Aerospace and Defense Build, Service, and Fly Better
Supply Chain Management
Dikos, George, and Stavroula Spyropoulou
CIM Modeling for E&U - (Short Version)
Outsourcing.
Aggregate Planning Chapter 13.
of our Partners and Customers
Pull Manufacturing and Just In Time
Getting Started with cPacket
Mobius Field Order Application Overview
Carl Holmes Christy Lee
Facilities and Aggregate Planning
Smart Manufacturing in the Process Industry
SUPPLY CHAIN MANAGEMENT
ELEMENTARY BUSINESS PROCESS MODELING :
إدارة اللوجستيات وسلاسل الإمداد
CEO Owner Update June 12, 2018.
Nancy McCrimmon – 32 Soft Inc.
Building Competitive advantage through functional level strategies
Supply Chain Management
How businesses use information systems (Part 2)
Catalyst Pitchback Energy Efficiency as a Service
ADTRAN: The Network Access Company
A Process View of the Supply Chain
Building Competitive advantage through functional level strategies
Enterprise Resource Planning, 1st Edition by Mary Sumner
-Operations Strategy -ERP – The Power of Information
NİŞANTAŞI ÜNİVERSİTESİ
EC7095 Financial Statement Analysis
Building Competitive Advantage Through Functional-Level Strategies
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Pam Lopker March 2009 1 1

Looks of talk about the terrible state of the economy… personally I do not see a problem .. Problems are a state of mind ..

Op Budget ROI Efficiency Training

Operating Budget Reduce Operation Cost

Reduce Operation Cost Sign of the Times on Earth Business is Down Restructuring Reduction of Head Count Reviewing all cost

On Demand On Demand

AMS

ROI

Focus on after sale service QAD Service & Support (SSM, MFS, FSS) Vertical Auto  CPG  EI  LS  Focus on after sale service Version(s) QAD 2008 onwards retro-fit to eb2.1 Case Study FEI is implementing MFS and FSS to schedule and manage their field service operations (475 engineers, 50+ sites)– Why – Complex and error prone field service management process with a lot of human intervention Payback is 6-12 months .. Deployment On Premise On Demand On Appliance Languages 11 Installs 850+ sites

Improve On Time Delivery QAD Supply Visualization Vertical Auto  CPG  EI  LS  Improve On Time Delivery Version(s) 8.5 onwards ERP Agnostic Case Study Invensys needed to improve OTD, while reducing inventory and premium freight Why – OTD was 48%, carrying $19M in inventory, premium freight costs were 5.5% of Sales Payback – realized 20 to 1 payback in Year 1 OTD improved to 91%, 31.8% reduction in inventory, 33% reduction in premium freight Deployment On Demand Languages Any Installs 210 sites

Improve Customer Service QAD Demand Driven Suite Vertical Auto  CPG  EI  LS  Improve Customer Service Version(s) All Versions ERP Agnostic Case Study Why – Demand Planning = “one man” process. No visibility or credibility. Customer service declining. System inflexible to market changes in time of expansion. Payback – 3 months had 3% reduction in FG inventory, 10-15% improvement in customer service while double digit sales growth Nampak is currently implementing Inventory Optimization after which it plans to purchase Rough Cut & add more Portal users. Deployment On Demand On Premise Languages English Installs 28 sites

Improve Factory Throughput QAD Enterprise Asset Management Vertical Auto  CPG  EI  LS  Improve Factory Throughput Version(s) eB2 onwards ERP Agnostic Case Study Why EAM? - BALL was buying/closing plants to take capacity out of the market. They needed to ensure that the remaining plants could meet & exceed production demand. BALL invested in QAD EAM to drive & delivery an asset reliability strategy! – BALL is now evaluating EAM for other non-QAD Divisions – Fantastic up-selling opportunity! Deployment On Premise Languages 11 Installs 177 sites

Supporting Growth QAD Transportation Management (TMS) Vertical Auto  CPG  EI  LS  Supporting Growth Version(s) QAD 7.4 onwards Case Study Manufacturer of high temp ceramic refractory products. Why QAD TMS? ANH’s highly customized TMS legacy system not able to keep up with growing demand. QAD TMS was implemented, then rolled out to 46 sites allowing ANH to standardize processes and increase throughput by 15% to more then 65,000 truckloads annually. ROI < 12 months. Deployment On Premise On Appliance Languages Installs 4200 sites 40 + Parcel Carrier Certifications

Usability and Efficiency Efficiency and Usability

Fast, Easy, Simple Input Output Process Navigation Install The Export to Excel / Import from Excel function for eg. the Adress Maintenance of QAD Enterprise Applications EE allows to easily load adress data from Excel and to Export to Excel for maintenance.

Should not need 3rd party products in most cases Fast, Easy, Simple Input Output Process Navigation Install Train Should not need 3rd party products in most cases

Fast, Easy, Simple Input Output Process Navigation Install Train

Fast, Easy, Simple Input Output Process Navigation Install Train

Fast, Easy, Simple Input Output Process Navigation Install Train Implementation flows

Fast, Easy, Simple Input Output Process Navigation Install Train 21

Fast, Easy, Simple Input Output Process Navigation Install Train 22 22

Fast, Easy, Simple Input Output Process Navigation Install Train 23 23

DEMO Training

Fast, Easy, Simple Input Output Process Navigation Install Train 25 25