Actual Dimensions in the Forward Spectrometer

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
PANDA Collaboration Meeting Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting GSI
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
The CKOV support By P Lau. Hall space available to the Ckov & TOF 0 Beam line 3.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
PANDA electromagnetic calorimeters Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group INSTR08 28 Feb - 05 Mar 2008.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
SiD IR & MDI Engineering Progress Prelude to a Discussion of Integration with ILD and Based on Marco Oriunno’s Jan 2008 Talk at SiD CM Tom Markiewicz/SLAC.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
PANDA GSI 13. December 2006 PID TAG Georg Schepers PANDA Technical Assessment Group PID Status Report G. Schepers for the PID TAG GSI PID TAG.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
UPDATE ON ID INTEGRATION Alice TB, E.Rosso ALICE TECHNICAL BOARD CERN, Ettore Rosso / CERN 1. 3 rd Cone 2. V0_L and Si_3 support 3.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
AUTO-FEEDER PARTS Visit : GIN STAND PARTS Visit :
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
December 3, 20031Muon Integration Meeting Outline: Status of Calorimeter and Muon system Plug simulations Status of plug dimensions Conclusions Reminder:
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
TDR for the PANDA Forward Spectrometer Calorimeter (Shashlyk) Pavel Semenov IHEP, Protvino PANDA Collaboration Meeting, Giessen 20 March 2015.
Status of the PANDA Forward Spectrometer Calorimeter (Shashlyk) Pavel Semenov IHEP, Protvino PANDA-Russia Workshop FRRC, Moscow 27 May 2015.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Status of the forward tracker design
Roller/rail - System for PANDA
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
FSC status and plans Pavel Semenov IHEP, Protvino
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Update of MVD services and requests
The LHCb Installation Story
VELO-installation meeting CERN, January 17, 2006
Present status of the flux return yoke design
PANDA Yoke of the Magnet
PANDA Mechanical Design
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
IHEP group Shashlyk activity towards TDR
Integration issues at IHEP
muon subgroup meeting Report on TDR activities since dec2011
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
Alwest Holding Tank Relocation
OT Survey & Adjustment Outline: Survey technique at present
Orthographic Sketch Solution
Neutron guide Shielding Concept
Rack Placement Chopper Workshop
PANDA Forward Spectrometer Calorimeter (Shashlyk) status and plans
Presentation transcript:

Actual Dimensions in the Forward Spectrometer Bernd Lewandowski GSI Darmstadt Forward Spectrometer FZ Jülich 08. 09. 2009 Actual Dimensions in the Forward Spectrometer

Fwd Detector: Space for the Subsystems Changes for the Subsystems in the Forward Spectrometer require changes in the forseen space: Shashlyk EMC Forward Muon Detector Luminosity Monitor 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Shashlyk EMC-Pavel Semenov (TB March 09) 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Shashlyk EMC-Pavel Semenov (TB March 09) 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Forward Muon -Gena Alexeev (TB March 09) 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Forward Muon -Gena Alexeev (TB March 09) 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Side View TOF DC RICH HCAL EMC LUMI 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Top View RICH: 1200 DC: 200 TOF: 100 EMC: 1150 HCAL: 1500 LUMI: 2000 Fwd Detector starts at 6050 End of Detector: 13000 Last component: Pump system: 500 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Maintenance for the Forward Spectrometer Access to all subsystems? Access in the In-Beam position Access in the Off-Beam position 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Shashlyk EMC- A.Levin (MEC 09-09) Support frame (right part) Supermodule Support frame (left part) Press bar Roller Detector with parted mechanical structure. Front view. 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Shashlyk EMC- A.Levin (MEC 09-09) Moving from closed position between two neighbour detectors to have access to PMT side of EMC Detector (right part) Detector (left part) Maintenace rails Maintenace rail Concrete block or support platform Main moving platform Maintenance for detector with parted structure. 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Movement of systems on the platform 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Movement of systems on the platform 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer

Possible additional changes are: Increasement of cut-out for beampipe (might be necessary for Lumi-monitor) 08. 09. 2009 Bernd Lewandowski - GSI Darmstadt - Forward Spectrometer