TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS

Slides:



Advertisements
Similar presentations
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Advertisements

AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Electrical & Control Power Supplies Trevor Hartnett.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
Progress with POPS Jean-Paul Burnet TE/EPC IEFC workshop, Feb 2010.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
September 19-20, 2007 R. Lambiase Power Supplies Bob Lambiase September 19-20, 2007 DOE Annual Review.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
2 Davide Aguglia TE-EPC-FPC Sept. 23 rd rd PSB injection EPC powering rack space coordination meeting Stripping foil chicane BSW magnets powering.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Report Technical Director Storage-Ring-Installation Completed
Update on the PSB Cooling and Ventilation Systems
Report Technical Director Storage-Ring-Installation Completed
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
TE-EPC internal review of the ELENA project
BE-ICS activities for LIU Project
BE-CO Activities for LIU-CPS and LIU-SPS
EYETS Works EN-EL [ FC excluded ]
EYETS David Hay EN-OSS.
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
Construction and Commissioning of Electronic Test Benches
LIU–PLI report LIU PSB meeting.
BE-ICS activities for LIU Project
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
B245 Modifications & Cabling Update
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
EN-CV interventions during EYETS for PS and PSB
YETS PS + PS SWY + TT2 Facility Coordinator:
TE-MSC activities in SPS during YETS
POPS Strategy for Restarting & Repairing
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
Elettra – Sincrotrone Trieste S.C.p.A.
Linac4 Connection Broken Line 07/08/19
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS 2016-2017 13-10-2016 coordination meeting Yves Gaillard, Serge Pittet TE/EPC on behalf of TE/EPC colleagues

Summary Linac 2 Replacement of LT.BHZ20 power converter PSB Installation of a power switch in 271 (MPS Output filter) New Alcove Construction for PSB Injection BSW Power Converter’s Pulse Transformers Installation of the new power converters for BSW magnets PS POPS DSP1 capacitor bank and filtering capacitors replacement PS-MPS (motor/generator set) tests on PS magnets Replacement of QSK, DHZ and DVT power converters Installation of new power converter for RPADH.355.PR.RXN060 Installation of new power converters for the 40MHz RF cavities Control upgrade of the PFW and W8 circuits power converters TT2 Installation of a new power converter for F16.QFN215 Magnet

Replacement of LT.BHZ20 power converter + 1 spare LINAC2 Replacement of LT.BHZ20 power converter + 1 spare LTBHZ20 (old TEKELEC)  new APOLO_2p Done: Power converters delivered To do during EYETS: AC, DC and Ethernet cabling. Cooling Installation and commissioning of the converters. APOLO 2p (±450V/±400Arms) WHEN: 1 week testing (March 2017) WHERE: Bdg. 355 Technical responsible: Christophe MUTIN

PSB WHERE: 271 WHEN: January 2017 Technical responsible: ECR: Modification of the PSB – MPS output filter As part of the POPSB project a new switch will be installed in building 271. This switch will allow us to go back to the MPS in case of problems with POPSB. To do: Moving and rewiring capacitor banks of the output filter Status: Done: Metallic support for capacitors To do during EYETS: Switch installation Moving capacitors Cabling Modification of fences WHEN: WHERE: January 2017 271 Technical responsible: ECR: A. BESSONNAT PSB-LJ-EC-0008

PSB WHERE: WHEN: Building 361 February and March 2017 Installation of the new power converters for PSB injection BSW magnets (stripping foil) For the new 160MeV beam injection from Linac4 into the PSB, 16 new power converters have to be installed in BRF2 room and a section of the BAT in building 361. Status: Done: area cleaned, new false floor built, concrete passages and doors extended for rack transportation. In progress: New updated ECR for false floor reinforcement (for transport) To do during EYETS: False floor reinforcement (not under direct EPC responsibility) and power converters installation BRF2 WHEN: WHERE: February and March 2017 Building 361 Technical responsible: ECR: Davide AGUGLIA Pending

PSB WHERE: WHEN: Building 361 During all EYETS time New Alcove Construction for PSB Injection BSW (stripping foil) Power Converter’s Pulse Transformers For the new 160MeV beam injection from Linac4 into the PSB, a new set of slow bumper magnets (BSW) has to be supplied by new power converters including pulse transformers. Status: Done: Alcove CERN design and ECR In progress: Civil engineering final structure design (External contract) To do during EYETS: Civil engineering works to build at least the new alcove’s concrete floor/slab New Alcove WHEN: WHERE: During all EYETS time Building 361 Technical responsible: ECR: Davide AGUGLIA PSB-K-EC-0002

POPS activities EYETS 2016-2017 2 new fully equipped containers installed during next EYETS When: February 2017 Output filter capacitors need to be changed with new more robust solution. 4 capacitors to change. Time request: 1 week testing during hardware tests period (March 2017) Technical responsible: Fulvio BOATTINI

PS MPS activities EYETS 2016-2017 After the major event of the 20.05.2016 (short-circuit at one disconnecting switch), it’s necessary to test the PS-MPS on the PS magnets. Status: Done: 06/2016: Siemens maintenance and verifications 06/2016: Replacement damaged switch by copper bars 06/2016: Motor/Generator started without load To do during EYETS: 11/2016:PS magnet pulsed with PS-MPS Time request: One day (ideally during RP cooling time before access) Technical responsible: Yves GAILLARD

New power converters for low energy quadrupoles PS New power converters for low energy quadrupoles Replacement of QSK, DHZ and DVT power converters CANCUN_20 ±20A/ ±75V Manufactured in 2015, FGC3 To do during EYETS: Existing converters dismantling. Installation of a new supporting structure. AC, DC and Ethernet cabling. Installation of new racks. Installation and commissioning of the converters. WHERE: WHEN: Bdg. 355 and 368 1 week testing (March 2017) Technical responsible: Serge PITTET ECR: Pending

PS Installation of new power converter for RPADH.355.PR.RXNO60 WHERE: Manufacture and commission Chromaticity Sextupoles Power Converter Status: Done: Power converter installation and services In progress: Production of the Reg FGC3 electronic crate To do during EYETS: Installation of Reg FGC3 crate Commissioning APOLO 2s (900V/450A) WHEN: WHERE: Commissioning: April 2017 Building 355 Technical responsible: Christophe MUTIN

PS Installation of new power converters for 40/80MHz RF cavities WHEN: In the current situation, there are five power converters installed in building 151. These 20 years old converters are rated to 100kW (24kV/4A) and will be replaced by five 200kW (25kV/8A) converters. Status: Done: 3ph 400VAC/400A installed from ERD14 Water cooling To do during EYETS: Installation of one power converter Modification of the supporting structure FGC3 Ethernet cables Five HV DC cables to be installed from bld.355 to RF cavities + one HV DC cable from bld.355 to bld.151 Type: RF25kV (25kV/8A) WHEN: Commissioning: April 2017 WHERE: Building 355 Technical responsible: Louis DE MALLAC ECR: PS-R-EC-0001

PS Control upgrade of the PFW and W8 circuits power converters WHEN: Within the consolidation program, the existing RTI1553 control of the PFW and W8 power converters will be upgraded to FGC3 control. GEREG Reg FGC3 Type: RF25kV (25kV/8A) Status: In progress: Production of Reg FGC3 crates To do during EYETS: Installation of Reg FGC3 crate Commissioning WHEN: WHERE: Commissioning: April 2017 Building 355 Technical responsible: Olivier MICHELS ECR: Pending

TT2 Installation of a new power converter for F16.QFN215 Magnet WHEN: A new regenerative power converter F16.QFN215SPARE will be installed to power the magnet F16.QFN215 in the F16 transfer line (in TT2). Status: Done: Power converter delivered AC cables installed Existing DC cables used To do during EYETS: Gateway for FGC3 Controller Cooling Power converter tests on dummy load Power converter tests in situ Type: SIRIUS (±450V/±900A) WHEN: WHERE: Commissioning: 1 week April 2017 Building 250 Technical responsible: K. PAPASTERGIOU ECR: PS-R-EC-0002