Determination / Verification under JI - Challenges and Pitfalls

Slides:



Advertisements
Similar presentations
Michael Lehmann, DNV 12 March 2011 DOE view on the Validation and Verification Standards (VVS) Improve objectivity in the CDM - 7th CDM Joint Coordination.
Advertisements

1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
Verification of Forest-based Carbon Projects Sebastian Hetsch Carbon Management Service TÜV SÜD Industrie Service GmbH Roundtable on Validation and Verification.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
An Introduction to the: Carbon Markets & Investors Association Promoting efficient market solutions to combat climate change A project developer’s.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
ISO 9001 Interpretation : Exclusions
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
EU MONITORING AND REPORTING GUIDELINES STAKEHOLDER DAY Cologne, 12th May 2005 UK APPROACH: PAST PRESENT AND FUTURE Dr Rob Gemmill Technical Adviser Monitoring.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
TÜV SÜD Industrie Service GmbH Determinations with regard to a JI track 2 Nairobi, 14 th November 2006 JI-SC side event at COP/MOP Thomas Kleiser TÜV SÜD.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
Roundtable on Validation and Verification Issues in LULUCF Projects The World Bank, Washington DC August 24-25, 2009 Issues in Validation of A/R Projects.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Canada’s Experiences & Perspectives on Joint Implementation JI Technical Workshop, Bonn, 9-10 March 2006 Jeanne-Marie Huddleston, Canada’s CDM & JI Office.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
TÜV SÜD Industrie Service GmbH SEVENTH CDM JOINT COORDINATION WORKSHOP PLENARY SESSION SESSION III Transparency and Promotion of the CDM Thomas Kleiser.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
TÜV SÜD Group Carbon Management Service Methodology and Project Development – Notions of a DOE Methodology and Project Development – Notions of a DOE PCF.
Some observations from chilean experience that could affect CDM methodologies by Alfonso Olea (TÜV- SÜD external auditor) APLE Consultores Chile.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
Principal Investigator ESTCP Selection Meeting
Italian policies and programmes on JI
Clean Development Mechanism
process and procedures for assessments
World Health Organization
EIA approval process, Management plan and Monitoring
JISC – work accomplished and challenges ahead
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Role of Parties involved in JI-projects: Sweden
Validation of Forest-based Carbon Projects
Example(s) of JI Track 1 procedures
Principal Investigator ESTCP Selection Meeting
UNFCCC Technical Workshop on Joint Implementation
PREPARATION FOR GMP INSPECTION
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
German Emissions Trading Authority (DEHSt)
DNV experiences and viewpoints
BU IS GIG Chemical, Oil & Gas
Baseline setting and monitoring under JI compared to the CDM approach
The various tracks of JI…
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Theoretical differences between CDM and JI validation/determination
Small-Scale Projects Under JI
Africa Centers of Excellence Project Financial Management
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Presentation transcript:

Determination / Verification under JI - Challenges and Pitfalls Bonn - UNFCCC, February 13th, 2007 Technical Workshop on Joint Implementation Thomas Kleiser thomas.kleiser@tuev-sued.de TÜV SÜD Industrie Service GmbH

Agenda Short Overview TÜV SÜD and Carbon Management Services General Remarks: Validation and Verification, the role of AIEs Determination and Verification of JI-projects: Challenges and Pitfalls 4. Resumee and Expectations

TÜV SÜD and Carbon Management Services Overview: TÜV SÜD and Carbon Management Services

Certification Testing Training What TÜV SÜD Does Certification Testing Training on behalf of industry, trade and commerce, public institutions and private individuals Overview on the entire company: - > 12.000 employees - founded more than 140 years ago - 130 offices in more than 60 countries - 1 bn. € in sales (per business area: 47% industry, 39% mobility, 14% people) www.tuev-sued.com

TÜV SÜD Industrie Service and CMS Department Carbon Management Service (CMS) Founded end of 1999 The team of the Department Carbon Management Service (CMS) maintains a team of around 16 professionals in its HQ in Munich. Globally about 55 local auditors are active for CMS in the field of CDM and JI in more than 40 countries. A key asset of CMS is the high level of technical expertise present in-house. Validation/Determination and Verification of more than 350 CDM and JI projects Accreditation for all scopes under CDM www.tuev-sued.de/our_locations/tuev_sued_group_worldwide

CMS - Activities and Experiences under JI TÜV SÜD - Activities and experiences under JI determinations started end of 2002 (Pre-) Determination of more than 45 JI projects in almost all countries in Eastern Europe as well as projects in some EU-15 countries among these: 14 JI-projects in Ukraine and 12 JI-projects in Russia verification started for around 10 JI projects more than 15 projects published on JI-SC website for Global Stakeholder Consultation Process (GSP) currently 1 (the first) project submitted to JI-SC for final approval

Validation, Verification and the role of AIEs 2. General Remarks: Validation, Verification and the role of AIEs

Reminder: JI Process of Determination and Verification Project Design PDD Proj.Part. ERUs DFP Host Country LoE Determination Det.-Report AIE Acceptance of Verification DFPs LoAs Initial and Periodic Verification Verification Report AIE DFP Host Country Project- Registration JISC Implementation of Project and Monitoring System Monitoring Report

Reminder: Role of AIEs Determination and Verification of JI track 2 projects Carrying out the Global Stakeholder Process (GSP) via JISC website Assessment and approval of project specific baseline and monitoring methodologies Assessment of compliance with national regulations and procedures Initiating of approval of JI track 2 projects (on behalf of Annex I host country) by uploading final reports and LoA s (!) to JISC.

Timing of Determination/Verification 2 ½ - 6 month depending on project and PDD quality Additional issue: in case the validation period can be kept short the risk to adjust the PDD according to new rules/regulations can be minimized. Verification: No predefined period, but can be decided by the PP. Advisable: once per year as this complies with fiscal year and other reporting formats An Initial Verification after project implementation makes always sense at least in complex projects

Decisive parameters in determination/verification process Decisive parameters for determination/verification complexity of the project (small scale/large scale/bundle of sites and methodologies, technology) applied methodology (CDM or project-specific) location of the project availability of local auditors country specific requirements quality of submitted documents

Assistance for project developers - VVM Guidelines Validation and Verification Guidelines for CDM and JI Projects See: http://www.vvmanual.info The VVM is an initiative of World Bank, IETA and all Applicant Entities, which aims to harmonize the process and quality of all GHG assessments. At the same time the VVM gives guidance for PDD developers regarding requirements in the validation and verification process.

CDM Validation Protocol Structure of the VVM Part One: Generic Guidelines Part Two: CDM Validation Part Three: Small Scale CDM Validation Part Four: JI Determination Part Five: Initial Verification Part Six: Periodic Verification Guideline CDM Validation Report Template Report Template JI Determination Report Template Initial Verification Report Template Verification Report Template Protocol CDM Validation Protocol Small Scale CDM Validation Protocol JI Determination Protocol Initial Verification Checklist Verification Checklist

Determination and Verification of JI Projects: Challenges and Pitfalls

Determination Process – Different Steps Different steps of Determination: Pre-check of the project documentation Desk review of PDD, baseline study, monitoring plan as well as further documents such as Business Plan, Technical Study etc. On-site visit/audits: visit of the project location, audits/discussions with project owner and investors, consultation of local authorities, contacts to local stakeholders, identification of national requirements (stakeholder process, EIA), assessment of approval process (licenses, permits, ownership etc.), assessment of the additionality of the project Starting of GSP (parallel to 2-3) via JI-SC website Draft determination protocol (+ report) Issuing of the final determination report with information reference list and determination protocol Submission to the JISC for approval

Determination Process - main topics Main topics of the assessment: Project documentation – project history – project motivation Additionality (additionality tool for CDM projects), business plan, barriers, risks etc. Crediting period/project lifetime Applied technology and technological issues Baseline study – correctness of scenario and assumptions (proof of information given in the PDD) Monitoring Plan – concept, responsibilities, maintenance, calibration, emergency case, internal reviews, trainings etc. Environmental Impact Assessment Local Stakeholder Process Results of the Global Stakeholder Process

3a. Experiences of Determination

Experiences from Determination of JI-Projects In general: Our experiences are positive! most PDDs are well-developed already in the initial phase of determination less revisions of PDDs in comparison to CDM in most cases good data basis high standard in technical planning and technical solutions well-developed monitoring concepts in most PDDs Difficulties: in most cases development of a project-specific methodology and/or bundling of (CDM-) methodologies very complex projects (bundle of a number of measures in one project)

Experiences from determination of JI projects Observed Problems (1): In some cases limited understanding of “additionality” Missing experiences with “additionality tool”/how to proof additionality Mixture of business-as-usual measures and additional measures Project start without clear evidence for JI-consideration at the beginning International accepted default values not always applied / proof for applied national values are sometimes not sufficient Problems in defining project boundaries correctly/ not all sources and emissions included Receipt of LoA

Experiences from Determination of JI-Projects Observed Problems (2): - Changes of project measures/technical solutions during project lifetime Change in project boundaries during the lifetime of the project Changes in the monitoring plan (missing sensibility what a JI project means) Limited Environmental Impact Assessment Limited local stakeholder process Not all “JI-documents” in English available

Pitfalls: Project description The description of the project history and motivation is too limited. The description of the technical equipment to be applied in the project is not detailed enough or even missing. The management structure of the project and the corresponding responsibilities are not clearly described or missing. Risk management tools in case of unintended developments affecting the projects’ success but also the generation of carbon credits is not defined clearly enough.

Pitfalls: Application of Methodologies Expectations are partly too high regarding the contribution of the AIE to the application of already available methodologies (CDM) and the acceptance of project-specific methodologies Not all solutions are acceptable under JI! The project developer needs to develop the project-specific methodology! Applied methodologies are in some cases insufficiently described. Conditions and consequences of the application of the methodologies are sometimes unknown! A lot of projects use a mix of different methodologies – sometimes a confusion in the description of the methodologies emerges. Old CDM-methodology versions are applied.

Pitfalls: Monitoring Monitoring plans are sometimes not sufficiently detailed (in technical issues) and comprehensive enough in the stage of PDD presentation for determination Quality assurance due to national standards, but differences in standards Routines and procedures are well performed by a motivated project team, but mostly not documented in a management system (risk for the future) No project specific manual (work instructions, organization) available

Pitfalls: Environmental Impact Assessment EIA: Elaboration often limited National and international requirements unknown (EU Accession) Only partial aspects of the environmental impacts are considered Frequently the only comment: project is per se environmental additional Limited information on social aspects of the project Consequence: problems with the “Letter of Approval”

Pitfalls: Local Stakeholder Process The project should be presented not only to local authorities but the actual local stakeholders. Appropriate media should be used. Otherwise the local stakeholder process is not very elaborated and limited to support from local and regional authorities. In order to consider comments stakeholder process should take place early in advance.

Experiences: Global Stakeholder Process Stakeholders and Parties contribute rarely to the global stakeholder process but the number of comments is increasing since JI Guidelines are available and publishing via JI-SC website is possible. The chance to comment on projects is mainly only taken by accredited observer organisations as environmental NGOs. Some comments come from competitors. Most comments given are negative. The number of comments for JI projects is lower than for CDM projects. TÜV SÜD welcomes all comments and takes them in its conclusion into account.

3b. Experiences of Verification

Solutions for monitoring use of “best practice” in monitoring and quality assurance reference to accepted standards - norms, - metering equipment, - Third Parties for external services maintenance of a project-specific QM System inclusion of the determination of data uncertainty into MP consideration of conservativeness development of prepared (e.g.) spreadsheets for later use

Advantage: Initial Verification necessity depends on the size of the project (transaction costs) and the requirements of the involved parties latest a first verification at the end of the first year always makes sense an independent assessment of the monitoring plan before starting the project is helpful delivers initial input for interim reports and internal reviews

Experiences from Verification Observed Problems (1): Project Implementation unexpected problems with applicability of methodolgy interpretable descriptions of monitoring method missing approvals or licenses inconsistencies of external data sources use of accuracy indication given by equipment manufacturers no availability of local support (e.g. accredited laboratories)

Experiences from Verification Observed Problems (2): Data Management consistency in time over reporting period data transfer between multiple computerized systems time demand for consolidating data verifiability of data processing (software codes, excel spreadsheets) missing documentations „private Know-How“ of single employees

Experiences from Verification Observed Problems (3): Quality Management missing description of procedures and processes availability of proofs (e.g. calibration documents) missing investigation on representativity of samples (problems with confidence intervals) missing calibration access to plausibility parameter, which can deliver required level of assurance

4. Resumee and Expectations

Resumee Nearly all JI projects determined by us can or could run under Track 2 and are able to fulfil the requirements set up by the JI-SC Knowledge of additionality needs to be improved In some cases major adjustments of the projects will be necessary; also experiences from CDM should be considered in the baseline concept and monitoring plan. deficits in monitoring plans cause problems in verification in some cases Problem: Early projects

Expectations Expectations in regard to JI-SC: Periodic meetings between JI-SC, AIEs, DFPs and project developers would be helpful Additional guidance necessary: a.) grid factors (conservative approach) b.) use of a project-specific methodologies in case a CDM methodology is available c.) use of outdated CDM methodologies Trust in independent entities must be justified by qualified work!

Thank you for your attention! Thomas Kleiser Tel. ++49 89 57 91 – 11 86 Thomas.Kleiser@tuev-sued.de www.netinform.net

TÜV Süd Industrie Service GmbH Carbon Management Service Thomas Kleiser Tel. ++49 89 57 91 – 11 86 Thomas.Kleiser@tuev-sued.de www.netinform.net