ATLAS-AFP interlock validation

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
January 2006Beam dump and injection inhibits / J.Wenninger1 Beam Dump and Injection Inhibits J. Wenninger AB-OP & D. Macina TS-LEA LHC experiments signals.
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
A MOVEMENT CONTROL SYSTEM FOR ROMAN POTS AT THE LHC Ben Farnham, Sylvain Ravat, Federico Ravotti, Mario Deile, Patrick Fassnacht, Odd Oyvind Andreassen,
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
SPS Timing. Outline Timing table Modes of operation Mode switch mechanism External events Creating a timing table Timing event cleaning.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Summary of the technical stop activities on collimators (w17, 2012) O. Aberle – 07/05/12.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
The TV Beam Observation system - BTV
Wednesday
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
2007 IEEE Nuclear Science Symposium (NSS)
About Interlocks, Timing Systems and how to send SPS beams to the LHC
LINAC4 50 MeV phase BIS STATUS
Saturday :12 Stable beams fill 3351 Initial luminosity
Safe mode transmission
SPS East Extraction bump inhibit during COLDEX operation
Upgrade Strategy for the Experimental Vacuum Systems
Commissioning and Testing the LHC Beam Interlock System
Disabling Rules.
Heating of ALFA detectors
Saturday 30th June - Sunday: Rocky !
MPSC Procedures An update
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Thursday morning 09:30 Dump of pPb fill.
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Equipment of experiments directly interfering with the beam operation
Week 35 – Technical Stop and Restart
Beam Dump and Injection Inhibits
Planning at 5 o’clock meeting Friday
LHC Morning Meeting - G. Arduini
Sunday
Test Case Test case Describes an input Description and an expected output Description. Test case ID Section 1: Before execution Section 2: After execution.
1v1.
90m "proper" VdM scans in the 90m/10m optics
Interlocking of LHC experiments
Improving Collimator Setup Efficiency
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
Friday morning 08:00 Stable beams with 840b.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
HI2011 Commissioning Status
Presentation transcript:

ATLAS-AFP interlock validation Sune Jakobsen (EP-UAT) on behalf of ATLAS-AFP 148th MPP 19-05-2017

AFP Interlock validation - outline Outline Injection Permits LVDT-to-limit comparison Reaction to flags LVDT-bypass box Buttons Conclusion Settings for 2017 AFP Interlock validation - outline Test of Injection Permits Test of response to the LVDT-to-limit comparison New in 2017 Test of USER_PERMIT and automatic extraction as a function of all input flags Test of the LVDT-bypass box Test of hardware and software buttons Conclusion of interlock tests Reminder of settings for 2017 ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 2/12 2

AFP Interlock validation – Injection Permits Purpose: Check that the Injection Permit is removed if a Roman Pot is out of garage position. Test sequence: 1. All Roman Pots at HOME position. 2. Observe that the AFP inputs to the ATLAS injection permit are TRUE. 3. Move in the Roman Pot to be tested. 4. Observe that the AFP to the ATLAS injection input for the correct beam is FALSE. 5. Move the Roman Pot to be tested to HOME. 6. Observe that the AFP inputs to the ATLAS injection permit are TRUE. 1 3 5 4 ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 3/12 3

AFP Interlock validation – Injection Permits result Test performed separately on each Roman Pot on 15-05-2017 (details in collimation logbook). All worked correctly. Summary table: ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 4/12 4

AFP Interlock validation – LVDT-to-limit comparison Purpose: Check of the automatic extraction and loss of USER_PERMITs when a limit is violated. Test sequence: Not possible to move to illegal position, therefore: 1. Move in the Roman Pot to be tested. 2. Make position illegal by changing limit. 3. Observed automatic extraction and (not for WARNING) loss of USER PERMIT for the beam affected. 4. When extracted beyond the limit, observe the return of the USER PERMIT. 5. “Ringing” observed for several Roman Pots (not a problem for safety, but not nice for the log). 4 5 5 1 3 3 2 ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 5/12 5

AFP Interlock validation – LVDT-to-limit comparison result Test performed separately on each Roman Pot on 15-05-2017 (details in collimation logbook). All worked correctly. Summary table: “Ringing” for the USER PERMIT observed for several Roman Pots ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 6/12 6

AFP Interlock validation – Reaction to flags Purpose: Check of the reaction to SMP flags and the override key. Test sequence (simplified): 1. Cycle though STABLE_BEAM, UNSTABLE_BEAM and ADJUST and observed extraction and loss of USER PERMITs. 2. Observe correct behavior to LVDT-to-limit comparison in all relevant combinations. 3. Repeat with OVERRIDE in place. STABLE BEAM ADJUST ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 7/12 7

AFP Interlock validation – Reaction to flags Test performed for one Roman Pot per beam on 15-05-2017 (details in collimation logbook). All worked correctly. Summary table on the right: “Ringing” for the USER PERMIT observed for several Roman Pots. ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 8/12 8

AFP Interlock validation – LVDT-bypass box and results Purpose: Check that the LVDT-bypass box force the LVDT comparison TRUE while simultaneously disabling the motors. Fake situations (full definitions in EDMS note): TEST1: Failure with AFP Roman Pots inserted. Beam dump and then insure LHC operation without AFP Roman Pots. TEST2 (The forbidden use case): Problem with AFP Roman Pot inserted. Recovery without beam dump. TEST3 (Holiday mode): Insure LHC operation without AFP Roman Pots when manpower is not available to react fast. TEST4: Failure with AFP Roman Pots in garage. Beam dump and then insure LHC operation without AFP Roman Pots Test performed for one Roman Pot per beam on 15-05-2017 (details in collimation logbook). Result: All worked correctly. PXI OFF PXI OFF ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 9/12 9

ATLAS SLIMOS hardware panel AFP Interlock validation – Test of buttons Purpose: Check functionality of hardware and software buttons. ATLAS SLIMOS hardware panel Tests: Hardware emergency extract: Hardware disable of power to all motors => Extraction (no change in USER PERMITs). Software extract per Roman Pot: Extraction via DCS command to PXI (no change in USER PERMITs). Test performed for one Roman Pot per beam on 15-05-2017 (details in collimation logbook). Result: All worked correctly. ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 10/12 10

AFP Interlock validation – Conclusion Full serious of all the test originally performed for TOTEM and ALFA has now also been performed for the final AFP movement and interlock systems. All is working correctly. Some “ringing observed” on the USER PERMITs, but has no influence on safety aspects. EDMS note in preparation: 1808750 Does the signature list need updating? ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 11/12 11

Reminder for setting for 2017 Previously agreed settings: General Roman Pot setting: TCT + 3 σnominal + 0.3 mm = 12 σnominal + 0.3 mm Minimum 1.5 mm (not relevant for AFP). Extra margin for new system for startup phase: TCT + 3 σnominal + 0.3 mm + 0.5 mm = 12 σnominal + 0.8 mm Settings for AFP in startup phase: Ultimate settings for AFP: AFP suggests to move to the ultimate settings in the middle of the summer (e.g. after MD2). Important to make the change to the ultimate settings no later than in TS2. Suggested margin to WARNING LIMIT: 0.2 mm. Suggested margin to DUMP LIMITs: 0.3 mm. ATLAS-AFP interlock validation 148th MPP 19-05-2017 Sune Jakobsen 12/12 12