Hung Shiu Fung, Thomas Fischer

Slides:



Advertisements
Similar presentations
The Framework Document Version 1: Guidelines for the 10-Year Implementation Plan Overview for GEO-3 February 2004 Helen M. Wood Secretariat Director.
Advertisements

Bridget Durning, Oxford Brookes University Martin Broderick, WSPGenivar Development Studies Association Annual Conference, 3 rd November 2012, London Reflection.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Scoping in the EIA process Proposal Identification Screening
Strategic Environmental Assessment (SEA) Manual Environmental Protection Department H. M. Wong 18 June 2005.
1 Activity 3 - Definition of sustainable developmentDefinition of sustainable development - Environmental Impact Assessment (EIA)Environmental Impact Assessment.
ENVIRONMENTAL MANAGEMENT PLAN
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
CONFIDENTIAL Gulf Environmental Benefit Fund July 2015.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
Development of Lantau Island. Background of the development Lantau Island is the biggest island in Hong Kong Well recognized for its nature conservation.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Restoring and protecting Louisiana’s coast David Peterson – La. AG’s Office – Asst. Attorney General - AG Designee to CPRA Ken Ortego – Vilar and Elliott.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Arctic Marine Strategic Plan Update to the EPPR Working Group Meeting, Ottawa, Canada June 16-17, 2014.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES Public Involvement EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE.
Atlin/Taku Land Use Planning Zoning Concepts Presentation to Multiparty Workshop #6 November 27, 2009.
Rob Verheem The Netherlands EIA Commission
Commission Guidance on inland waterway development in the context of the EU Birds and Habitats Directives Kerstin Sundseth, Ecosystems LTD.
1 Final Regulation Order for Truck and Bus Regulation California Environmental Protection Agency Air Resources Board November 20, 2014.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
New Forest National Park Local Plan Review NFALC Briefing - 21 April 2016 Steve Avery – Executive Director, Strategy & Planning.
BUILDING AN ECOSYSTEM APPROACH TO MANAGING AFRICAN MARINE RESOURCES Agulhas and Somali Current Large Marine Ecosystems Project Report progress National.
PORT OF TACOMA. 1. Background 2. City Process Update 3. Review Guiding Principles 4. Next Steps General Business: City of Tacoma Shoreline Master Program.
ArcGIS for Environment and Natural Resources– An Overview Matt Bullock Nikki Golding.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Business School Chinese Law on Public Participation in the Decision- Making Process of Renewable Energy Projects Yankun Zhao
Stage 2 Light Rail Transit Program “In the ground ready”
Civil Contractors Federation ‘2017 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Comments on the Marine Spatial Planning Bill
Figure 1 General Project Location
Using Games to Effect Organizational Change
Current IAASB Developments
Mawdsley et al 2008 Kimberlee Ott ATOC 5000 April 10, 2017
Green Line Extension Project
Phase 2 Hope Bay Belt Project
UNIVERSITY OF LAGOS FACULTY OF SCIENCE DEPARTMENT OF BOTANY
Social impacts and coastal louisiana
Phase 2 Hope Bay Belt Project
What is Necessary to Ensure Natural Justice in EIA Decision-making?
Future Village development key requirements
Building Capacity on Protected Areas Law & Governance
WORKSHOP 17th Sept 2008 EUROPEAN COMMISSION
Consultation & Participation
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
CIS-Workshop on River Basin Management Plans
Development of Lantau Island
Federal Rulemaking Process for Significant Regulatory Actions
DG Environment, Nature Protection Unit (D3)
EIA- Concept and Practice
DEPT OF TRANSPORT BRIEFING ON SCHOLAR TRANSPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON TRANSPORT 30 AUGUST 2011.
When and how to best consider the provision of the Habitats directive
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Review of Parks Canada’s Planning Permit Process
Hong Kong-Zhuhai-Macau Bridge
Water Science-Policy Interface (CIS-SPI) Progress report
Environmental Impact Assessment EIA
Review of Parks Canada’s Planning Permit Process
Leverage effect of PAFs : experience from CAP integration
Presentation transcript:

Hung Shiu Fung, Thomas Fischer Public Participation Window, Time and Outcome Empirical Case Studies in Hong Kong Hung Shiu Fung, Thomas Fischer

Introduction Public participation is mostly considered as important, because: should contribute to the identification and resolution of conflicts and facilitate project implementation (Glucker et al, 2013) could help solving problems through suggestions of concepts, solutions and mobilizing resources (O’Faircheallaigh, 2010) Is it the case? How does it work?

Overview of Hong Kong EIA System Mainly governed by Environmental Protection Department (EPD) Environmental Permit based EIA findings would be reflected in permit conditions TWO statutory Public Inspection windows May require Stakeholder/ Community Liaison in the Environmental Permit Public inspection Public inspection Stakeholder Liaison Project Profile /Study Brief EIA Report Permit Follow ups EIA Process Project Implementation

Case 1: Biodiversity Conservation in Tung Chung Part of the Tung Chung New Town Expansion Planning Study Tung Ching River and Bay was known for its aquatic and coastal biodiversity Green groups demanded keep it as it was

Case 1: Major EIA and project events EIA Report Approval 3rd Project Profile & Study Brief Project Profile Submission Study Brief Issued EIA Report Submission Environmental Permit Approval 2nd Project Profile & Study Brief 2007 2012 2013 2014 2015 2016 Stage 1 Public Engagement Stage 3 Public Engagement & Drafted Plan release Finalized Plan release Stage 2 Public Engagement & Start Drafting Outline Development plan Revised Concept Plan

Case 1 Major Negotiation events Required to conduct studies on concerned area and species Proposed River Park added to Project Profile Conservation measures stated as Permit Conditions Project Profile Submission Study Brief Issued 2nd Project Profile & Study Brief Environmental Permit Approval 3rd Project Profile & Study Brief EIA Report Approval EIA Report Submission Concerns about potential damage to ecosystem 2012 2013 2014 2015 2016 Request “no work” at the river and bay area Finalized Plan release Stage 1 Public Engagement Stage 3 Public Engagement & Drafted Plan release Stage 2 Public Engagement To be studied River Park and Boundary of conservation Area Proposed Will implement conservation measures, base of EIA result

Case 1: Outcome The lobbying and negotiation took 2 years The river and bay area was modified as part of the storm water management measures Bay area was zoned as Coastal Protection Area River park was viewed as a compromised measure

Case 2: Nuisance at Telegraph Bay Barging Point Part of the South Island Line East Railway Extension Project The railway was generally well Perceived Concerns over the noise and air impact associated with the barging activities

Case 2: Major EIA and Project Events Project Profile Submission Environmental Permit Approved Study Brief Issued EIA Report Submission & Approval Community liaison Group meetings 2008 2009 2010 2011 2015 2016 Preliminary Design Start Gazette of the use of Telegraph Bay Barging Point Project Completion Main civil works Contracts awarded Green light from Government Detail Design Start

Case 2: Major Negotiation Events (Impact Predicted to be within Criteria) Community Liaison Required as Permit Condition EIA Report Submission & Approval Environmental Permit Approved Community liaison Group meetings Concerns about local nuisance Request Additional Monitoring and Mitigation Measures 2011 2010 Objection to the use of site Main civil works Contracts awarded Gazette of the use of Telegraph Bay Barging Point Additional Monitoring Mitigation Measures Implemented

Case 2: Outcome Requests Results Use other barging point Enhancement of Barging Point Design Additional Monitoring Measures to Control Trucks Type and Speed Scheduling the works of heavy machineries Enhancement of Landscape reinstatement Partly Request from the local community changed from prohibiting the use to minimizing nuisance Negotiation focused on the contractor and site management Significant Influence to the construction work

Analysis and Discussion “Early” is a relative term Different concerns associated with different project stage Necessary to engage in both the EIA and Project Implementation Project Implementation and EIA works in parallel, but not directly linked The status of the project implementation usually not transparent Project Profile /Study Brief EIA Report Permit Follow ups Preliminary Design Detail Design Finalized Design Green light Construction

Conclusion Public Participation in EIA have potentials to influence project design and solve socio-environmental conflicts Having multiple participation windows helps Neither connected to each other nor design for continuous negotiation Depends heavily on the will, determination and “know how” Cases that made significant change are not common Frustration when requests got dismissed Should EIA install provisions to align public comments with project implementation schedule?

Thank you!!