What Is Next for SiD ? H.Weerts Argonne Nat. lab..

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
Snowmass, August 16, 2005 H.Weerts SiD Design Goals and Plans for Snowmass Snowmass H.Weerts Argonne Nat. Lab./ Michigan State Univ.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Status Report of the LCC Detector R&D task force Maxim Titov (CEA Saclay) Jan Strube (Tohoku University)
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
BOARD OF DIRECTOR’S MEETING Establish Need Identify issues, needs, and opportunities. Identify the benefits of meeting the needs or taking advantage of.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
SiD collab. Mtg., 30 jan 2008 H.Weerts Stimulate the discussion & Closing Remarks to SiD collaboration meeting 30 January 2008 H.Weerts Argonne National.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
NSDI Strategic Plan Update FGDC Coordination Group Meeting November 19, 2013.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
Local Points of Contact Webinar
Final CALICE OsC meeting: Status and summary of project
CDR The CLIC CDR is now completed. The three volumes can be found as follows:      Volume 1:       Volume 2: 
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
Greenhouse Scholars Impact Plan
Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi
PDAP Junji Haba, KEK.
Preparations for the SiD Workshop at Fermilab, April 9-11
MICE Project in the US: Completion of Efforts
CLIC detector at SiD meeting 28/3/2010
Jimmy Proudfoot Argonne National Laboratory
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
The SiD Detector Outline Overview
The DBD: Outline and Scope
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-33
Title Goes Here Name (s), Organization, CEOS Affiliation CEOS SIT-33
CEOS Work planning Steven Hosford, ESA/CNES, CEO
Henry Ford’s Patient and Family Advisor Approach
Portfolio Management Process & Customer Request Management
ESB Networks Market Release Meeting of the IGG, April 16th 2009
Title Goes Here Organization SIT Workshop Agenda Item #
2016 AES – Draft Commission Regulation implementing Regulation (EC) No 452/2008 Agenda item 2.3 DSS Meeting 3-4 April 2014.
Marine Strategy Framework Directive Common Implementation Strategy 18th Meeting of the Working Group on Good Environmental Status (GES) Action Points.
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
Uploading the Bathing Water reports to the ReportNet
Advanced R&D Lab Review
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-34
9th meeting of the Expert Group on Reporting (22 March 2011)
Central Valley Water Board Meeting of 29 March 2012
Agenda modifications.
Tribal Data WG Fire and Smoke WG Oil and Gas WG
3rd Meeting of the IHO Council
Presentation transcript:

What Is Next for SiD ? H.Weerts Argonne Nat. lab.

SiD workplan revision for ILC Submitted Oct 2009 Quite a bit of detail in subsystems; not all presented in submitted document Resulted from many subsystem spreadsheets

SiD workplan submitted Resources required to execute the plan for DBD by end of 2012 In general a shortage of manpower to do this Roughly a factor 2. Presented this to IDAG yesterday Questions about: What will SiD do; are there technical limitations in R&D; what are priorities? Observations: Need to add students ( Question at IDAG yesterday).

Workplan at IDAG @LCWS10 Observations & feedback: Good progress and continued progress in R&D ( A.White talk last Thursday) Letter to RD ~month ago outlining difficulty being able to accomplish goal of DRD Presented at IDAG yesterday Concern about whether SiD can accomplish DBD by end 2012. Discussion about what goal is of DBD? What is message to be sent by DBD? Given resources available SiD needs to come up with plan for DBD by end of 2012 One item for SiD workshop June 2010

Questions from IDAG/discussion What will you do if there is not enough manpower ? Will you pick baseline solutions for subsystems by 2012? Are you technically limited to complete the R&D goals? What is the message that DBD 2012 will/should transmit? What is the interaction with CLIC? How much interaction with CLIC ? How much effort to CLIC ?

The time plan for next few years My opinion: Need to take into consideration needs of ILC and CLIC Reminder of time-line: How can we work together on SiD versions for ILC and CLIC and benefit from work on both ? SiD workshop June 2010: October 2010: ECFA LC workshop @ CERN Spring 2011: CLIC CDR due Example: push pull for CLIC use for ILC ?? End 2012: ILC DBD due

Time plan for next few years What happens to both ILC and CLIC efforts after 2012? For CLIC: what after mid 2011 ?

3-5 June 2010 At Argonne National Lab. SiD workshop June 2010 3-5 June 2010 At Argonne National Lab. http://www.hep.anl.gov/Division/SiD_Workshop.php The Workshop will focus on progress towards preparing the SiD CDR for ILC for the end of 2012 and contributions to the CLIC CDR to be completed by April 2011. In particular, the status of both directions will be presented and discussed, there will be plenty of opportunity for presenting ongoing R&D efforts, progress on PFAs, simulation of subsystems and integrated detector performance, benchmarking as well as review of plans for the next two years. Purpose: Draft outline of agenda: Morning Afternoon June 3 Status & Overviews Detailed reports/progress June 4 CLIC progress June 5 Future & outlook

Summary Discussion…..