Tilecal week (8 February 2012)

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Status of the Clermont-Ferrand R&D works Tilecal upgrade meeting at CERN (11 February 2015) François Vazeille on behalf of Clermont-Fd team ● Active Dividers:
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
ACES Workshop 3-4 March, 2009 W. Dabrowski Serial power circuitry in the ABC-Next and FE-I4 chips W. Dabrowski Faculty of Physics and Applied Computer.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
Main Board Status MB2 v1 for FATALIC & QIE 10/06/2015Roméo BONNEFOY - LPC Clermont1 Roméo BONNEFOY François Vazeille LPC Clermont-Ferrand.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
L.ROYER – TWEPP Lisbon – Sept-Oct A Dedicated Front-End ASIC for the ATLAS TileCal Upgrade L.Royer, S.Manen, N.Pillet, H.Chanal, R.Vandaële,
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
L.Royer – Calice Manchester – Sept A 12-bit cyclic ADC dedicated to the VFE electronics of Si-W Ecal Laurent ROYER, Samuel MANEN LPC Clermont-Ferrand.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
SKIROC ADC measurements and cyclic ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting Orsay June.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Calorimeter upgrade meeting – LAL /Orsay – December 17 th 2009 Low noise preamplifier Upgrade of the front end electronics of the LHCb calorimeter.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
25 juin 2010DPallin sLHC_Tile meeting1 Tilecal VFE developments at Clermont-Ferrand June 2010 Status G Bohner, J Lecoq, X Soumpholphakdy F Vazeille, D.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Status of FATALIC and its MB Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team, in.
Status of Clermont-Ferrand R&D works Tiles session in AUW François Vazeille LPC Clermont-Ferrand ● Mechanics ● External High Voltage Power Supply ● Active.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Clermont-Ferrand requests for the Test Beam Vidyo meeting, 29 July 2015 François Vazeille -Remote HV System -Front End electronics Hypothesis: Some Mini-Drawers.
Status of the Remote HV Tile Upgrade session during the AUW Wednesday, 20 April 2016 François Vazeille on behalf of the Clermont-Ferrand team  Same set-up.
Discussion on the integrator specifications with comparison of the 3 options Debriefing meeting at LPC, 28 April 2016 François Vazeille  Summary of the.
Answers to Barcelona questions about Mini-Drawers and comments Tilecal upgrade meeting CERN (24 June 2013) François Vazeille on behalf of Roméo Bonnefoy,
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
Last upgrade R&D results on the LPC works
"Drawer Mechanics - MiniDrawer"
D. Breton, S. Simion February 2012
Tile Upgrade Workshop (CERN- February 2008, 8 and 9)
Upgrade activities at Clermont-Ferrand
Calorimeter Mu2e Development electronics Front-end Review
of the High Voltage part of the on-detector electronics
CTA-LST meeting February 2015
The Silicon-on-Sapphire Technology:
Tile Upgrade Workshop (CERN- February and 9)
TileCal upgrade EVO meeting Demonstrator tesks
DCH FEE 28 chs DCH prototype FEE &
Concept of Drawers Thoughts on Drawers and mini-Drawers: Small story
T1 Electronic status Conclusions Electronics Cards:
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Mini-drawers, FE-ASIC , Integrator
R&D on the sliding comparison of standard and mini-drawers
Status of upgrade works at Clermont-Ferrand
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
HV distribution and discussion
Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009)
EUDET – LPC- Clermont VFE Electronics
First noise measurements in the FATALIC option
SiPM Readout ASIC LAPP Contribution
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
PID meeting Mechanical implementation Electronics architecture
Presented by T. Suomijärvi
Presentation transcript:

Tilecal week (8 February 2012) Status of upgrade work in Clermont-Ferrand Tilecal week (8 February 2012) François Vazeille Information on French supports Mini-drawers High Voltage system Dividers Very Front End and Front End electronics Comments and summary 1/17

Information on French supports …. knowing that without support: nothing is possible ! (The economic crisis is everywhere) 10 January 2012 (Paris): IN2P3 meeting on ATLAS upgrade  Financial support to LPC to go on. 11 January 2012 (Clermont-Ferrand): CSP (Commission Suivi de Projet)  Technical manpower at LPC to go on. 19 January 2012 (Clermont- Ferrand): LPC Scientific Council (with external members)  Conclusions not yet known but positive reactions, important for us because we have a new Director. June 2012 (Paris): IN2P3 Scientific Council  Our Tilecal upgrade activities will be part of a global Calorimetry approach. The good progresses of our R&D works will play a major role. 2/17

Mini drawers: mechanics and services Status: the concept has been validated (see previous talk: Tilecal upgrade meeting 7 October 2011)  Present activities: 2 activities in parallel Short term works Medium term works Demonstrator: adjustment of present mini-drawers Service holes for PMT blocks Position index Cooling Drilling for Mother Boards and other cards/services Routing of services Handling tool R&D studies on links and services Handling procedure Optimization of links and services Design of tooling Design of mini-drawers Request to Institutes: Information on positioning of cards/services. 3/17

High Voltage system The 6 options will be reported in the next LoI: no decision taken till now.  Present activities Short term works Demonstrator: adjustment of present mini-drawers for 175 Services for HV distribution (see previous slide) HV source to find Thought about the usefulness of ″noise killers″ 4/17

Dividers Status: the concept and the design have been validated including the test bench.  non-linearity <0.1%  Luminosity with a safety factor > 10. (see previous talk: Tilecal upgrade meeting 17 June 2011)  Present activities Short term works Medium term works Demonstrator: 20 bases made 30 bases soon available Radiation tests Before June 2012 - From Chicago: up to 45 Krad. Next contact with Philippe Farthouat about other tests. 5/17

Very Front End and Front End electronics Status: - The 2 first ASICs (FATALIC 1 and 2) have been validated. - The choice of a ″current conveyor″ is well suited behind a PMT. (many talks, the last one: Tilecal upgrade meeting 7 October 2011)  Present activities: 2 activities in parallel Very Front End Front End 2 kinds of ASICs FATLIC3 delivery: mid-March New test card: in progress Signal optimization from simulation - Peaking time. - Width. New: TACTIC (12 bits ADC) FATALIC 4 later 2 kinds of ASICs First thought about MB2 Then 3in1 depending from the status of ASICs More information in next slides 6/17

VFE FATALIC3 contains the full chain but for the ADC - Delivery by mid-March 2012. - It will be tested using a new test card in progress (best current/linearity injection) - It has already a rather large surface, so the foundry cost being proportional to the area  Decision to develop the ADC on a separated chip, then to bond it on FATALIC3 for tests, before designing FATALIC4. TACTIC (Twelve bits AdC for s-atlas Tilecal Integrated Circuit) - IBM 130 nm technology (like FATALIC). - 12bits 40MHz - ″Pipeline ADC″  best resolution and speed. - Present status: design of the amplifier in progress (the most important block in this architecture, present at every stage). - Order at the beginning of August. Parallel study of a digital approach of the ″Integrator″ - Based on the numerical sum of converted signals at 40 MHz: likely possible because of the very low noise in ASIC. - First simulations in progress, then tests in building 175. 7/17

FE First thought about Mother Board 2 and its connections with 3in1 and Daughter Board. 8/17

- Intermediate steps before going to the optimum design:  Amplifier for the analog output for trigger on the 3in1 card.  Classical ADC on MB2 waiting for TACTIC chip.  TACTIC bonded on FATALIC3, waiting for FATALIC4.  Negative (discrete?) and positive (chip)? regulators.  Connections of the Adders on MB2, etc. Needed Low Voltages of the 3in1 card not yet defined:  Very few if the ASIC is alone (1 positive only).  One more for the DAC (negative).  Additional ones in the hybrid solution to supply the amplifier/shaping requested by the analog output for the trigger. - The same exercise has to be made for the MB2 and the DB, in order to supply the MB2 itself + Adders + DB. Some information requested to Stockholm/Chicago on DB:  Pinout and connectors between the MB and DB.  Format of the data of ADC integrator and data for the DACs on DB.  List of slow control signals decoded by the DB. … 9/17

Comments and summary Towards the ″ideal″ scheme Ideal scheme 10/17

A lot of advantages with respect to the present ATLAS scheme: ATLAS PMT PMT A lot of advantages with respect to the present ATLAS scheme: Minimum of cards, connectors, cables  less failures, easy handling. - Lower power consumption. Less sensitive to radiations. Certification/tests easier. Cheaper production. - - HV Base Base 3in1 3in1 ADC Pipe-line Inte- grator Adders Inter- face Inter- face Energy Time Energy Time Physics calib. Physics calib. Trigger Trigger ATLAS Ideal 11/17

Interest of having an ASIC approach From the LoI Phase I, page 43 (LAr context, but true for every part) ″The main benefit of such an approach w.r.t. a more traditional design based on discrete components relies on it being a cost effective solution which will remove challenging integration issues in the design and layout of printed boards as well as in its power management.″ 12/17

Liquid Argon strategy with respect the trigger. (From the meeting ″ATLAS France plans for upgrade″, 10 January 2012) Saturation New digital part for Phase-I 13/17

A first constraint Ideal Hybrid PMT PMT Base Base 3in1 3in1 Energy Adders Inter- face Inter- face Energy Time Energy Time Phys. Calib. Phys. Calib. Trigger Trigger Ideal Hybrid 14/17

Hybrid PMT 2 other constraints: Amplifier in 3in1, ADC downstream, while the ASIC will be able to deliver directly a digital information. 3in1 Base ASIC Ampli 3in1 Adders Adders Inter- face Inter- face Somewhere, in order to mix to LAr fully digital on the detector ADC Energy Time Phys. calib. Trigger Trigger Hybrid 15/17

in addition to the natural steps that will go to the final ASIC: - Waiting for the availability of TACTIC  Standard ADCs on MB2. -TACTIC bonded on FATALIC3. - FATALIC4, with at a given time the suppression of the analog output. It is not obvious that this “obstacle course” is the best way to succeed ! 16/17

Summary  R&D activities are well progressing, but we should discuss why we focus only on PHASE-II, while LAr should implement a digital trigger in Phase-I. Information requested to Institutes about: - The Daughter Board. - The fixation holes of Mother Boards. Some elements will be delivered to the 3 readout solutions: - Active Dividers. - First mini-drawers and tools. - Rough approach of services (HV included). Parallel study of mini-drawers and services. Pre-tests of ASICs (FATALIC and TACTIC) will be made in building 175, independently from the true Demonstrator tests. 17/17