Jamie Shiers ~~~ WLCG MB, 19th February 2008

Slides:



Advertisements
Similar presentations
CCRC’08 Jeff Templon NIKHEF JRA1 All-Hands Meeting Amsterdam, 20 feb 2008.
Advertisements

LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
CERN IT Department CH-1211 Genève 23 Switzerland t EIS section review of recent activities Harry Renshall Andrea Sciabà IT-GS group meeting.
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
GGUS summary (7 weeks) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals 1 To calculate the totals for this slide and copy/paste the usual graph please:
CMS STEP09 C. Charlot / LLR LCG-DIR 19/06/2009. Réunion LCG-France, 19/06/2009 C.Charlot STEP09: scale tests STEP09 was: A series of tests, not an integrated.
GGUS summary ( 4 weeks ) VOUserTeamAlarmTotal ALICE ATLAS CMS LHCb Totals 1.
1 24x7 support status and plans at PIC Gonzalo Merino WLCG MB
WLCG Service Report ~~~ WLCG Management Board, 1 st September
Enabling Grids for E-sciencE System Analysis Working Group and Experiment Dashboard Julia Andreeva CERN Grid Operations Workshop – June, Stockholm.
WLCG Service Report ~~~ WLCG Management Board, 9 th August
1 LHCb on the Grid Raja Nandakumar (with contributions from Greig Cowan) ‏ GridPP21 3 rd September 2008.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
GGUS Slides for the 2012/07/24 MB Drills cover the period of 2012/06/18 (Monday) until 2012/07/12 given my holiday starting the following weekend. Remove.
CCRC’08 Planning & Requirements Jamie Shiers ~~~ LHC OPN, 10 th March 2008.
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE1102 ATLAS CMS LHCb Totals
CCRC’08 Monthly Update ~~~ WLCG Grid Deployment Board, 14 th May 2008 Are we having fun yet?
WLCG Service Report ~~~ WLCG Management Board, 7 th September 2010 Updated 8 th September
High Availability Technologies for Tier2 Services June 16 th 2006 Tim Bell CERN IT/FIO/TSI.
GGUS summary (4 weeks) VOUserTeamAlarmTotal ALICE4015 ATLAS CMS LHCb Totals
4 March 2008CCRC'08 Feb run - preliminary WLCG report 1 CCRC’08 Feb Run Preliminary WLCG Report.
WLCG Service Report ~~~ WLCG Management Board, 16 th September 2008 Minutes from daily meetings.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
WLCG Service Report ~~~ WLCG Management Board, 18 th September
Operation Issues (Initiation for the discussion) Julia Andreeva, CERN WLCG workshop, Prague, March 2009.
SRM-2 Road Map and CASTOR Certification Shaun de Witt 3/3/08.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
SRM v2.2 Production Deployment SRM v2.2 production deployment at CERN now underway. – One ‘endpoint’ per LHC experiment, plus a public one (as for CASTOR2).
8 August 2006MB Report on Status and Progress of SC4 activities 1 MB (Snapshot) Report on Status and Progress of SC4 activities A weekly report is gathered.
WLCG Service Report Jean-Philippe Baud ~~~ WLCG Management Board, 24 th August
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
GGUS summary (3 weeks) VOUserTeamAlarmTotal ALICE7029 ATLAS CMS LHCb Totals
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
GGUS summary ( 9 weeks ) VOUserTeamAlarmTotal ALICE2608 ATLAS CMS LHCb Totals
WLCG ‘Weekly’ Service Report ~~~ WLCG Management Board, 19 th August 2008.
CERN IT Department CH-1211 Geneva 23 Switzerland t Service Reliability & Critical Services January 15 th 2008.
SchoolSuccess for Coordinators
WLCG IPv6 deployment strategy
WLCG Network Discussion
1 VO User Team Alarm Total ALICE 12 ATLAS CMS
LCG Service Challenge: Planning and Milestones
WLCG Management Board, 30th September 2008
Status of the SRM 2.2 MoU extension
Cross-site problem resolution Focus on reliable file transfer service
gLite->EMI2/UMD2 transition
1 VO User Team Alarm Total ALICE ATLAS CMS
Service Challenge 3 CERN
Database Readiness Workshop Intro & Goals
1 VO User Team Alarm Total ALICE ATLAS CMS
1 VO User Team Alarm Total ALICE 1 2 ATLAS CMS 4 LHCb 20
The CREAM CE: When can the LCG-CE be replaced?
Taming the protocol zoo
Savannah to Jira Migration
WLCG Management Board, 16th July 2013
Castor services at the Tier-0
Olof Bärring LCG-LHCC Review, 22nd September 2008
WLCG Service Interventions
1 VO User Team Alarm Total ALICE ATLAS CMS
AgilizTech Support Desk Overview
Short update on the latest gLite status
Nordic ROC Organization
1 VO User Team Alarm Total ALICE 2 ATLAS CMS LHCb 14
Take the summary from the table on
Data Management cluster summary
Performing Database Recovery
The Troubleshooting theory
Dirk Duellmann ~~~ WLCG Management Board, 27th July 2010
The LHCb Computing Data Challenge DC06
Presentation transcript:

Jamie Shiers ~~~ WLCG MB, 19th February 2008 CCRC’08 W CCRC’08 Weekly Update Jamie Shiers ~~~ WLCG MB, 19th February 2008

Agenda Do not plan to repeat talk from today’s meeting with LHCC referees Focus on recommendations and key issues Scope & Timeline of the Challenge(s) Problem Tracking, Reporting & Resolution

Scope & Timeline We will not achieve sustained exports from ATLAS+CMS(+others) at nominal 2008 rates for 2 weeks by end February 2009 There are also aspects of individual experiments’ work-plans that will not fit into Feb 4-29 slot Need to continue thru March, April & beyond After all, the WLCG Computing Service is in full production mode & this is its purpose! Need to get away from mind-set of “challenge” then “relax” – its full production, all the time!

Handling Problems… Need to clarify current procedures for handling problems – some mismatch of expectations with reality e.g. no GGUS TPMs on weekends / holidays / nights… c.f. problem submitted with max. priority at 18:34 on Friday… Use of on-call services & expert call out as appropriate {alice-,atlas-}grid-alarm; {cms-,lhcb-}operator-alarm; Contacts are needed on all sides – sites, services & experiments e.g. who do we call in case of problems? Complete & open reporting in case of problems is essential! Only this way can we learn and improve! It should not require Columbo to figure out what happened… Trigger post-mortems when MoU targets not met This should be a light-weight operation that clarifies what happened and identifies what needs to be improved for the future Once again, the problem is at least partly about communication!

FTS “corrupted proxies” issue The proxy is only delegated if required The condition is lifetime < 4 hours. The delegation is performed by the glite-transfer-submit CLI. The first submit client that sees that the proxy needs to be redelegated is the one that does it - the proxy then stays on the server for ~8 hours or so Default lifetime is 12 hours. We found a race condition in the delegation - if two clients (as is likely) detect at the same time that the proxy needs to be renewed, they both try to do it and this can result in the delegation requests being mixed up - so that that what finally ends up in the DB is the certificate from one request and the key from the other. We don’t detect this and the proxy remains invalid for the next ~8 hours. The real fix requires a server side update (ongoing). The quick fix. There are two options: … [ being deployed ]

ATLAS CCRC’08 Problems 14-18 Feb There seem to have been 4 unrelated problems causing full or partial interruption to the Tier0 to Tier1 exports of ATLAS. On Thursday 14th evening the Castor CMS instance developed a problem which built up an excessive load on the server hosting the srm.cern.ch request pool. This is the SRM v1 request spool node shared between all endpoints. By 03:00 the server was at 100% cpu load. It recovered at 06:00 and processed requests till 08:10 when it stopped processing requests until 10:50. There were 2 service outings totalling 4:40 hours. S.Campana entered in the CCRC08 elog the complete failure of ATLAS exports at 10:17, in the second failure time window, and also reported the overnight failures as being from 03:30 to 05:30. This was replied to by J.Eldik at 16:50 as a 'site fixed' notification with the above explanation asking SC for confirmation from their Atlas monitoring. This was confirmed by SC in the elog at 18:30. During the early morning of 15th the operator log received several high load alarms for the server followed by a 'no contact' at 06:30. This lead to a standard ticket being opened. The server is on contract type D with importance 60. It was followed by a sysadmin at 08:30 who were able to connect via the serial console but not receive a prompt and lemon monitoring showed the high load. They requested advice on whether to reboot or not to the castor.support workflow. This was replied to at 11:16 with the diagnosis of a problem of the monitoring because of a pile-up of rfiod processes. SRM v1.1 deployment at CERN coupled the experiments – this is not the case for SRM v2.2!

ATLAS problems cont Another srm problem was observed by S.Campana around 18:30 on Friday. He observed connection timed out errors from srm.cern.ch for some files. He made an entry in the elog, submitted a ggus ticket and sent an email to castor.support hence generating a remedy ticket. ggus tickets are not followed at the weekend nor are castor.support tickets which are handled by the weekly service manager on duty during working hours. The elog is not part of the standard operations workflow. A reply to the castor ticket was made at 10:30 on Monday 18th asking if the problem was still being seen. At this time SC replied he was unable to tell as a new problem, the failure of delegated credentials to FTS, had started. An elog entry that this problem was 'site fixed' was made at 16:50 on the 18th with the information that there was a problem on a disk server (hardware) which made several thousand files unavailable till Saturday. Apparently the server failure did not trigger its removal from Castor as it should have. This was done by hand on Saturday evening by one of the team doing regular checks. The files would then have been restaged from tape. The ggus ticket also arrived at CERN on Monday. (to be followed)

ATLAS problems – end. There was a castoratlas interruption at 23.00 on Saturday 16 Feb. This triggered an SMS to a castor support member (not the piquet) who restored the service by midnight. There is an elog entry made at 16:52 on Monday. At the time there was no operator log alarm as the repair pre-empted this. For several days there have been frequent failures of FTS transfers due to corrupt delegated proxies. This has been seen at CERN and several Tier 1. It is thought to be bug that came in with a recent gLite release. This stopped ATLAS transfers on the Monday morning. The workaround is to delete the delegated proxy and its database entry. The next transfer will recreate them. This is being automated at CERN by a cron job that looks for such corrupted proxies. It is not yet clear how much this affected ATLAS during the weekend. The lemon monitoring shows that ATLAS stopped, or reduced, the load generator about midday on Sunday.

Some (Informal) Observations (HRR) The CCRC'08 elog is for internal information and problem solving but does not replace, and is not part of, existing operational procedures. Outside of normal working hours ggus and CERN remedy tickets are not looked at. Currently the procedure for ATLAS to raise critical operations issues themselves is to send an email to the list atlas-grid-alarm. This is seen by the 24 hour operator who may escalate to the sysadmin piquet who can in turn escalate to the FIO piquet. Users who can submit to this list are K.Bos, S.Campana, M.Branco and A.Nairz. It would be good for IT operations to know what to expect from ATLAS operations when something changes. This may be already in the dashboard pages. (Formal follow-up to come…)

Monitoring, Logging & Reporting Need to follow-up on: Accurate & meaningful presentation of status of experiments’ productions wrt stated goals “Critical Services” – need input from the experiments on “check-lists” for these services, as well as additional tests MoU targets – what can we realistically measure & achieve? The various views that are required need to be taken into account e.g. sites, depending on VOs supported, overall service coordination, production managers, project management & oversite March / April F2Fs plus collaboration workshop, review during June CCRC’08 “post-mortem”

Supporting the Experiments Need to focus our activities so that we support the experiments in as efficient & systematic manner as possible Where should we focus this effort to have maximum effect? What “best practices” and opportunities for “cross fertilization” can we find? The bottom line: it is in everybody’s interest that the services run as smoothly and reliably as possible and that the experiments maximize the scientific potential of the LHC and their detectors… Steady, systematic improvements with clear monitoring, logging & reporting against “SMART” metrics seems to be the best approach to achieving these goals

Draft List of SRM v2.2 Issues Priorities to be discussed & agreed: Protecting spaces from (mis-)usage by generic users Concerns dCache, CASTOR Tokens for PrepareToGet/BringOnline/srmCopy (input) Concerns dCache, DPM, StoRM Implementations fully VOMS-aware Correct implementation of GetSpaceMetaData Correct size to be returned at least for T1D1 Selecting tape sets Concerns dCache, CASTOR, StoRM by means of tokens, directory paths, ?? Feedback by Friday 22nd February!

Service Summary From a service point of view, things are running reasonably smoothly and progressing (reasonably) well There are issues that need to be followed up (e.g. post-mortems in case of “MoU-scale” problems, problem tracking in general…) but these are both relatively few and reasonably well understood But we need to hit all aspects of the service as hard as is required for 2008 production to ensure that it can handle the load! And resolve any problems that this reveals…