CTF3 kicker activities at CIEMAT

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Progress of the BEPCII Injection System Kang Wen.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Different mechanisms and scenarios for the local RF
F Specifications for the dark current kicker for the NML test facility at Fermilab S. Nagaitsev, M. Church, P. Piot, C.Y. Tan, J. Steimel Fermilab May.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
R&D ON STRIPLINES FOR THE CLIC DR KICKERS C. Belver-Aguilar (IFIC) Acknowledgements: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M. Barnes (CERN) ICFA Beam.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
INVESTIGATING THE FEASIBILITY OF A TRAVELLING-WAVE CHOPPER FOR THE CLEAN SEPARATION OF 10 MHZ BUNCHES - AT HIE-ISOLDE Abhisek Mukhopadhyay.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
1.3GHz Input Coupler for ILC
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Main activities and news from the Impedance working group.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
August 21st 2013 BE-ABP Bérengère Lüthi – Summer Student 2013
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
DA  NE KICKERS David Alesini (LNF, INFN Frascati) 4th Low Emittance Rings Workshop INFN-LNF September 2014.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
LCWS11 WG4 Fully featured accelerating structure engineering design
EUROTeV Diagnostics WP5
High Bandwidth Damper System: kicker impedance
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Phase Feed-Forward Piotr Skowroński (CERN)
CTF3: KICKERS & PULSERS AT CERN
High efficiency work and MBK development for accelerators
LINAC4 ADVISORY COMMITTEE
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Hua Shi, Jinhui Chen, Lei Wang, Na Wang, Lihua Huo, Peng Liu, Yan Li
CTF3 Collaboration Technical Meeting
KNU IP-BPM and Reference cavity
F.Marcellini, D.Alesini, A.Ghigo
CEPC injector high field S-band accelerating structure design and R&D
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update of CLIC accelerating structure design
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Beam Injection and Extraction Scheme
Damping Ring Kicker Tests at AØ
TCTP the CST side F. Caspers, H. Day, A. Grudiev, E. Metral, B. Salvant Acknowledgments: R. Assmann, A. Dallocchio, L. Gentini, C. Zannini Impedance Meeting.
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Advanced Research Electron Accelerator Laboratory
Status of the EM simulations and modeling of ferrite loaded kickers
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
EM Simulation of wakes in BSRT beampipe with extraction mirror
Presentation transcript:

CTF3 kicker activities at CIEMAT CERN, January 22, 2008 CTF3 kicker activities at CIEMAT I. Rodríguez, L. García-Tabarés, E. Rodríguez, F. Toral - CIEMAT D. Alesini, F. Marcellini, A. Ghigo, M. Zobov – INFN M. Barnes, T. Fowler, I. Syratchev - CERN

CTF3 Kicker Status Brief summary of last collaboration meeting CERN, January 22, 2008 CTF3 Kicker Status Brief summary of last collaboration meeting Last modifications Kicker tests at Frascati (June 07) Wakefields simulation New project: The Tail Clippers Conclusions

CTF3 Kicker Status Conclusions of last year’s collaboration meeting: CERN, January 22, 2008 CTF3 Kicker Status Conclusions of last year’s collaboration meeting: Kicker already built and waiting for EM tests in Frascati: They were done on June 2007. Some minor modifications to the design could be made to improve stand-off bindings: They were implemented in the new design. About power supply, the engineering and development will continue as scheduled: See Mike Barnes presentation.

CTF3 Kicker Status Last modifications: Stand-offs (I) CERN, January 22, 2008 CTF3 Kicker Status Last modifications: Stand-offs (I) Stand-off supports modified to improve stiffness and steatite reliability. Steatite now supported by an interference fit case screwed to a cap which is welded to the kicker tube. New design Old design

CTF3 Kicker Status Last modifications: Stand-offs (II) CERN, January 22, 2008 CTF3 Kicker Status Last modifications: Stand-offs (II) Sliding supports also modified with the same method. 5 supports per strip Copper washer inserted between steatite and steel to reduce friction. New design Old design Washer

CTF3 Kicker Status Last modifications: Stand-offs (III) CERN, January 22, 2008 CTF3 Kicker Status Last modifications: Stand-offs (III)

CTF3 Kicker Status Last modifications: Structural supports CERN, January 22, 2008 CTF3 Kicker Status Last modifications: Structural supports Two flat supports added to fix three male centering pieces. Precision machining. Distance to beam axis: 132±0.1 mm

CTF3 Kicker Status Last modifications: Alignment targets CERN, January 22, 2008 CTF3 Kicker Status Last modifications: Alignment targets Two flat surfaces added to place targets and a level, raised 274±0.1 mm over beam axis.

CTF3 Kicker Status Last modifications: New transitions CERN, January 22, 2008 CTF3 Kicker Status Last modifications: New transitions New design needed for the transitions due to space requirements. One conical 561 mm long, other racetrack 106 mm long. New designs Old design CNC used for the smooth transition

CTF3 Kicker Status Last modifications: Final assembly CERN, January 22, 2008 CTF3 Kicker Status Last modifications: Final assembly

CTF3 Kicker Status Kicker tests at Frascati: Vacuum test CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: Vacuum test Simple turbo pump and no bake-out. Pumping from one of the old conical transitions. New transitions design was not yet implemented. 2x10-7 mbar achieved in the third day. Leak rate about 1.2x10-10 mbar.l/s (test done in manufacturer’s lab)

CTF3 Kicker Status Kicker tests at Frascati: Pulser test (I) CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: Pulser test (I) 16 kV, 5 ns pulser used for tests, kicker loaded with 50 Ohm load.

CTF3 Kicker Status Kicker tests at Frascati: Pulser test (II) CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: Pulser test (II) Good transmission of the signal, even when kicker is designed for 40 times slower pulses (200 ns). Only very high frequencies are filtered (above 1GHz)

CTF3 Kicker Status Kicker tests at Frascati: DC voltage test CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: DC voltage test Each kicker plate tested up to 18 kV DC voltage (no current). No major problems were found in both striplines, only few sparks at the beginning of the test.

CTF3 Kicker Status Kicker tests at Frascati: RF test (I) CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: RF test (I) Hybrids used to split and de-phase the network analyzer signal. 0.2 to 35 MHz for low frequency tests, 2 to 2000 MHz for high freq. test.

CTF3 Kicker Status Kicker tests at Frascati: RF test (II) CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: RF test (II) Low frequency testing (200 ns pulse frequencies content up to 35 MHz). Almost no reflection < 0.2% in power Good transmission

CTF3 Kicker Status Kicker tests at Frascati: RF test (III) CERN, January 22, 2008 CTF3 Kicker Status Kicker tests at Frascati: RF test (III) High frequency testing (up to 1 GHz). Results agree HFSS ones presented in last year’s meeting.

CTF3 Kicker Status Wakefields simulation (I) CERN, January 22, 2008 In Combiner Ring: 4 turns before kick. Wakefield effects expected not to be dangerous. Low Q stainless steel structure: fast decay of induced fields. Simulations done in ABCI, GDFidl and CST Particle Studio with old conical transitions. Coaxial ports absorb the wakefields for the coupled frequencies (simulated first coaxial modes up to 100th).

CTF3 Kicker Status Wakefields simulation (II) CERN, January 22, 2008 Difficult simulation due to long structure vs short bunch (sigma = 3mm). Enormous memory requirements. Several models developed, to simulate input, output and full kicker.

CTF3 Kicker Status Wakefields simulation (III) CERN, January 22, 2008 Wakepotential plot (up to 13 m) shows that first reflected wave is almost totally absorbed by the coaxials (ideally connected). 2 L 2 L

CTF3 Kicker Status Wakefields simulation (IV) CERN, January 22, 2008 New last simulation with final transitions in GDFidl at CERN (thanks to Igor Syratchev). Simulation problems even harder than the old design ones: New structure much longer Different input and output transitions: Slower integration method for transverse wake calculation. Transverse wakes calculated in a plane normal to the kicking one.

CTF3 Kicker Status Wakefields simulation (V) CERN, January 22, 2008 Results also discussed with R. Corsini. No major problems expected at beam frequency (3 GHz)

Stainless steel or Antico CERN, January 22, 2008 CTF3 Kicker Status New Project: The Tail Clippers (I) Beam energy 200 MeV Total kick deflection angle 1,2 mrad Deflection plane vertical Stripline plate separation 40 mm Field homogeneity ±20 % Characteristic impedance 50 ±1 Ohms Pulse duration (maximum) ns Maximum field rise-time (0.25 to 99.75%) 5 Maximum timing jitter 1 Pulse repetition rate – nominal/maximum 5 / 50 Hz Number of stripline sections 4 Stripline section length (between centre's of feedthroughs) (333) Total available straight section length 1625 Vacuum tank material Stainless steel or Antico Electrode material Flange material Pumping ports none Supports and Alignment system as per CR kicker

CTF3 Kicker Status New Project: The Tail Clippers (II) CERN, January 22, 2008 CTF3 Kicker Status New Project: The Tail Clippers (II) Several straight sections analyzed, trying to decrease chamber diameter but not disturbing the homogeneity too much. Wakefields behaviour improvement using reduced chamber. Higher center field using curved electrodes for a given aperture Flat electrodes Elliptical electrodes Circular electrodes ±19% Ø 66 mm ±10% Ø 78 mm ±15% Ø 71 mm

CTF3 Kicker Status New Project: The Tail Clippers (III) CERN, January 22, 2008 CTF3 Kicker Status New Project: The Tail Clippers (III) Smooth transitions from coaxial to strip-line. Tapered electrodes preserving 50 Ohm characteristic impedance.

CTF3 Kicker Status New Project: The Tail Clippers (IV) CERN, January 22, 2008 CTF3 Kicker Status New Project: The Tail Clippers (IV) Good transmission of power even at higher frequencies (needed for 5ns rise time pulse). S11<0.02 from 0 to 200 MHz

CTF3 Kicker Status New Project: The Tail Clippers (V) CERN, January 22, 2008 CTF3 Kicker Status New Project: The Tail Clippers (V) Cross-talk between adjacent strip-lines studied. Very small power coupling at small distance (55 mm) in the full frequency range.

CTF3 Kicker Status New Project: The Tail Clippers (VI) CERN, January 22, 2008 CTF3 Kicker Status New Project: The Tail Clippers (VI) Preliminary 3D model (full assembly).

CTF3 Kicker Status Conclusions CERN, January 22, 2008 The kicker is now finished and fully analyzed. It has arrived at CERN and it will be installed soon. No major problems are expected after the wakefield analysis. All the know-how acquired with the strip-line kicker is being applied to the tail clipper project. The tail clipper main parameters are already defined and final design could soon be available. Fabrication could be finished for end of 2008.