Site Audit Scenario & Antenna Adjustment

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

An ISO 9001 certified We offer our services to a wide range of networks such as GSM, CDMA and UMTS networks We Sells SPY Cams & security Cameras We have.
1 Aligning and Peaking. 2 Introduction In this section we will use a signal level meter to align and peak a single-satellite ODU and a multiple-satellite.
Land Navigation Module 2 Using a Lensatic Compass.
Radio Network Tuning and Optimization for Universal
CDR Analysis & Investigation Basic Course - Presentation
Numbers
To the Rescue…. Solutions Powered by Are you Ready? …. What happens when there is, NO cellular service NO radio service NO terrestrial services.
ATA - 42 Antenna & Zone Cost Summary Matt Fleming Part B of a two part presentation Part A Antenna & Zone Design Summary Part B Antenna & Zone.
PowerPoint ® Presentation Chapter 3 Site Surveys and Preplanning Preliminary Assessment Safety Site Surveys Preparing Proposals Installation Planning.
Powered By G-2, Plot No. 29, Marudhar Vihar, Near Reliance Fresh, Khatipura Circle, Jaipur , Rajasthan, India Mobile No: ,
Antenna Design Tools VE3KL
April, 2002Energy Audits1 Heating Degree Days The difference between the base temperature (balance point) and the mean ambient temperature for the day.
Control Office Site A Site B Site C Site D Site E.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Finding Your Way— Maps, Compass and GPS Eagle Vision 2005.
1 Rover setting for Network RTK (GSM) Trimble 5700.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Test 1: Co-channel interference at the mobile unit
If I was the Government of India, what is the one thing that I would do to make the nation energy efficient? Suggest one way in which Government of India.
Red Rocks Community College ENY 130 Fall 2009 Module 3: Solar Resource.
SAFETY FIRST LAST & ALWAYS Core Safety Values. Mechanical Lifting/Suspended Loads I will never place myself or others under a suspended load.
COMMUNICATION INFOTECH. MICROWAVE INSTALLATION Check on the power outlet box before beginning the installation to insure that outlet box is properly grounded.
Scenario 1 Predict what will happen to mean, median & mode when Yao Ming's (a NBA star basketball player) height 229 cm was included into the data? Mean.
Puerto Rico Deployable Radar Network Design; Site Survey Sponsored by: NASA- TCESS-FAR J. M. Trabal (1), J. G. Colom (1), S. L. Cruz-Pol (1), S. M. Sekelsky.
1 ODU Assembly. 2 Introduction This section instructs you on how to assemble both single- and multiple- satellite ODUs.
10-1 人生与责任 淮安工业园区实验学校 连芳芳 “ 自我介绍 ” “ 自我介绍 ” 儿童时期的我.
Field Methods 2 When a GPS only won’t do: –Forestry canopies –Canyons (no reception or can’t reach) –Underwater –Small areas when you don’t have a sub-
Summary of SLS for RRM NTT DOCOMO
Documentation.
Site Audit Scenario & Antenna Adjustment
Lift up antenna at least 40ft height above the ground.
PIPE SPOOL WELDING SYTEM – LIGHT VERSION
Small Engine Tool ID Part 1.
Single Site Acceptance Report for TIGO UMTS Project Phase II
Training: Wireless Site Surveys
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
Site Audit Scenario & Antenna Adjustment
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Site Audit Scenario & Antenna Adjustment
CLUSTER CILEDUK CIPONDOH 1A
SSA Improvement LTE Central Java.
Yahoo Mail Customer Support Number
TECHjOSH.COM TechJosh.com.
Most Effective Techniques to Park your Manual Transmission Car
How do Power Car Windows Ensure Occupants Safety
NMSU SHOT II WORKSHOP Klipsch School of Electrical and Computer Engineering & Mechanical Engineering Department Jeremy Bruggemann Michelle Chavez Trevenor.
Towers and Antennas Tim Jellison W3YQ/KL7WV
ADINA INSTITUTE OF SCIENCE AND TECHNOLOGY
برنامه‌ريزي منابع انساني
Solarize Your School.
Fix Garmin GPS Map Update Error
What everyone should Know about map Contents!
Do not work at height without fall protection
How to Process an Interactive GPS Report Training Presentation
THANK YOU!.
SciQuest Update Purchasing and Distribution Services FAR
Thank you.
Thank you.
Ants use the panoramic skyline as a visual cue during navigation
Advisors: Dr. Katz and Dr. Chang
PIPE SPOOL WLEDING SYTEM – HEAVY VERSION
Engine Part ID Part 2.
BIRDS-4 Computer Aided Drawing (CAD)
Unloading and handling of MEBT
AI Networks Analysis. APs Coverage Pattern Detail for SGH APs Height (m)Device TypeAzimuth 50mRocket-M5 AP mRocket-M5 AP380 50mRocket-M5 AP4120.
Presentation transcript:

Site Audit Scenario & Antenna Adjustment ERICSSON - 4G_LTE_XL ______________________________________________ Site Id : ------- Site Name : LTE_Panggung_Tegal Auditor / Rigger Name : Abdul Jabar patra Last Update : 24 November 2015 Site Audit Scenario & Antenna Adjustment

Site Audit Scenario -Antenna Physical Configuration Audit: Site Location Feeder isolation/tapping foto Antenna Height Antenna Type Antenna Orientation Antenna Location Mechanical Tilt Electrical Tilt -Tools and Equipment: Tilt meter, Camera, Altimeter, GPS, Compass - Views: Panoramic Views every 30 degrees

Site Name : LTE_Panggung_Tegal Long / Lat : 109.13913 / 06.86679 Site Id : ------- Site Name : LTE_Panggung_Tegal Long / Lat : 109.13913 / 06.86679 site id site name sec id Antenna hight Building High Type antenna Ant Direction Mec Tilt Elc tilt Before After - LTE_Panggung_Tegal 1 19m 7m Tongyu TTB- 50 2 190 180 3 330

Site Name & GPS

Tower & Antenna & Building High

Panoramic View 0 – 90 30 60 90

Panoramic View 120 - 210 120 150 210 180

Panoramic View 120 - 210 240 270 300 330

Antenna Type Sec1 Sec2 Sec3

Antenna View & Azimuth Before Sec1 Sec2 Sec3 50 190 330

Antenna View & Azimuth After Sec1 Sec2 Sec3 50 180 330

Mechanical Tilt Before Sec1 = 0 Sec2 = 0 Sec3 = 1

Mechanical Tilt After Sec1 = 0 Sec2 = 0 Sec3 = 1

Electrical Tilt Before Sec2 = 2 Sec3 = 2 Sec1 = 2

Electrical Tilt After Sec2 = 2 Sec3 = 2 Sec1 = 2

THANKS