Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
B. Todd et al. 25 th August 2009 Observations Since v1.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Session 8: What we will do for beam preparation in 2009 G. Arduini, R. Giachino 1Session 8 – Summary - GA24/02/2009.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Agenda Reorganisation MARS Offices Staff, fellows and students
V4.
0v1.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
Beam Interlock System SPS CIBU Connection Review
DRY RUNS 2015 Status and program of the Dry Runs in 2015
R. Denz, A. Gomez Alonso, AT-MEL-PM
Dependability Requirements of the LBDS and their Design Implications
SCADA Application Service updates in TS1
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Acknowledgements: H.Milcent, R.Denz, R.Schmidt, M.Zerlauth
TE-MPE LS1 review Vision from EN-EL(CF)
LINAC4 50 MeV phase BIS STATUS
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Looking back on 2014 and Perspectives for the MPE Group in 2015
EC Activities Status for the LIU
Jan Uythoven For discussion
M.Jonker CTC MPO-WG status
TE-ABT PLC and SCADA usage
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
1v0.
MPE main activities planned for LS2
eLTC - Controls Summary
Commissioning and Testing the LHC Beam Interlock System
TE-MSC activities in SPS during YETS
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
GIS Portal Racks Project
V.Chareyre/H.Thiesen/I.Romera/M.Zerlauth
MPSC Procedures An update
Remote setting of LHC BLM thresholds?
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
M. Zerlauth, I. Romera 0v1.
Machine Protection System Commissioning plans
1v1.
Will We Ever Get The Green Light For Beam Operation?
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
Operation of Target Safety System (TSS)
Wednesday 23/2 Thanks CRYO!!!.
Review of hardware commissioning
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Close-out.
Presentation transcript:

J. Uythoven for the MPE-MI & MS Teams LHC works YETS & LS2 MPE Machine Interlocks and MP Software Coordination meeting 26/09/2017 J. Uythoven for the MPE-MI & MS Teams

Power Interlock Controller (PIC) No electrical lock-out required Description YETS LS2 Comment Protection of 11 T trim circuit, new PIC functionality X Needed before powering. Spec in preparation. General maintenance and follow-up if needed, all systems Check of INFOR EAM database relative to operational devices Access needed WINCC OA maintenance (BE-ICS) PLC Step7 conversion to TIA Portal Project (BE-ICS) Re-engineering of PLC algorithm (TE-MPE & BE ICS) LHC Coordination Meeting, 26/09/2017 MPE-MI, Jan Uythoven

Fast Magnet Current Change Monitor (FMCM) No electrical lock-out needed Description YETS LS2 Comment General maintenance and follow-up if needed, all systems X Check of INFOR EAM database relative to operational devices Exchange of LHC-FMCM in points 3&7 with new series Operational tests needed Exchange of LHC-FMCM in points 1, 2,5 and 6 with new series LHC Coordination Meeting, 26/09/2017 MPE-MI, Jan Uythoven

Beam Interlock System (BIS) No electrical lock-out Description YETS LS2 Comment CIBDS local loop connector replacement (new CIBDS) X Point 6 SFP optical power calibration All IPs Add TSU in the SFP loop New TDE connections in IP6 Re-commissioning all non-conform CIBUs Two new MKB connections in point 6 Increse number of user connections BICs UA63 and UA67 Deploy and test BIS 1.23 if required Install BIS v2 for testing None of the above requires many days per intervention LHC Coordination Meeting, 26/09/2017 MPE-MI, Jan Uythoven

Safe Machine Parameters (SMP) No electrical lock-out Description YETS LS2 Comment Implementation of a test mode on the Arbiter of LHC-SMP X LHC Coordination Meeting, 26/09/2017 MPE-MI, Jan Uythoven

Warm Magnet Interlock Controller (WIC) Description YETS LS2 Comment BBCW wire collimator IP1, interlocking X IP3 and IP7, WIC update following removal of magnets and interlock LHC Coordination Meeting, 26/09/2017 MPE-MI, Jan Uythoven

MPE – MP Software, main points YETS 2017/2018: Maintenance work on the LHC Post Mortem System to address recent performance issues. The most likely solution will be to unload the server by migrating historic data to a different physical machine (while maintaining it accessible for the analysis tools). This has to be done ahead of the start of HWC, i.e. before the end of January. Validation will be done by doing dry Post Mortem dumps. LS2: New version of PM system replacing the current infrastructure. Possibly this will be joined with the NXCLAS (new Logging system).  The system has to be ready by mid-end 2019 to allow people to efficiently migrate to the new infrastructure and avoid any delay in the start of IST and commissioning activities.  New version of software layer for LHC quench detection. The system has to be ready by mid-end 2019 to allow Reiner and Co to do an early validation of the DYPQ upgrades and prepare the IST tests. Massive migration of FESA classes for BIS, SMP, FMCM,.. to comply with the eradication of FESA 2 announced by CO. Again to be ready for all IST and commissioning tests of the respective equipment. LHC Coordination Meeting, 26/09/2017 MPE-MI, Jan Uythoven