EN-HE SPS works during EYETS

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
20 th SPS Upgrade Study Team meeting – 18 th November 2008 – J.Bauche, - AT/MCS/MNC 1.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
SPS Dump relocation Radioactive Dump storage alternatives JL GRENARD EN-HE
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Magnet activities in SPS during EYETS
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
YETS & LS2 Works EN-EL / Power distribution
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
Framework Schedule from EYETS 2016 to LS2
SPS LS1 Planning meeting (N019) 04/09/13
Update on the Critical Path of the PS Booster Schedule for the EYETS
SPS Winter stop Planning meeting (N06) 05/01/2011
EYETS Works EN-EL [ FC excluded ]
IT-4189 Supply and installation of a cryogenic distribution system
YETS & LS2 Works EN-El on LHC / Power distribution
EN-Handling Engineering Group
TE-MSC activities in SPS during LS2
BA6 – crab cavity activities in EYETS
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
K. Foraz on behalf of OSS members
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
EN-EL-FC Activity Jeremy Blanc, EN-EL-FC.
EN-HE Group meeting 4th December 2015
EN/HE activities for LIU
Crab Cavities Activities
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
Renovation of the 45-year old PS magnets
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS activities during LS2 TE-EPC (Power Converter Group)
EN-HE L2 – PS – PSB – TT2 works during YETS
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
TE-MSC activities in SPS during YETS
IT-4328: Technical Specification
UK RFD Pre-Series cryomodule
East Hall under construction
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 09/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 23/01/2019.
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
SPS Planning meeting for LS2 #18 Vacuum sectors situation
SPS Planning meeting for LS2 #16 Vacuum sectors situation
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
EN-HE SPS during LS2 J-L GRENARD on behalf of EN-HE 23/1/2019.
SPS Planning meeting for LS2 #25 Vacuum sectors status
SPS 2, 3, 4 and 6 during W D.MCFARLANE EN-ACE-OSS 12/06/2019.
SPS Planning meeting for LS2 #26 Vacuum sectors status
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

EN-HE SPS works during EYETS 2016-2017 JL GRENARD on behalf of EN-HE 12/10/2016

EN-HE Works Dismountling of the old lifting hoist behind the lift at BA6 Installation of a new hoist for the installation of a lifting hoist for the handling of the cryo box Installation of 2 rails for the handling of the Crab cavity

EN-HE Works Refurbishment & Replacement works Preventive Maintenance PR-567 (ECX5) PA-481 (TA6) PA-390 (BA6) New hoist (BA3) Preventive Maintenance Preventive maintenance of the overhead cranes and hoists

PR-567 refurbishment (ECX-5) Intervention includes the replacement of the hoist trolley and all the electrical equipment Upgraded features for handling of radioactive objects (cameras, redundancies etc) Control desk and electrical switchboard located in ECA5 for remote operations Works scheduled from Dec. 15th to Feb. 27th Half of the shielding wall between ECA5 and ECX5 foreseen for transfer of materials and equipment ECA5 ECX5 Shielding wall Control equipment

Replacement of PA-481 (TA6) + handling rails for Crab cavities Working area Dismantling of the existing hoist and support beams (15 Dec. – 16 Dec.) & (19 Dec. – 21 Dec.) Installation of the new 4t hoist and support rail (19Dec. – 21Dec.) & (9Jan. – 10Jan.) Installation of 2 rails for the handling of the Crab cavity Equipment to be dismantled

Commissioning of PA-390 (BA6) & Assembly of new hoist at (BA3) Works foreseen in the 2nd week of EYETS. 2 to 3 days of work No possibility to access the zone or to use the lift BA3 Working areas BA6

Preventive Maintenance (cranes and hoists)

Preventive Maintenance (lifts) Will be planned in the coming weeks

Refurbishment of BA2 monte charge

Handling operations tunnel Magnet exchange ~15 (position and exact number know at last minute; as every shutdown) And plenty of transport and handling support for the various groups (cabling campaigns, CV maintenance, survey…)

Handling operations LSS 1 Replacement of TIDVG 1 Replacement of MKP04

Handling operations LSS 2 4 RF dampers transport and handling

Handling operations LSS 4 Replacment of 1 (2) MKE Replacment of 6 MSE

Handling operations Arc 4-5 Ac coating magnets transport Removal of 2 QD Removal of 10 SSS QD

Handling operations LSS 5 Opening of half of the wall between ECA5 and ECX5 -> storage in the BB5 Handling of the various worksite of Pt5 (crane revamping, civil engineering) Scaffolding transport for the various work site of LSS5 Transport of the skips for the removal of de-cabling campaign

Handling operations LSS 6 Transport and pre installation of Cryoline for Crab cavities project

Manpower 3 teams of 3 peoples for the overall SPS (1 dedicated for Pt5 activities, 2 for the rest of the tunnel)

Transport request Don’ wait the last minute for making your transport and handling request Especially with TREC

Contacts Handling operations supervision Crane maintenance Patrick Vallet 163868 (Franck Daclin 164681) Crane maintenance Helder Lourenco 166012 (Gilles Roche 164084) Lift maintenance Nicolas Perez 169285 (Damien Lafarge 168786)

Impacts For our activities -> to be created For handling operations -> please add us as supervisor e-groups: - en-dep-he-hh - S172-Transport-ALTEAD

Any questions or comments?