CHIGO CMV VRF Selection Software 采用midea通用PPT模版,参考《公司简介》PPT
Contents 01 - Software Start Interface 02 - Drawing Directly 03 - Drawing according to Load and Selection
01 - Software Start Interface
Software Start Interface 1 3 2 6 4 5
Software Start Interface Project information interface Load calculation Indoor unit and outdoor unit selection Draw the piping Controllers selection Selection results
1 3 2 6 4 5 Software Start Interface Help files Exit software Help files 2 Exit software Next step 6 Last step 4 Choose a language System management Piping & distributors calculation 5 Save as a new file Save project Open a project Create a new project
Software Start Interface Before use the software, please choose your language by clicking the Language button.
2 Software Start Interface Project name Country Project address City Job title
3 Software Start Interface Atmosphere pressure Outdoor air velocity Longitude Latitude
4 Software Start Interface Outdoor designing Temperature Indoor designing Temperature
Software Start Interface 5 Temperature unit switcher
5 Software Start Interface Drawing according to load and selection Drawing directly
Software Start Interface Two selection methods: Drawing according to load and selection. Drawing directly. If VRF system drawings is already in hand, you can select “Drawing Directly” to make the selection more quickly. If you have only architectural drawings, then you have to select “Drawing according to Load and Selection” to calculate the cooling load first and then do the selection. Drawing Directly method is selected. Drawing according to Load and Selection is selection
02 - Drawing Directly
Drawing Directly 01 - Select Drawing Directly then click Next button to continue. 02 - Input a new system name. For example: System1, System2…
Drawing Directly 03 - Place the distributors and indoor unit as per A/C drawings. Drag the distributor joint into this small black dot frame according to drawings.
Drawing Directly 03 - Place the distributors and indoor unit as per A/C drawings. Drag the indoor units into this small black dot frame according to drawings.
Input pipe length & unit’s height Drawing Directly 04 - Indoor unit selection Select a type Select a capacity Input pipe length & unit’s height Input a name
Drawing Directly 03 - Right click on the indoor unit or press Ctrl + C to copy.
Drawing Directly 03 - Right click on the frame or press Ctrl + V to paste.
Drawing Directly 05 - Double click on the pipe line to modify the pipe length. Input the pipe length according to VRF plan Leave them blank, software will calculate their size
Drawing Directly 06 - Place outdoor unit as per A/C drawings. Double click on the first distributor to see the total capacity of all indoor units.
Drawing Directly 06 - Place outdoor unit as per A/C drawings. Double click on this frame to select the outdoor unit after selected all the indoor units.
Input outdoor unit’s height Drawing Directly 07 - Select the outdoor unit as per A/C drawings. Select a capacity Input outdoor unit’s height
Drawing Directly 08 - Finalize the selection. Click the “calculate” button to finalize the selection, software will calculate the pipes size and branch joints size automatically.
Drawing Directly 09 - After calculation.
Drawing Directly 10 - See more information. Click the “more” button to find more details of selection.
Drawing Directly 11 - Pipe length warnings 12 - Unit height warnings
Drawing Directly 13 - Click Next button to final step: Selection report. Click below button to get quotation sheet (excel file) or selection report (word file).
03 - Drawing according to load and selection.
Drawing according to load and selection 01 - Select Drawing according to load and selection then click Next button to continue.
Drawing according to load and selection 02 - Load calculation 3, Input room data 2, Select the load input method 1, Click here to create a new floor and new room
Right click here to setup a new room or a new floor Drawing according to load and selection 02 - Load calculation Right click here to setup a new room or a new floor
Input the cooling load directly Drawing according to load and selection 02 - Load calculation Input the cooling load directly
Input the room’s area and estimated load index Drawing according to load and selection 02 - Load calculation Input the room name Input the room’s area and estimated load index Cooling load
Drawing according to load and selection 03 - Click Next button to next step: Indoor unit selection.
Input indoor unit's quantity Drawing according to load and selection 03 - Click Next button to next step: Indoor unit selection. Input indoor unit's quantity
Drawing according to load and selection 03 - Click Next button to next step: Indoor unit selection.
Drawing according to load and selection 04 - After selection.
Click here to input system name Drawing according to load and selection 05 - Click Next button to next step: System partition (According to VRF plan drawing). Click here to input system name
Drawing according to load and selection 05 - System partition finished.
Drawing according to load and selection 06 - Click Next button to next step: Outdoor unit selection. Select a system
Drawing according to load and selection 06 - Outdoor unit selection. Select a model
Drawing according to load and selection 07 - Click Next button to next step: Outdoor unit selection. Drag the branch joint and indoor units into this small red frame according to drawings.
Drawing according to load and selection 08 - The rest step are same as Drawing Directly.
Thank You!