Production & QA of BOL chambers

Slides:



Advertisements
Similar presentations
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube placing + Gluing + test Summary: Status & Plans The.
Advertisements

MDI alignment progress The pre-alignment of the QD0’s Niels van Bakel, Bram Bouwens, Hubert Gerwig, Lau Gatignon, Harry van der Graaf, Henk Groenstege,
BML chamber assembly Maria Curatolo LNF/INFN. Maria Curatolo L.N.F. / I.N.F.N. Frascati 21/7/2000ATLAS - MDT Site Review Granite Table Granite table (on.
Projective platforms gluing for ATLAS chambers J.-Ch. Barrière, V. Gautard, P. Ponsot, Y. Reinert, Ph. Schune for the Saclay muon hardware group CEA Saclay.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Drift tube wiring Chamber assembly X-ray scan of BOL-0 at CERN Status and Plans The Making of ATLAS Muon.
Status Update on Mechanical Prototype in Rome November 6,
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
D. Peterson, Muon Spectrometers at ATLAS and CMS, presentation to LEPP 19-Nov  spectrometers at ATLAS and CMS Our charge: Survivability Resolution.
1 Module and stave interconnect Rev. sept. 29/08.
Marcel Vreeswijk (NIKHEF) The Assembly of ATLAS Muon 2m 5m5m NIKHEF Muon Mission: 96 Barrel Outer Large (BOL) chambers Tube Production.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Platform positioning during MDT construction Tool for the platform positioning Ph. Schune J.-Ch. Barrière P RAXIAL A LIGNMENT S YSTEM (barrel) positioning.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Federal Aviation Administration 0 Composite Wing Tank Flammability April 2-3, Composite and Aluminum Wing Tank Flammability Comparison Testing Steve.
Gas Studies with H8 Water Contamination and Series Effect Flow rate effects Changes in CO2 percentage Air Contamination (2001 measurements)
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Simulating the Effects of Wire Sag in ATLAS’s Monitored Drift Tubes Ashley Thrall, Vassar College ‘04 Dan Levin, Mentor REU Presentations August 5, 2004.
BOS Testbeam Results in 2001 MPI & LMU, Munich 1. Drift time spectra 2. RT-relation 3. Resolution - HV & threshold dependance -Comparison with the 1999.
Marcel Vreeswijk (NIKHEF) AGENDA Xray tomograph -BOL0 results (Martin) BOL0 and BOL2 Features (Graziano) Discussion (All) Features and Mysteries of BOL.
BARREL ALIGNMENT PLATFORM POSITIONING Goal: Positioning of the platforms at their nominal position on the MDT chambers (No position measurement in a database).
Marcel Vreeswijk (NIKHEF) Assembly Station - general Introduction Tube Production Tube placing Gluing + test Summary: Status.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Muon-raying the ATLAS Detector
Run13 MUID Hit Efficiency RIKEN/RBRC Itaru Nakagawa 1.
M. Bianco On behalf of the ATLAS Collaboration
Marcel Vreeswijk (NIKHEF) Introduction The NIKHEF production Three Production Schemes –MPI NOW –MPI FUTURE –NIKHEF CLAMPS Conclusions Appended: photographs.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Analyzing Praxial Platform Positions on MDT Barrel Chambers Using X-Ray Tomograph Measurements Chris Hayward Advisor: Silvia Schuh August 14, 2003 UM CERN.
Precision Drift Chambers for the ATLAS Muon Spectrometer
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
2007 Oct 21 GEM Panel for LP1 Akimasa Ishikawa (Saga University) For CDC group.
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Study of 1D Hit Error Assignment Marco Terranova, Filippo Pisano, N. Amapane, G. Cerminara.
Marcel Vreeswijk (NIKHEF) The NIKHEF Muon Mission Chamber assembly Assembly QA Assembly QC Summary, Status and Plans The Assembly of ATLAS Muon chambers.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
MDT Status Report MDT Status Report G.J. Bobbink NIKHEF30-may-2005.
Michele Faucci Giannelli
ATLAS pixel module assembly flow
Figure 1 Changes of mitral valve geometry caused by PMVR
CDC Prototype Development: An Update
Tracking results from Au+Au test Beam
R. Bates UK-V meeting Liverpool, 21/04/2004
Studies for Phase-II Muon Detector (|η| = ) – Plans
Update on DECAL and some questions
Mechanical stability and QXF coil winding
MDC Data Check Wu Linghui
Z. Szillasi On behalf of GEM Alignment group November 15, 2017
Gas Monitoring Chamber Production Status
CDC Structure S. Uno KEK
Transfer Line and CSC Rφ Reconstruction
New MWPC for CB Status Report Oct 2004
Chapter 8 - Estimation.
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
University of Wisconsin-Madison
In order to properly understand the layers of the earth, you will create a folding model. Follow the directions below and use the information cards detailing.
Univerity of rome “Tor Vergata”
Imaging crystals with TKR
Sergei Gepshtein, Martin S. Banks  Current Biology 
Status of Transfer Line Reconstruction University of Wisconsin-Madison
Volume 15, Issue 8, Pages (August 2007)
CDC structure Shoji Uno (KEK)    July-8, 2009.
CGEM Strips Display Long Peixun
Current Status of the VTX analysis
Primary Vertex with Pixel and Stripixel
Presentation transcript:

Production & QA of BOL chambers Tomo results BOL0,2,3 Comparison Tomo and QA data Production status Graziano Massaro(NIKHEF)

Graziano Massaro(NIKHEF) Xray Tomograph Site grid parameters from BOL0 Analysis of Martin Woudstra Results so-far (so-good!): Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) RMS along chamber Simple interpolation Include wire tension RMS Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) Closer Look BOL 0 Spacer inner outer BOL 0,2,3 similar results: Y pitch between inner tube layers significantly larger: 25 mm Probably due to glue shrink of black glue DP490 ~1%o x0.7mm also affects Y distance between ML: ~50 mm Y pitch between outer tube layer close to design Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) RASNIK vs Tomograph Rasnik on Xplate Study average Y,Z shifts of tube layers For RASNIK: take average of two RASASS towers + account for effect of Xplate sag For Tomograph: Results BOL0,2,3 from analysis M.Woudstra (NIKHEF) Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) Z shifts Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) Sag Compensation BOL2 Layer 1 Start: -15/2 um During gluing of layer 1 and 2, significant changes in Xplate sag were observed: Instable reduction valves? Effect of glue viscosity? End: -38/2 um Layer 2 Start: 30/2 um End: 50/2 um 1 deg Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) Y shifts Graziano Massaro(NIKHEF) s

Tube Position (GL) vs Tomo Average Residuals from pre-glue laser checks 4 chambers, 6 layers Tomo Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) Production Status Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF) Broken Wire Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF)

Graziano Massaro(NIKHEF) Y Graziano Massaro(NIKHEF) s

Graziano Massaro(NIKHEF)