TS1 preparatory meeting

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
TC meeting P2 planning wks 7&8 A.Tauro
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
EN-CV interventions during YETS
ALICE TC meeting – Plans for the next technical stop A. Tauro.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
TC meeting P2 planning wks 9&10 A.Tauro
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
DCal-ALICE integration and installation plan and status A. Tauro.
André Augustinus P2 events & perturbations 07 May 2010 ALICE Technical Coordination Meeting.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Magnet activities in SPS during EYETS
EYETS planning A.Tauro.
(Access system for HWC)
ALICE 5 o’clock meeting Wk 51.
University of Colorado – Boulder
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
TE-MSC activities in SPS during LS2
Rosario Turrisi INFN Padova
LS1 planning meeting
Gas system Commissioning procedures and status
Helium spill in LHC tunnel
ALICE 5 o’clock meeting Wk
ITS Cooling: Xmas Plan Claudio Bortolin.
SPS EN-CV Planning LS (initial draft)
MPE main activities planned for LS2
ALICE TC meeting – Plans for the next technical stop
M.Tavlet, H.Taureg - ALICE
Short LHC-TS week 38 Confirmed by LMC on 16th August
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
LHCb & EYETS
TE-MSC activities in SPS during YETS
ALICE 5 o’clock meeting Wk
GIS Portal Racks Project
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
November technical stop activities:
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

TS1 preparatory meeting A.Tauro

TS1 preparatory meeting General information LHC-TS1: from Mon July 3rd at 6:00 AM to Fri Jul 7th at 17:00 Planning: Switch off both magnets Mon 6:00 AM  SL – take out interlock keys RP check: Mon 8:30 - 9:00  Klaus Access: from Mon at 9:00 to Fri 16:00 Access mode: automatic restricted (with token) 30/6/17 TS1 preparatory meeting

TS1 preparatory meeting Access restrictions EN-HE wants to work at the cavern lift No UX25 access everyday (Mon to Thu incl.) after 18:00 NO access to triplets area (ADC) 30/6/17 TS1 preparatory meeting

DCS DCS will perform the ‘usual’ maintenance on the first day (Mon 03.07) of the technical stop (performing WinCC backup, restart of systems etc.) However, this time we will need to add on a few additional activities that cannot be avoided: Urgent windows patches (to protect against the recent virus attacks) Installation of a local DNS (to mitigate the impact of a CERN DCS outage as we suffered on 18.06) Put the new fileserver in production (new HW, more robust) Some of these additional will take some time (e.g. windows patches), therefore the total time required will be in the order of 8 hours. Due to this DCS will be unavailable from 09:00 to 17:00, as already announced to the DCS experts earlier this week. As always we strongly suggest to do, towards the end of the TS, a test of all common operational procedures: safe-supersafe-ready-safe cycle, simulated handshake, validation of configuration procedures and test the magnet-safe and restore-from-magnet-safe procedures.

TS1 preparatory meeting Detector activities 1/2 ITS: SPD cooling maintenance: replacement of filters and cleaning of sector 7 line in PP4 + flow tuning at the plant RP check beforehand (CV+RP) TPC: Install a second GEM chamber, an OROC, in the miniframe. Inspect existing IROC. Install hardware for IROC Mon/Tue: replace RCU2 card if necessary (firmware update), check netgear switches, measure some distances in TPC SSWs. Access to mini frame and back frame inside L3 TOF: Check CAEN HVPS (CR4) Check HV cable on SM16 (C-side, external module) CAEN LVPS crate 58 (SM14, C-side) to replace CAEN LVPS crate 64 (SM16, A-side) to check EMC/DCA: Replacing 2 Readout Units on EMCAL A-side Fixing 1 LED unit on EMCAL C-side Visual checking 3 x 0.5 day access needed 30/6/17 TS1 preparatory meeting

TS1 preparatory meeting Detector activities 2/2 AD: See how to move the HV cables away from power lines The HV cables needs to be shortened to remove the excess and the connectors will be replaced in CR4. Finally we need to do a light test in both A and C sides. The lights needs to be turned off in the miniframe (A- side) and the tunnel (C-Side) PHOS: Refill cooling plant with C6F14 MCH: FRT, LVPS change Change a FRT card for Ch3 of Stn2 in FASS Change an LVPS below the dipole floor MTG: Check HV cable, need nacelle I-side (Monday 10:00). If needed, replace RPC Repair transmission system to open detector (O-side) 30/6/17 TS1 preparatory meeting

L3 access Watcher in bold Mon Tue Wed Thu Fri AM shift (8:00 – 12:30) EMC/TOF PM shift (13:30 – 18:00) 30/6/17 TS1 preparatory meeting

TS1 preparatory meeting Other activities TE-VSC: close/open manual valve Miniframe (Mon 9:00 and Fri 14:00 respectively) TE-EPC: lockout L3 power converter Mon 8:00 in order to extend the roof and to check the temperature of the bus-bars. Unlock converter Fri morning EN-EA: pull TPC HV cable (CR4-Miniframe) Mon and Tue: pull cable – need nacelle (+Philippe)  no access Miniframe 2h Tue PM Tue PM: install connectors Wed: test Philippe: replace PMD ventilation hose EN-HE: reinstall crane electronics Monday 9:00 EN-EL: SCADA comms verification on EBD301/29 EN-CV: maintenance ARC & CR ventilation, and of old ITS ventilation in CR5 Gas supervision update (JIRA tickets): UNICOS components updates and internal project configuration updates. Tuesday, July, 4th   9:00-12:00 Survey: measurement in front of L3 doors, below the miniframe platform (Wed/Thu) EN-HE: CR lift maintenance: Wed 5th from 8:00 to 10:00 BE-ICS-AS: interventions on the gas detection system, total transparency, no interlocks will be activated: Monday 3rd: quarterly maintenance of gas barrack SG2 Monday 3rd (tbc) : calibration of SNIFFER oxygen sensors  no impact on access 30/6/17 TS1 preparatory meeting