NON-PURGING GROUNDWATER BOREHOLE SAMPLING TECHNIQUE PRACTICED IN A COAL FIRED POWER STATION ENVIRONMENT Test & Measurement Conference_2017 Saint George.

Slides:



Advertisements
Similar presentations
1 Samples are stored in a cold room at optimal storage temperature and humidity.
Advertisements

Analyze-Immediately Parameters pH Analyze Immediately Within 15 minutes of collection: pH Residual Chlorine Temperature Chlorine Dioxide Dissolved Oxygen.
Overview of the EPRI Groundwater Assessment Program
Volunteer Water Monitoring Support through the UWSP Center for Watershed Science and Education Nancy Turyk Citizen-Based Monitoring Conference August 2004.
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
Multi-Level Ground-Water Monitoring Travis von Dessonneck.
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
Module 6 Effluent Monitoring and Receiving Water Monitoring.
Chain of Custody Records Proper Documentation Techniques Dr. Richard Medina Environmental Testing and Consulting, Inc.
Collecting a Stormwater Sample Annual CMTA Marine Trades Exposition October 5, 2010.
Potential Pathways for Coliform Contamination. Fixing Positive Coliform Results.
Environmental Data Integration and Management SiteFX Sampling Program Manager Prepared for General Prepared byKelsy Brennan, P.Eng EarthFX Inc.
Bacteriological Sampling Ken Morin, P.E. (based on slides prepared by: Bob Clement, EPA Region 8)
SCR-15 Coal Slurry Underground Injection. SCR-15 “That the Department of Environmental Protection and the Bureau for Public Health shall jointly design.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Inorganic Chemicals (IOC) Non-Metals Sampling Procedures.
Quality control of raw materials In-process control
Oil Spill Sampling.
Quality Assurance/Quality Control Policy
Water Facts: 70% of the Earth is covered by water but only 2% is drinkable, fresh water One litre of wastewater pollutes about eight litres of freshwater.
Material Sampling.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
The Pennsylvania Department of Agriculture Division of Milk Sanitation in Cooperation With The Pennsylvania Milk Marketing Board Bulk Milk Farm Pickup.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Geophysical and Geochemical Exploration Techniques  The specification sates that you should be able to:  Describe the geophysical exploration techniques.
1 Module 6 Effluent Monitoring and Receiving Water Monitoring Seattle, Washington April 24-25, 2012.
Monitoring Well Sampling. SAP (Sampling Analysis Plan) SAP (Sampling Analysis Plan) Frequency Frequency Purging Purging Pumps and Bailers Pumps and Bailers.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
John N. Dougherty, PG Lisa Campbell, PG EPA Region 2, New York City
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mine Site Water Quality Monitoring Michael.
SRRTTF Synoptic Sampling Event August Sample scoping meeting and site reconnaissance on July , 2014 Scope revised to include vessel use,
Presented by Steven P. Feltman Food Safety and Quality Specialist.
Radionuclides Sampling Procedures. The purpose of these slides is to demonstrate recommended sampling techniques. This presentation includes: supplies.
- Water beneath the Earth’s surface in sediment and rock formations.
Using Standard Operating Procedures in the Field 2 nd Annual Red River Basin Water Quality Monitoring Training – April 13 th, 2005.
Geophysical and Geochemical Exploration Techniques  The specification sates that you should be able to:  Describe the geophysical exploration techniques.
SETA Water treatment plant maintenance
NTN FIELD LAB PROCEDURES  Weighing  Sample Conditions  Decanting  Shipping.
Sample collection & submission, chain of custody, choosing the right test for Microbiological testing.
Managing Hazardous Chemical Waste. What is Hazardous Waste EPA Definition: A material is a hazardous waste if due to its quantity, concentration, physical,
Lynsay Bensman 06 October 2009 Errors in Sampling/Monitoring in an Internal Corrosion Program NACE Eastern Area Conference.
Today’s Lecture  Groundwater sampling. Announcements  Lecture  today: groundwater sampling  Thursday: HAZWOP – quiz (Bruce)  Lab  Lab 1: Phase I.
Dental radiology د. باسم الاعسم.
Inorganic Chemicals (IOC) Metals Sampling Procedures.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Containment and.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
An introduction to Private Water Systems
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Source: Penn State University Date and TimeLocation Kickoff Meeting Receive sample kits, an introduction to the program, and instructions Fill in Sample.
GUIDANCE ON PACKAGING AND SHIPPING OF URINE SAMPLES
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Lecture (9): Monitoring & sampling methods, maintenance ,
Release Reporting Lesson 17 covers the subject of Release Reporting. You will learn how you know when you have a leak and what leaks require reporting.
The use of borehole radar tomography to monitor a steam injection pilot study in a contaminated fractured limestone (Maine, USA) C. Grégoire, J.W. Lane.
SAFETY IN THE LABORATORY
Groundwater Monitoring in Ontario
YOUR County Drinking Water Clinics Kickoff Meeting DATE
Goodyear Napanee Contractor Safety
Environmental Issues Mapping Field Lab
YOUR County Drinking Water Clinics Kickoff Meeting DATE
Ultimate Clean Digestion Cups and Clean Lab Testing
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Groundwater area protection plans in water management
The inventory of Finnish groundwater resources
Source: Penn State University
Food Safety T-1150 This work has been produced by DGL (Aust) Pty Ltd
Sterile Technique.
Department of Water and Sanitation
Mr George Molaolwa (Cand. Sci. Nat.) M.Sc. HYDROGEOLOGY
Presentation transcript:

NON-PURGING GROUNDWATER BOREHOLE SAMPLING TECHNIQUE PRACTICED IN A COAL FIRED POWER STATION ENVIRONMENT Test & Measurement Conference_2017 Saint George Hotel & Conference Centre, Pretoria Presented by: Gundo Mathoho Date: 31 July 2017

Contents Introduction Groundwater monitoring at Eskom sites Groundwater Sampling Depth: EC Profiling Groundwater Sampling: Bailing method Case Study: Komati Power Station Conclusions

Introduction Groundwater sampling for years has been done across Eskom sites mainly for evaluating the water quality of underlying aquifers Water qualities from these aquifers is used to understand the natural processes governing groundwater chemistry changes, as well as potential impacts due to anthropogenic influences occurring at the surface Eskom employs two non-purging groundwater sampling techniques for optimal interval sampling of the representative sample at a particular depth Solinst Discrete sampler and a double valve bailer are used at Eskom

Groundwater Monitoring at Eskom sites Groundwater resource and its usage is protected and regulated under the National Water Act (Act 36 of 1998) of South Africa Eskom is obligated to conducting groundwater monitoring at all its Power Stations as part of the Water Use License (WUL) conditions Surface & groundwater monitoring at Eskom sites has been taking place since the 1980’s. Monitoring sites per site: 20 - 50 (boreholes) & 10 – 70 (surface) Annual Cost of monitoring: ± R 1 000 000 per site

Cont. The bulk of the work that Eskom and contracted consultants undertakes is mainly seasonal monitoring program which includes: Collection of groundwater samples Laboratory chemical analysis of samples Interpretation of results and reporting to Department of Water and Sanitation (DWS)

Groundwater quality potential impacts

Cont. Over 90% of SA’s aquifers fractured Fractures form conduits through which groundwater and pollution can move Rock matrix stores water Boreholes intercepting fractures can have high yields

Cont.

Cont. Recommended sampling depth= 7mbgl Gomo et al 2017

Discrete Groundwater sampling: Bailing Method A bailer is non-invasive grab sampler used in groundwater monitoring boreholes to collect a groundwater sample below the ground surface Typically, a bailer consist of a hollow tube with two or one valves and a handle at the top to attach either or both the anchoring and valve regulating line.

Cont. Rinse the sampler on surface and make sure that everything works well. Lower the sampler to a predetermined depth of the borehole Collect the water sample Fill sample bottle Immediately measure and record physicochemical parameters Preserve sample according to laboratory instructions

Case Study: Koamati Power Station Komati Power station is located South of Middleburg The site forms part of the Highveld Coalfield The main water bearing aquifers in the vicinity of the power station are fractured rock aquifers Groundwater monitoring at Komati power station is done according to relevant environmental permit conditions EC profiling was perfomed using a calibrated Solinst TLC meter on three monitoring boreholes located at the ashing area Selected boreholes are AB01, AB04 and AB07, the maximum penetrated depth during drilling was 40mbgl for all boreholes

Komati Power Station

Logs vs. EC profiles

Cont.

Cont.

Cont. No preferential pathways for groundwater migration and contaminant migration can be identified. It is recommended that sampling be continued at this depth. It should be noted that all boreholes were drilled to a depth of 40 metres but has since silted up to a depth of around 37 metres.

Conclusions Groundwater monitoring boreholes at Eskom sites are purged using a borehole submersible pump at least twice a year as good practice This ensures relative fresh groundwater ingress into the borehole to avoid stagnation of water, especially in low yielding boreholes. During the EC profile investigation no preferential pathways were identified in the boreholes along which groundwater contaminant flow can take place Previous sampling depth might have been determined on the basis of drilling information, in particular, the water strike with the highest blow yield The current sampling depths are therefore recommend as future sampling depths Future work = Comparative study,

Thank you Gundo Mathoho - Hydrogeologist Research Testing and Development Lower Germiston Road Rosherville Gauteng Private Bag 40175 Cleveland 2022 SA Tel: +27 11 629 5643 Cell: +27 72 501 4020 E-mail: Mathohg@eskom.co.za

Backup slides

The order of sampling must be from the (expected) least contaminated boreholes to the most contaminated holes. Record borehole number, time, date and any other relevant observations on the sampling form. Remove the borehole cover carefully, inspect the borehole and record abnormalities observed Measure and record the collar height of the borehole above general ground level Measure the depth of the static groundwater level to an accuracy better than one cm. (Water levels should be recorded from the collar height – unless specified otherwise) Clean all sampling equipment if necessary.

Lower the bailer to the prescribed depth and grab the sample in the appropriate way as described for the specific bailer. Raise the bailer to the surface and rinse the sample bottle, with some of the sampled groundwater. Carefully fill the sampling bottle with the sampled water, ensuring that the bottle is filled to the brink with no air trapped. In the case of sampling for metal analysis, it is essential that the sample bottle is only opened when ready to fill and not emptied or rinsed as it contains preservative acid. While filtering fill the sampling bottle with the sampled water ensuring that the bottle is filled to the brink with no air trapped. All samples collected for metal analysis should be filtered and preserved, unless otherwise specified by the project leader. Should samples be taken for bacteriological analysis, the appropriate preserved sample bottles should be used.

Replace the cap and dry the bottle with clean absorbent paper/cloth. Take field measurements such as pH, EC, Temperature and DO Attach a clean label to the bottle and write the following information on the label using legible capital letters: Site and project name Sample (borehole) number Date Constituent to be analysed Name of the project manager

Preserve the sample on ice or in a cooler box. Laboratory to analyse samples Sample depth The sample label should be covered with sello-tape to prevent damage to the label. Preserve the sample on ice or in a cooler box. Complete the chain of custody, leaving no blanks. Rinse the bailer with clean water. Carefully repack all equipment, ensuring that it is not contaminated during travel. Replace the borehole seal.

Ensure that the site is in good order before leaving. Return all samples to the lab as soon as possible, preferably never more than three days after sampling. All samples collected for bacteriological and chrome VI analysis should be submitted to the laboratory within 24 hours.