CMP Transparency Requirements

Slides:



Advertisements
Similar presentations
Allocation of Capacity in Portugal Under the New Regulation 24th IG meeting S-GRI, Madrid September 23, 2013.
Advertisements

Draft CMP ROADMAP S-GRI Madrid 27 th February 2013.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
15 th September 2013 Enagás and TIGF Information to NRAs.
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Workgroup – Mod 500 WG(4) – 16 th September 2014.
Modification 500 slides for Workgroup
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
Transfer & Trades Special Transmission Workstream
EU Workgroup – Mod 500 Action 703 – confirm current capacity surrender process.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Auctions recommendations GTE+ Capacity Product Coordination (CPC) Workshop on 26 November 2008 Matthew Hatch National Grid.
Pending changes to mod 500 WG(6) – CAM-CMP. Final Mod Updates  Add in Charging Objectives  Change to table in Charging Methodology Section.  Clarify.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
September 2008 QSEC auction - Allocations Transmission Workstream
DRSEC Update Transmission Workstream 06 November 2008.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Allocation of capacities. 2 Allocation of Capacities Determination of capacities Calculation of pipeline capacities is based on the physical laws governing.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
29th November 2016 Teleconference
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Transparency Project GRI NW Region
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Proposer: Matthew Hatch Panel Date: 20/10/16
Capacity Conversion – 616s
MIPI Changes October 2012.
19th June videoconference
EU Implementation Programme
26th IG meeting 23th January 2014
Allocation of Capacity in Portugal Under the New Regulation
Transmission Workstream, 2nd March 06
GRI North-West Meeting
Allocation of Capacity in Portugal Under the New Regulation
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
29th April 2014 Teleconference
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
GRI North-West Meeting
Enagás, GRTgaz, REN and TIGF
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
29th November 2016 Teleconference
PARCA Security and Termination Amounts
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enduring NTS Exit Capacity Arrangements - Update
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Modification 501 slides for Workgroup
EURELECTRIC transparency requirements
Review of Trade and Transfer Winter 09/10
Optimisation of Entry Capacity Modification Proposal
Gas European Network Code Implementation
Information Provision for Transitional Exit Capacity
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
PRISMA General Information
Entry Capacity Transfers - Constrained Period
Gemini Contingency Guidelines
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

CMP Transparency Requirements UNC0449 Workgroup 25 June 2013

Transparency compliance overview New Transparency reporting requirements go live on 1st October 2013 National Grid NTS are required to publish CMP specific data Compliance will be achieved by uploading CMP data manually Following slides will illustrate how the information will be published and map the CMP requirements to the data detailed within UNC0449

H: Occurrence of unsuccessful, legally valid requests for firm capacity products Request applies only in case of non-auctioning mechanism (interpreted as Exit only for National Grid NTS Firm capacity products with a consecutive period of 28 days or longer Information per contract type/per IP/per direction (Entry/Exit) Number of unsuccessful requests Volume of unsuccessful requests ‘Unsuccessful request’ = ‘Legally valid request which cannot be fulfilled in total or in part’ The profile of unsuccessful requested capacity per month has to be published Not required after CAM implementation Information for the period dd/mm/yyyy to dd/mm/yyyy: No IP Contract type Entry / Exit Period of requested volume Requested Volume [kWh/h] Allocated Firm Volume [kWh/h] Request 1   e.g. Entry 01/01/2012–30/06/2012 e.g. 100.000 e.g. 80.000 Request 2 IUK Firm Quarterly Entry 01/04/15 - 30/06/15 10,000,000 5,000,000 Request 3 Moffat Firm Monthly Exit 01/05/13 - 31/05/13 3,000,000 1,000,000

Mapping of “H” to UNC0449 CMP Requirement "H"  Details of each Enduring Annual NTS Exit (Flat) Capacity application and Annual NTS Exit (Flat) Capacity application, that were either not allocated NTS Exit (Flat) Capacity or partially allocated NTS Exit (Flat) Capacity, for each of these applications the following information will be published:  IP - The IP Contract Type - The class of NTS Exit (Flat) Capacity which will be Enduring Annual NTS Exit (Flat) Capacity or Annual NTS Exit (Flat) Capacity Period of Requested volume - Application start date, which is the first month and Gas Year for which the application applies Requested Volume - Application Amount, which is the amount of NTS Exit (Flat) Capacity subject to the capacity application  Allocated Firm Volume - Allocated amount, which is the amount of NTS Exit (Flat) Capacity allocated in relation to the application

I: Where and when firm capacity products have cleared at prices higher than the reserve price Request applies only in case of auctions Firm capacity products with a consecutive period of 28 days or longer per contract type/per IP/per direction (Entry/Exit) Cleared price > reserve price (also include auction premium) To be published after each auction depending on individual auction calendar Where: Interconnection Point and Auction (Type, duration, etc.) Bundled and unbundled Capacity to be auctioned Information for the period dd/mm/yyyy to dd/mm/yyyy: Date of Auction (from / till) Entry / Exit Product Period of requested volume Where (IP) Where (Auction) Cleared Price Reserve Price 01/12/2011–14/12/2011 e.g. Exit Product 1 01/01/2012–30/06/2012 Zeebrugge HUB XY   10/02/14 - 25/02/14 Entry Firm Monthly 01/10/14 - 31/03/15 IUK Gemini 0.0002 0.0001

Mapping of “I” to UNC0449 CMP Requirement "I" For allocations of Quarterly NTS Entry Capacity where capacity bids have been allocated at a step price that is in excess of the reserve price and Monthly NTS Entry Capacity where capacity bids have been allocated above the reserve price, National Grid NTS will publish; Where - The IP  Product - The allocation process, which will be either an Annual NTS Entry Capacity auction or Rolling Monthly NTS Entry Capacity auction  Reserve Price - The reserve price Cleared Price - The QSEC auction step price as applicable Cleared Price - The AMSEC auction Weighted Average Price by tranche as applicable Cleared Price - The Rolling Monthly NTS Entry Capacity auction Weighted Average Price as applicable

Auction or reg. Allocation Process J: Where and when no firm capacity product has been offered in the regular allocation process Firm capacity products with a consecutive period of 28 days or longer Regular allocation process (depending on the individual TSO) ‘Regular’ …means following individual allocation calendar of TSO Information for the period dd/mm/yyyy to dd/mm/yyyy: When (from / till) Product IP Where (Auction) Auction or reg. Allocation Process 01/12/2011–14/12/2011 Product 1 Zeebrugge Hub XY   01/12/14 - 31/12/14 Monthly IUK Gemini MSEC auction

Mapping of “J” to UNC0449 CMP Requirement "J" For NTS Exit (Flat) Capacity application processes, Annual NTS Entry Capacity auctions and Rolling Monthly NTS Entry Capacity auctions National Grid NTS, in instances where no capacity has been made available, publish the following; The IP - The IP The Auction or regular allocation process - The relevant NTS Exit (Flat) application or NTS Entry Capacity auction process

K: Total capacity made available through the congestion-management procedures k) total capacity made available through the application of the congestion-management procedures laid down in points 2.2.2, 2.2.3, 2.2.4 and 2.2.5 per applied congestion-management procedure Data to be published quarterly: End of March, June, September and December! First upload will be of Quarter 1 data i.e. October, November and December 2013 Information for the period dd/mm/yyyy to dd/mm/yyyy: CMP Total Capacity [kWh/h or /d] Capacity increase through oversubscription and buy-back scheme   Firm day-ahead use-it-or-lose-it mechanism Surrender of contracted capacity Long-term use-it-or-lose-it mechanism TOTAL

Mapping of “K” to UNC0449 CMP Requirement "K" - it is proposed that National Grid NTS will, publish for IPs only, the total capacity made available through the congestion management procedures: Surrender - aggregate Firm NTS Exit (Flat) Capacity made available via: The Enduring Annual NTS Exit (Flat) Capacity surrender process; and The Annual NTS Exit (Flat) Capacity surrender process Oversubscription - The aggregate amount of additional Annual NTS Exit (Flat) Capacity allocated The aggregate Firm NTS Entry Capacity made available via: Surrender - The QSEC Auction surrender process Surrender & Oversubscription - The AMSEC Auction surrender and oversubscription process