Environmental Pool Management in the Upper Mississippi River: Managing Water Levels to the Benefit of both Navigation and the Environment Edward Brauer.

Slides:



Advertisements
Similar presentations
Upper Mississippi River Recreational Boating
Advertisements

UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
Glen Canyon Dam Adaptive Management Program WY 2000 Low Steady Summer Flow Randy Peterson, BOR Barry D. Gold, GCMRC A Test of Concept.
Riparian Zone Habitat Assessment Vegetation and More.
Shrub and Wooded swamps are shrubby or forested wetlands found along the edges of lakes, rivers, and streams Seasonal Basins or flats are small, isolated.
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
St. Louis District Water Control Operations
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
US Army Corps of Engineers BUILDING STRONG ® Engineering With Nature: Sustainable, Multi-benefit Projects Thomas J Fredette, PhD and Michelle Bourne Environmental.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
1 Management of Fresh Water Wetlands in Bangladesh: Issues and Strategy Presented by Ainun Nishat IUCN-Bangladesh ---- Coastal and Wetland Biodiversity.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
CORPS OF ENGINEERS REGULATORY PROGRAM WETLAND DELINEATION MANUAL August 26, 2005.
Module 3: Environmental Objectives, Programme of Measures, Economic Analysis, Exemptions PoM implementation: wetland restoration Alexei Iarochevitch Afyon,
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District February 2013.
SAN FRANISCO BAY By: Randall Alcorn. Golden Gate Bridge.
Effects of Human Involvement in the River Ecosystem Jonathan Sexton.
April 22, 2003 IERM Overall Objectives 1.Quantify relationship between hydrologic and hydraulic attributes and effects on selected ecological performance.
The Value of Native Ecosystems
Yellowtail Dam & Bighorn Lake Billings, Montana January 2011 RECLAMATION Managing Water in the West.
Pomme de Terre Lake Water Quality Summary Pomme de Terre Lake Water Quality Summary US Army Corps of Engineers Environmental Resources Section.
Chapter 10 Wetlands. I. What determines a Wetland? A. The nature and properties of wetlands varies widely in Texas and worldwide, wetlands are typically.
Ganga Basin Hydrologic Regime – Environmental Flow Perspective World Bank and INRM Consultants New Delhi February, 2015.
WATER RIGHTS AND ENDANGERED FISH FINDING SOLUTIONS FOR FLOWS UTAH DIVISION OF WATER RIGHTS
THE MISSISSIPPI RIVER. General facts: Third largest drainage basin in the World The Mississippi drains 1/3 of USA and a small part of Canada. Second longest.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Biomes & Succession. The biosphere is divided into regions called BIOMES that exhibit common environmental characteristics. Each biome is occupied by.
National Weather Service North Central River Forecast Center Mississippi River Forecast Procedure.
Conservation Drainage: Drainage for the 21st Century
Wetland Creation Why and How Char Ison and Caleb Asbury.
US Army Corps of Engineers BUILDING STRONG ® 2012 Changes to Stream Mitigation Procedures and Guidelines Mike Moxey USACE, Mobile District IRT Chair May.
A Review of Some Grant-Funded Watershed Projects in Central Illinois: Part II Illinois Lake Management Association Grant Opportunities and Funding Options.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
The Atchafalaya Basin Jonah D. Price April 6, 2005.
MVS Mainstem Forecast Model Update: NETMISS2 by Joel Asunskis, P.E. Hydraulic Engineer, St. Louis District Water Control U.S. Army Corps Of Engineers October.
Delaney Forestry Services Matt Delaney Albany, Oregon
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Sediment & Nutrient Management in the L’Anguille River Watershed St. Francis County Cost Share Project Patricia Perry St. Francis County Conservation.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Saginaw Bay Phragmites Control and Restoration Demonstration Project Julie Sims MDEQ, Water Bureau SBCI Regional Update Meeting Bay City, MI June 5, 2009.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
Considering Ecosystem Services in Restoration Decisions on the Upper Mississippi River System ACES, 2008 K. S. Lubinski K. Barr J. Barko S. Bartell R.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Establishing the Scientific Basis for Ecosystem Management On the Upper Mississippi River Dr. Ken Lubinski, USGS Upper Midwest Environmental Sciences Center.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Sediment Management in Prado Basin and Lower Santa Ana River Greg Woodside, P.G., C.Hg Executive Director of Planning & Natural Resources September 20,
Hydropower on the Upper Mississippi River Development Activities and Agency Coordination Upper Mississippi River Basin Association June 5, 2013.
 The Living Murray. What is The Living Murray?  The Living Murray is one of Australia’s most significant river restoration programs. It aims to improve.
Water Quality Certification for hydropower licensing in Wisconsin.
Corps of Engineers BUILDING STRONG ® Interim Operating Pools Jerry W. Webb, P.E., D.WRE Principal Hydrologic & Hydraulic Engineer Hydrology, Hydraulics.
Educational Activities about the Upper Mississippi River Angela Freyermuth US Army Corps of Engineers, Rock Island District.
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
Environmental watering – How is it the same or different from floods? Denis Flett Chairperson, Victorian Environmental Water Holder Friday 14 November.
Where critical areas & agriculture meet
OPEN SPACE/ CONSERVATION
Native and Wild Trout Conference April 21, 2016 Phoenix AZ
Savannah River Projects
Resident Canada Goose Regulations
Mid-West Electric Consumers Association
Expert Panel on Diversion Planning and Implementation: Meeting #3
Challenges Facing Riparian Ecosystems
Albeni Falls Dam Operations
Michigan Dept. of Environmental Quality Water Resources Division
Ecological Succession
Study Update Tailrace Slough Use by Anadromous Salmonids
Bay Grass Abundance 42% Bay Grass Abundance of Goal Achieved
InstaTurf Project Spotlight
Presentation transcript:

Environmental Pool Management in the Upper Mississippi River: Managing Water Levels to the Benefit of both Navigation and the Environment Edward Brauer Joan StemLer - USACE Ben McGuire - USACE Brian JohnSon- USACE Gretchen BenJamin – The Nature Conservancy U.S. Army Corps of Engineers St. Louis District FOUO – Do Not Release Outside MVS.

Navigation within the St Louis District Melvin Price Locks & Dam L&D 24 Illinois River Missouri River Locks 27 5 Locks and Dams, 4 with regulating control and 3 on the mainstem Mississippi, last one we (WC) controls is Mel Price. Open river from St. Louis to the Gulf. Mississippi River L&D 25 Low Water Dam 27 Kaskaskia L&D

Managing Water on the Upper Mississippi River Dam Point Control vs Hinge Point Control Dam Point Control The Navigation Pool is regulated at the Lock and Dam within 0.5 to 1.0 ft band limits Hinge Point Control The Navigation Pool is regulated from two points, the Lock and Dam and a location in the pool St Louis District Manages through Hinge Point Control (Pool 24-26)

Visualizing Hinge Point Operation L&D 25 RM – 241.2 Flow Melvin Price Locks and Dam Hinge Point Limits, Grafton: 14.2 - 16.2 May be exceeded if at maximum drawdown or Alton at 414.0 Alton Lower Limit: 414.0 Pool Limits: 412.5 - 419.0 Grafton RM – 218.6 Low Flow / Flat Pool Government Owned Flowage Easements Mel Price L&D RM - 201.1

Visualizing Hinge Point Operation L&D 25 RM – 241.2 Flow Grafton RM – 218.6 Low Flow / Flat Pool Government Owned Flowage Easements Mel Price L&D RM - 201.1

Visualizing Hinge Point Operation L&D 25 RM – 241.2 Flow Grafton RM – 218.6 Increasing / Decreasing Flow Environmental Pool Management Zone Government Owned Flowage Easements Mel Price L&D RM - 201.1

Visualizing Hinge Point Operation L&D 25 RM – 241.2 Flow Grafton RM – 218.6 Maximum Drawdown Environmental Pool Management Zone Government Owned Flowage Easements Mel Price L&D RM - 201.1

Visualizing Hinge Point Operation L&D 25 RM – 241.2 Flow Grafton RM – 218.6 Open River Environmental Pool Management Zone Government Owned Flowage Easements Mel Price L&D RM - 201.1

What is Environmental Pool Management? Goal: Provide habitat for fish and wildlife by managing water levels in navigation Pools 24, 25 and 26 to promote plants growth in shallow areas, typically along the shoreline of the river. Ongoing since 1994 Adaptive Management! - based on flows Daily/hourly gate movements at the dams Pilot project – 2015 to present - Extend the period of growth

Environmental Pool Management Imperative Continue to provide a safe and dependable navigation channel. BUILDING STRONGSM

Environmental Pool Management Started in 1994 with a relatively modest request Can we provide lower water and expose shoreline during the growing season? Request was for .5 ft for 30 days during the growing season, with a slow rise. We tried it and turns out that yes we could Have successfully executed EPM of some type every year since 1994 2014 we had a extended period of EPM and noted some really great results which shifted our thinking…….

Environmental Pool Management Goals (since 2014) Utilize the following parameters as general guidelines: Begin EPM around April 1st Before the majority of fish spawn begins Reduces likelihood of fish being stranded. Continue EPM from May 1st for at least 90 days or until hydrologic conditions require routine dam operations the period most suitable for vegetative growth and seed production. At the end of EPM, allow the pool to rise at a rate <0.3 foot per day or a rate recommended by the EPM Coordination Team Slow rise allows vegetation to survive and continue to grow

Environmental Pool Management Requirement Close coordination with resource managers in the field Environmental conditions will vary from year to year Time of year, temp, and precipitation all have an effect Field managers provide valuable insight into actual conditions Provide significant suggestions relative to needed adjustments.

2014 EPM got people thinking

Rethinking convention - Summer 2014 Cyperus spp. Fall panicgrass (Panicum dichotomiflorum) Cyperus spp. Wild millet (Echinochloa crusgalli) Smartweed spp. (Polygonum spp.) Sedge spp. (Carex spp.) In 2014, we noticed great species diversity Specifically the come back of perennial species (arrowhead)

What Can We Achieve? 2015 2017 2016

Biological Response to EPM Biological Response to EPM

Floating Leaf plants come back

Diversity of Vegetation -structural diversity - short species that would have been inundated with previous 30-45 day operations.

Compounding effect? Perennial species beginning to come back - the more years we can accomplish longer duration water level reductions, the better the will be

Vegetative Response Pool 24 - June 2016 This and three following slides show vegetation growth progression.

Vegetative Response Pool 24 - Early July 2016

Vegetative Response Pool 24 - Late July 2016

Vegetative Response Pool 24 - August 2016 The extream height (8 ft tall smartweed) shows that there definitely some nutrient uptake occurring This has broad implications for reducing the Gulf Hypoxia

Successful Endangered Species Nesting – Interior Least Tern Federally endangered least tern using the sandbar Would not have occurred during normal operations.

Pollinator Habitat

Seed Produced for Migratory Waterfowl Pool 26 Produced 650 lbs./ac ~ 1300 acres ~ 885,149 pounds of seed 30,000 ducks for 110 days Pool 24 Produced 750 lbs./ac ~ 315 acres ~ 239,200 pounds of seed 8200 ducks for 110 days

Benefits to Fish Summer Fall SIU-C 2002

And bugs (macroinvertebrates) SIU-C 2002

Residual vegetation May 2015 – Pool 26 May 28, Ellis Bay

If You Remember Nothing Else! Ballpark estimate >1500 acres in 2016 Increased diversity throughout the sites (perennial and annual) Increased structural diversity (short and tall) Increased sediment consolidation Nutrient Cycling (8 ft. tall plants) Early successional forest establishment – bank stabilization Increased vegetation production (annuals and perennials) Increased food availability for fish and wildlife Early timing increased mudflat habitat during the spring for migratory shorebirds Increased structure and diversity for fish and macroinvertebrates

Upper Mississippi River Basin Wide Workshop April 2017 Where Are We Going? Goal: Systemic Implementation throughout Upper Mississippi River Upper Mississippi River Basin Wide Workshop April 2017 Outcomes Expand and implement water level management opportunistically Conduct a cost-benefit analysis in other pools Address any policy and program implementation issues Implement drawdowns in Pools 13 and 18 Determine and seek necessary funding Further define how hydrology and hydraulics affect river management

Special Thanks Sustainable Rivers Program The Nature Conservancy USFWS Missouri Dept. of Conservation Illinois Department of Conservation The Upper Mississippi River Basin Association