33KV PLUG-IN TERMINATION AT GAYATHI D6624 PROJECT MANUFACTURE – PFISTERER ,SIZE – S3 FOR SIEMENS SWITCHGEAR
CABLE MARKING AS PER PFISTERER INSTRUCTION MANUAL
REMOVING OUTER JACKET & ARMOUR
PREPARING FOR REMOVING COPPER SCREEN
AFTER REMOVING OF COPPER SCREEN
REMOVING OF OUTER SHEATH ABOVE XLPE USING ROUND FILE
AFTER REMOVING OF OUTER SHEATH
REMOVING OF XLPE INSULATION FOR PLUG-IN CONNECTOR
INSTALLATION FOR COPPER MESH HOSE
INSTALLATION OF COTTON INSULATION TAPE BLOW THE COPPER MESH HOSE
SCREEN EARTH INSTALLATION
INSTALLATION OF SEMI CONDUCTOR TAPE
FINAL PREPARATION
APPLING FOR PFISTERER GREASE
INSTALLATION OF BELL FLANGE
INSTALLATION OF HV INSULATION PART & THRUST PIECE
INSTALLATION OF TENSION CONE
INSTALLATION OF CONTACT RING
CONTACT RING TIGHTING
READY FOR TERMINATION
TERMINATION AT SWITCHGEAR
INSTALLATION OF OUTER HEAT SHRINK TUBE
INSTALLATION OF OUTER HEAT SHRINK TUBE AFETR PLUG-IN