33KV PLUG-IN TERMINATION AT GAYATHI D6624 PROJECT

Slides:



Advertisements
Similar presentations
The PL-259 Connector Amphenol Nickel Plated Body Silver Plated Pin
Advertisements

HV Cable Suitable to sustain up to 15 kV Cable characteristics: 1.According CERN safety instruction IS 23 2.Single conductor- = 0.16 mm 3.Conductor resistance.
1 Cable Assembly for CanSat. 2 Heat Shrink Tubing Battery Pack Connection Pin Connectors Radio Cables Mic & Speaker Plugs See close up connection page.
How to install a PL-259 My Way! by Steve, N1NXU. Start with a clean cut. Notice how the top cable end is a nice clean round cut. It was cut with a cable.
…your final connection. Mine Cable Services Corporation. Cable Repairs: Vulcanized Splices.
Elements of engineering
UNDERGROUND CABLES.
PILC Replacement Page 1 April 2003 ICC PILC Replacement: Getting the Lead Out Spring ICC Cincinnati, OH April 30, 2003 ?
New Mexico FFA Agricultural Mechanics Career Development Event Electric Power.
Component Symbols & Information Prof. Dr. Moustafa M. Mohamed Vice Dean, Faculty of Allied Medical Science, Pharos University in Alexandria.
© 2012 DEHN + SÖHNE / protected by ISO Separation Distance 1.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Connecting Speaker Level Outputs to Harman Amplifiers.
EKAS Power cable and conductor terminations UEE31307 Certificate III in Refrigeration and Air Conditioning Stage 2A Units: UEENEEPOO1B Chris Hungerford.
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
WIRE REPAIR Chapter 4.
Established in 1968, Sahra KABLO has grown year on year, broadening both its customer base together with the products provided. We provide our.
DET 310 UNDERGROUND CABLES
EKAS Flexible cords and plugs to 250 V
Ernst Schutte African Cables 30 July CBI-electric: african cables  An empowered company  Powerhouse Utilities (Pty) Ltd  25,1% shareholding 
Electrical Principles and Wiring Materials
NETWORK ADAPTERS AND CABLING. OBJECTIVES  Identify a network interface card  Link the network interface card and the PC  Configure the network card.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
USB DMR Installation Instructions. After installing the programming cable to the radio and plugging the USB connector end to the computer USB port, then.
1 Cables A large portion of electrical signals are transmitted through solid electrical solid electrical conductors. A wire is a single conductor. A cable.
Electric Power ID. Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy.RST.9 ‐ 10.4 Determine the meaning of symbols, key terms,
Electrical Safety.
1a.  Exposed part  Live or energized part  De-energized part 1a.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
Frankfurt (Germany), 6-9 June 2011 Ger Sebregts – Alliander - The Netherlands – Session 1 Network Components – 0037 Investigation towards the upgrading.
The 13 Amp PLUG Fuse Insulating Casing Live Wire Neutral Cable grip Flexible Copper conductors Earth.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Electrical Principles and Wiring Materials Original Power Point Created by Casey Osksa Modified by Georgia Agricultural Education Curriculum Office June.
WIRE REPAIR Chapter 4.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
UNDERGROUND CABLE.
1 Learning Objectives The Importance Of Company Logos The Importance Of Company Image The Importance Of Packaging / Presentation Rules governing what should.
Weighline Rail Scale Installation. Track prior to the scale installation.
Direct Hot Water. What Cold Water System is Pictured? What hot Water System is Pictured?
Spacing of Cu clamp = 10” Clamp plate width = 2.5”, thickness = 0.375” Thickness of conductor insulation = 0.03” Thickness of coil ground wrap = 0.03”
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
WIRE REPAIR. TROUBLESHOOTING STEPS l Confirm the Complaint l Study the electrical schematic l Locate and repair the fault l Test the repair.
Acknowledgements: This Research was sponsored by ONR Funds: N Study on the Electrical Performance and Aging of Polymer Insulation S. Grzybowski.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Stripping and.
Grounding Grounding = connects material directly to the ground, or earth. The Earth is huge!! It can accept or give up many electrons without any significant.
Gas-insulated switchgear type ZX0
ELECTRICAL CABLE PREPARED BY : TUHIN HALDER & SURAJIT DUTTA.
ΒΡΑΔΙΕΣ ΚΟΙΝΟΥ – ΑΣΤΡΟΝΟΜΙΑ ΓΙΑ ΟΛΟΥΣ Ε.Γ. Ανασοντζής – Ε.Κ.Π.Α. Τίτλος WP5, Paris, Feb.09.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
High Temperature Superconducting (HTS) Cable Project
Agricultural Science Career Development Event Electric Power
Transmission Terminations and Joints
Heat shrink solder sleeving
Electrical Principles and Wiring Materials
Electrical Principles and Wiring Materials
Agricultural Systems Technology II
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Electrical Safety.
Maryland State Board of Elections
Natural Sciences and Technology Grade 6
WELCOME! This is a short slide introduction to Hanhe – G&W Cable Systems. Please contact us for full details!
Stainless Steel Corrugated Braided Hose Metal Expansion Joints
All rights reserved Gas-insulated Switchgear (GIS)
Power distribution system
DET 310 UNDERGROUND CABLES
Electrical components and systems
Under Ground Cables By Dr. P. Bala Chennaiah, Associate Professor,
Presentation transcript:

33KV PLUG-IN TERMINATION AT GAYATHI D6624 PROJECT MANUFACTURE – PFISTERER ,SIZE – S3 FOR SIEMENS SWITCHGEAR

CABLE MARKING AS PER PFISTERER INSTRUCTION MANUAL

REMOVING OUTER JACKET & ARMOUR

PREPARING FOR REMOVING COPPER SCREEN

AFTER REMOVING OF COPPER SCREEN

REMOVING OF OUTER SHEATH ABOVE XLPE USING ROUND FILE

AFTER REMOVING OF OUTER SHEATH

REMOVING OF XLPE INSULATION FOR PLUG-IN CONNECTOR

INSTALLATION FOR COPPER MESH HOSE

INSTALLATION OF COTTON INSULATION TAPE BLOW THE COPPER MESH HOSE

SCREEN EARTH INSTALLATION

INSTALLATION OF SEMI CONDUCTOR TAPE

FINAL PREPARATION

APPLING FOR PFISTERER GREASE

INSTALLATION OF BELL FLANGE

INSTALLATION OF HV INSULATION PART & THRUST PIECE

INSTALLATION OF TENSION CONE

INSTALLATION OF CONTACT RING

CONTACT RING TIGHTING

READY FOR TERMINATION

TERMINATION AT SWITCHGEAR

INSTALLATION OF OUTER HEAT SHRINK TUBE

INSTALLATION OF OUTER HEAT SHRINK TUBE AFETR PLUG-IN

THANK YOU