Exit Capacity User Commitment – Transmission Workstream update

Slides:



Advertisements
Similar presentations
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
Transmission Workstream 6 January 2011
Interactions with the implementation of RIIO-T1
Distribution workstream 29th January 2009
Transitional Exit Capacity Proposals -Update
Transmission Workstream February 2009
Exit Capacity Release Methodology Statement
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
UNC Modification Proposal 0373
UNC Trader User – Licence obligations
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Capacity Methodology Statements
Exit Capacity Substitution and Revision
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enduring NTS Exit Capacity Arrangements - Update
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream – 6th July 2005
Transmission Workstream - EU 3rd Package Update
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Information Provision for Transitional Exit Capacity
Open Letter - Summary of Responses
Review Group 221: Review of Questions from Session 2
Exit Overruns in the Enduring Regime
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
Presentation transcript:

Exit Capacity User Commitment – Transmission Workstream update June 2009

Background March 2009 - Exit Capacity User Commitment strawman developed Draft Exit proposal based on Mod 0246 Entry Capacity User Commitment April Transmission Workstream User’s would like to be consulted in the development of any Exit solution Draft Strawman needs to provide further financial detail on the risk to be addressed before shippers are able to identify/support required change Exit not the same as entry use of demonstration dates 4 year User commitment fixed location argument (new Power Station can’t decide to move!) some Users are required to provide security to meet their electricity obligations

Exit Capacity Risk Analysis – Overall Risk Analysis indicates overall risk is low (<£2m) Note: Figures are a snap shot of the current risk and include all 5 years of any associated revenue drivers

Exit Capacity Risk Analysis - Existing Capacity Existing Capacity Holding - Very low risk (£0.2m) Shipper Community are not at financial risk from a DNO default Energy Act - Administration Arrangements Around 60% of NTS Exit baselines attributed to DNOs Storage/Generators/Shippers likely to be taken over if they experience difficulties Portfolio buy-outs more prominent in Exit than in Entry Industrial sites higher risk due to economic climate Number of NTS connected industrial sites small (12) Given small number the risk of default is lower than that for industrials on Distribution Networks Only 2 shutdowns seen in last 6mths (both orderly with all liabilities honoured) The value of annual enduring exit capacity without the DNOs is around £65M per year and this value is expected to reduce in July (reduction window), as Users seek to move to off-peak/interruptible products.

Exit Capacity Risk Analysis - Adhoc Applications (1) New Projects (Adhoc Applications) – Demonstration Dates mean that the risk is low (<£0.5m) Demonstration Dates First gas flow: between 6 months from date of application and 1st October Gas Year Y+4 from application if Works will be required, the Offer specifies Demonstration Date and Capacity Delivery Date. User must provide NTS with certain information (agreed at time of application) by a pre-agreed date, e.g. S36 consents, project plan, board approval, etc. NTS will publish guidance on what could constitute demonstration information Demonstration date not met If a User/developer does not provide the required information, NTS can re-set the demonstration date and the delivery date If the demonstration date is reset 3 times, NTS can either: Agree with User/developer a further demonstration date Cancel the User’s/developer’s capacity holding and recover all costs and expenses incurred in performing design works Where capacity is cancelled, it shall be prior to triggering Licence revenue driver

Exit Capacity Risk Analysis - Adhoc Applications (2) New Projects (Adhoc Applications) – low risk (<£0.5m) Demonstration date passed Probability of a Site default is very low as they will have proved the project is financially supported and planning permission received There is some risk of a Shipper default or a single exit point Shipper deferring capacity (the same UNC text exists on entry and is being addressed via Mod 0246) Note: where no investment is required the risk is the same as Existing Capacity

Exit Capacity Risk Analysis - Annual Application New Projects (Annual Application Window) – low risk (<£1m) Annual Application Window covers capacity to be utilised from 1 October Y4, Y5 and/or Y6 Demonstration Dates not applicable Shippers can also defer capacity (same UNC text as for Adhoc Applications/Entry) Out of 19 sites that have indicated an interest in bidding in July, the Revenue Driver is only applicable to 4 PowerStation's (4/19 sites) Note: where no investment is required the risk is the same as Existing Capacity

Conclusion/Next steps Biggest risk is New Project Default (Annual Application Window) However, only 20%~ of applications have an associated Revenue Driver NG propose to monitor projects progressed through annual application to assess if Demonstration Dates should be introduced in this area. Some risk of a Shipper default or a single exit point Shipper deferring capacity More focused proposal being developed to remove current UNC text enabling Users to defer NTS exit capacity commitments June Transmission Workstream Views sought on the analysis performed and proposed approach?