NARROWING OF FREQUENCY BAND – IMPLICATIONS THEREOF

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
Amendment 3/5 Workshop.
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
1 Basis risk of hedging 1 Insufficient windSufficient windExcessive wind Turbine operation normal => YesPayoutNo payoutPayout => NoPayoutNo payoutPayout.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
REVISION OF SCHEDULES/REQUISITIONS A)OUTAGE OF GENERATING UNIT B) REVISED DECLARATION OF AVAILABILITY BY CGS C) OUTAGE OF A TRANSMISSION ELEMENT D)UNFORESEEN.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
Electricity Regulatory Frame Work in India Anil Kumar K AO, KPTCL.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
NLDC 1 Ancillary Services in Indian Context. NLDC 2 Outline Definition Drivers for Ancillary Services Ancillary Services in Indian Context.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
-- Bhanu Bhushan -- < > (August, 2011)
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
PROPOSED AMENDMENT TO EA,2003 OCTOBER,2015 by RAKESH NATH.
Electricity pricing Tariffs.
Transmission Tariff V.Balaji Chief Manager SRLDC.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
IEA DSM Programme Task XV: Network-Driven DSM Dr David Crossley Task XV Operating Agent and Managing Director Energy Futures Australia Pty Ltd.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
University of Aberdeen Superannuation and Life Assurance Scheme
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
GC0104 – Demand Connection Code (DCC)
Principal Load Profiling and Modeling
California Product Offerings
It’s now time for political decisions
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
Meeting of Generation Wing Officers
Fair Go Rates System Dr Ron Ben-David Chairperson
Operationalizing One Nation One Grid
Case for Gold ETFs to invest in Gold Futures
Open Access.
Narragansett Electric Rate Classes
Power Supply Scenario in the State of Himachal Pradesh
Hon’ble Commission has issued Interim order dated 19/ directing :
Congestion regulations
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
ABT & Frequency.
TEAP XXV/8 Task Force Report
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Fair Go Rates System Dr Ron Ben-David Chairperson
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
Business Cycles and Unemployment
©G Dear 2008 – Not to be sold/Free to use
Update on Exit Capacity Substitution and Revision
Planning Reserve Margin
Wholesale Electricity Costs
Presentation transcript:

NARROWING OF FREQUENCY BAND – IMPLICATIONS THEREOF A PRESENTATION BY HPSEB Presented by : Er.Suneel Grover

INDEX 1. Low frequency in the Grid 2. HPSEB’s Suggested Methodology 3. CERC Regulations 2009 4. Impact of CERC Regulations 5. Proposed CERC Regulations 6. Factors for low Frequency 7. Likely Impact of Proposed Regulations 8. Submissions

LOW FREQUENCY IN THE GRID Low Frequency in the Grid and the rampant over drawls by the constituent states threaten the security of the Grid. During 2007-08 the frequency used to hover around 49.0Hz No Restrictions on over drawls during low frequency conditions further worsen the situation.

LOW FREQUENCY IN THE GRID Hon’ble CERC increased the rate for UI exchange i.e. Rs.10/kWh for over drawls when frequency was below 49.0 Hz However many States continued heavy over drawls under low frequency conditions constantly threatening of the Grid.

HPSEB’s SUGGESTED METHODOLOGY Certain percentage, about 5% or as may be decided after due deliberations for overdrawl must be fixed for constituents overdrawing when frequency starts falling below 49.5 Hz. This is necessarily required to discipline the overdrawing constituents and consequently save the system from further deterioration. No overdraws be permitted to any constituent when the frequency equals to 49.0 Hz or goes below. NRPC may moot an amendment in IEGC in this regard as IEGC does not mandatorily restrict the overdrawls (Clause 6.4 refers). Flouting States after due warning be disconnected electrically by RLDC under these circumstances & their connected feeders be kept in off conditions for atleast six hours before reconnection.

CERC REGULATION The Hon’ble Commission had taken cognizance of HPSEB’s submissions and the views of other constituents/ RLDCs etc. and Incorporated Clause 7 in the UI regulations effective from 1.4.2009 limiting over/under drawl under low frequency conditions as under:

CERC REGULATION Clause 7: “The over-drawl of electricity from the schedule by any beneficiary or a buyer during a time-block shall not exceed 12% of its scheduled drawl or 150 MW (whichever is lower) when frequency is below 49.5 Hz, and 3% on a daily aggregate basis for all the time blocks when the frequency is below 49.5 Hz”

IMPACT OF CERC REGULATION This regulation had SIGNIFICANT IMPACT on the Grid Frequency, and it remained between 49.5 Hz and 49.2 Hz for most of the time during the year 2009-10, which earlier used to hover around 49.0 Hz

IMPACT OF CERC REGULATION Since the inception of Our beloved new Grid the frequency profile has considerably improved. States/Utilities have put in considerable effort that OD is limited and is mostly done under exigent conditions.

IMPACT OF CERC REGULATION This clearly indicates that the regulation had imbibed grid discipline amongst the constituents. However, some of the constituents did violate the aforesaid regulation by overdrawing power when the frequency was below 49.2 Hz which requires more stringent penalties for such overdrawls.

OD for month of Apr-09 when Frequency <= 49.2 Hz Data Source: NREB

OD for month of Jun-09 when Frequency <= 49.2 Hz Data Source: NREB

OD for month of Jul-09 when Frequency <= 49.2 Hz Data Source: NREB

OD for month of Aug-09 when Frequency <= 49.2 Hz Data Source: NREB

OD for month of Oct-09 when Frequency <= 49.2 Hz Data Source: NREB

OD for month of Nov-09 when Frequency <= 49.2 Hz Data Source: NREB

Over Drawl by States If a few states out of the many in the country, as mentioned in the draft amendment are defaulting, the focus should be to set them right instead of changing the whole system

Frequency Profile for April 2009 Occurrence %age Data Source: NREB

Frequency Profile for May 2009 Occurrence %age Data Source: NREB

Frequency Profile for June 2009 Occurrence %age Data Source: NREB

Frequency Profile for July 2009 Occurrence %age Data Source: NREB

Frequency Profile for August 2009 Occurrence %age Data Source: NREB

Frequency Profile for Sep 2009 Occurrence %age Data Source: NREB

Frequency Profile for Oct 2009 Occurrence %age Data Source: NREB

Frequency Profile for Nov 2009 Occurrence %age Data Source: NREB

Frequency Profile for Dec 2009 Occurrence %age Data Source: NREB

Frequency Profile for Jan 2010 Occurrence %age Data Source: NREB

Frequency Profile for Feb 2010 Occurrence %age Data Source: NREB

Annual Frequency Profile (2009-10) Occurrence %age Data Source: NREB

A DAY WITH LOW FREQUENCY Frequency and OD Chart of Northern Region on 08.08.09 370 MW at 49 Hz Data : NRLDC

Frequency & OD of NR States on April 9, 2010 OD of 1000 MW 48.85Hz Data : Real Time

Graph of Frequency and OD of Northern Region on 09.04.10 1060 MW at 48.9 Hz 1100 MW at 48.8 Hz Data : Real Time

PROPOSED CERC REGULATION

PROPOSED CERC REGULATION Prevalent UI Charges Freq. Band (Hz) Step (paisa/kwh) 50.30 – 49.50 12.00 49.50 – 49.20 17.00 Charge for OD for each Time block where Frequency is below 49.2 shall be 40% of the UI charge corresponding to the of below 49.22 Hz Proposed UI Charges Freq. Band (Hz) Step (paisa/kwh) 50.20 – 50.00 21.50 50.00 – 49.70 12.50 49.70 – 49.50 45.50 Charge for OD for each Time block where Frequency is below 49.5 shall be 100% of the UI charge corresponding to the of below 49.5 Hz

PROPOSED CERC REGULATION Additional UI Charge for over drawl of electricity for each time block when Grid Frequency is below 49.5 Hz shall be equivalent to 100% of UI charge of 870.0 paise/kwh corresponding to the grid frequency of below 49.5 Hz.

MEANING THEREBY… The cost of energy under UI when frequency is below 49.5 Hz. …….. 1740 Paise/kWh

Factors Contributing to Low Frequency Conditions in the Grid

Mismatch of Demand – Supply of power in the country Huge Gap between demand and supply of power Growth in generation lagging growth in demand – Under 11th Plan 78700 MW were supposed to be added, however only about 27000 MW actually materialized uptill recently as per press reports.

Mismatch of Demand – Supply of power in the country Power plants – either hydro or thermal – are Capital Intensive and take a lot of time in setting up Inadequate Transmission and Distribution Infra-Structure

Impact of Proposed CERC Regulations

Precarious Financial Health of DISCOMs/Utilities Most DISCOMs/Utilities are coping with system inadequacies and narrowing down of frequency band shall not yield any fructuous results, rather shall impede even the ongoing works. It shall add to the huge financial burden and will only further deteriorate the financial health of the already sick DISCOMS/Utilities. Ongoing works related to capacity addition & system strengthening of state utilities shall be hampered & shall have Negative Impact on the existing Grid conditions .

Freq, UI Comparison with Market & Exchange Rate (2002 - Till Date) 40% Scharge Data Source: NREB

Most Likely Impact of Proposed CERC Regulations DISCOMs/Utilities will have no option but to increase tariff across all categories of consumers however the highest rate that can be charged will be decided by SERC … forcing utilities to resort to power cuts. Contd…

Most Likely Impact of Proposed CERC Regulations This narrowing of Frequency band and increase in surcharge will in the end make power a commodity that will be out of reach for the common man of our nation.

Most Likely Impact of Proposed CERC Regulations In times when the country is recovering from recession, an increase in cost of power – the prime mover of growth - will severely hamper the process of recovery as industrial units will be hard hit by frequent power cuts due to System constraints.

SUBMISSIONS Since low frequency in the Grid is mainly due to wide mismatch of demand & supply, due to delayed commissioning of power projects for one reason or another. In this activity DISCOMs/Utilities are not at all associated and as such there is not much that DISCOMs/Utilities to improve the Grid frequency. Contd…

SUBMISSIONS In essence the Utilities/ Agencies entrusted with this job of capacity addition should be held responsible and penalised for creating such conditions in the Grid. Contd…

SUBMISSIONS Therefore it is submitted that for a period of one year or till such time adequate generation capacity is available following may please be considered: The prevalent frequency bands should not be squeezed To restrict over drawl the additional surcharge on Over drawl when Frequency is below 49.2 should be increased from 40% to 100% Contd…

SUBMISSIONS For better Load Management especially when the frequency goes down below 49.2 Hz, Automatic Load Shedding schemes can be put in place.

SUBMISSIONS 20000 MW capacity addition is expected by 2012, when this capacity addition will enhance the frequency profile of the Grid. Therefore till such time the present UI bands may be allowed to continue. The low voltage issue plaguing the Grid need also to be addressed. Therefore the funds collected through 100% Surcharge levied on over drawls at low frequencies should be utilized on systems that help in improving Grid voltages.

THANK YOU