Steps towards beam commissioning: Magnet power supplies

Slides:



Advertisements
Similar presentations
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut SwissFEL Timing System.
Advertisements

HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Controls tools for operation management at the Swiss Light Source at the EPICS collaboration.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
What is a Computer Network? Two or more computers which are connected together.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut René Künzi Safety for equipment & personnel.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Timo Korhonen Developments at PSI towards the SwissFEL (and others) EPICS Meeting,Taiwan.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Wir schaffen Wissen – heute für morgen Electronic Logbooks Revisited Paul Scherrer Institute Andreas Lüdeke Presented at the ARW 2011.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
Definition: Automation is the use of control systems for operating equipment with minimal or reduced human intervention. + save labour + reproducibility.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Wir schaffen Wissen – heute für morgen 30. Mai 2016PSI,30. Mai 2016PSI, Paul Scherrer Institut The PSI web interface to the EPICS channel archiver Gaudenz.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: ID group Thomas Schmidt :: Insertion Devices :: Paul Scherrer Institut SwissFEL.
Wir schaffen Wissen – heute für morgen PSI, March 2013 Paul Scherrer Institut PSI / DESY / KIT Mini-Workshop on Longitudinal Diagnostics for FELs.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Optics group Rolf Follath :: Beamline optics :: Paul Scherrer Institut SwissFEL.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Radiation Protection Dieter Mohr :: radiation safety technician :: Paul Scherrer.
Undulator Commissioning with beam
Cables for the RE4 Upscope in CMS
High energy beam transport.
SESAME Control System Status
Eduard Prat / Sven Reiche :: Paul Scherrer Institute
Equipment simplified model SMR UR safety
Steps Towards Beam Commissioning: BPM System
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Gas System Commissioning
PLC-based control systems at SOLEIL - ICALEPCS 2017
Injectors BLM system: PS Ring installation at EYETS
The LHC - Status Is COLD Is almost fully commissioned
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
Renovation of the 45-year old PS magnets
XFEL Vacuum System Commissioning
GFA Controls IT Alain Bertrand
Powering from short circuit tests up to nominal
James Ridewood BE-OP-SPS
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
Analysis Software for Neutron Imaging
ACS news Circulator TCU: control tests in progress All cavity racks
SC1R Cold Box PDR Controls
Steps towards beam commissioning: Photon Diagnostics
TEST PLANS for HL LHC IT STRING
TPC Detector Control System
Always Connected introduces Tigo SMART 3.1 This guide is interactive!
umbrellaID: OpenIRIS & Umbrella
ThomX – Commissioning Meeting – 25/01/2018
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Rack installation and local tests for the MEBT Chopper Rack
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Steps towards beam commissioning: Magnet power supplies David Clavier :: Leistungselektronik :: Paul Scherrer Institut Steps towards beam commissioning: Magnet power supplies SwissFEL Commissioning Workshop, 21/22 March 2016 FHNW Campus Brugg-Windisch

Our system Magnet Power supplies figures: (stand 2014) Totally 789 current channels spread along the tunnel (from Z=15 to 496m.) Mounted into 75 racks Controlled by 280 controller cards All PS have been already manufactured and tested (by us). 1 PS for the Septum Magnet remains to be designed. All the Racks of the Technical Gallery have been installed. Racks in the basement (Aramis ¬ Athos) not yet completely installed.

Our most important interfaces to (dependences on) other expert groups Equipment For commissioning AC Supply Critical Cooling water For PS above 50 Amps (43 pieces Ethernet Network Office Network is mandatory. Machine Network is highly wished Connection to EPICS For the beam commissioning Inventory 4 Works great!

Our steps towards beam commissioning/operation: Hardware installation The power supply racks are (almost) plug and play Installation and cabling is done by 9330

Our steps towards beam commissioning/operation: System commissioning in OSFA before beam Commissioning procedure: Check I/O, magnet polarity and connection Identify the Magnet characteristics Set the control and protection parameters Check the analog indications Measure the performances & write down the commissioning report Automatic Commissioning SW for the „small“ power supplies help reducing the time needed to 2-3 hours for a full rack (21 PS). A large PS requires almost the same time. We can expect to achieve the commissioning of 2 to 3 units per day.

Our steps towards beam commissioning/operation: Handover to operation, pre-beam checks We expect to finish the injector magnet PS commissioning before the RF conditioning starts Strom bis 200 m.

What makes us worry Power outages make our work complicated They should be announced sufficiently in advance (1 or 2 days) Have a given duration and take place early in the morning or beginning of the afternoon. After normalisation, the other systems (cooling, network) should be re-energised asap. Each group should commit a responsible on site for this.

Wir schaffen Wissen – heute für morgen Acknowledgments RS & JH93 9332 9360 8433…