EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002

Slides:



Advertisements
Similar presentations
Operating System.
Advertisements

R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
EXL/R3B Calorimeters- Readout from ASIC to DAQ Ian Lazarus STFC Daresbury Laboratory.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
> IRTG – Heidelberg 2007 < Jochen Thäder – University of Heidelberg 1/18 ALICE HLT in the TPC Commissioning IRTG Seminar Heidelberg – January 2008 Jochen.
System Components Hardware overview for Apollo ACS.
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
ACM 511 Chapter 2. Communication Communicating the Messages The best approach is to divide the data into smaller, more manageable pieces to send over.
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Who is UMA ? Peter Fischer, I. Peric, F. Giesen, V. Kreidl Lehrstuhl für Schaltungstechnik und Simulation Institut für Technische Informatik Universität.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
DABCDABC J. Adamczewski-Musch, H.G. Essel, S. Linev Software development for CBM DAQ J. Adamczewski-Musch, H.G. Essel, S.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
News on GEM Readout with the SRS, DATE & AMORE
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Source Controller software Ianos Schmidt The University of Iowa.
Florida Institute of Technology, Melbourne, FL
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Lesson 7 Networks Unit 1—Computer Basics. Computer Concepts BASICS - 2 Objectives Describe the benefits and disadvantages of networks. List and describe.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
Network Components and terms. Hub is a device for connection multiple ethernet devices together and making then act as a single network segment.
The Slow Control System of the HADES RPC Wall Alejandro Gil on behalf of the HADES RPC group IFIC (Centro Mixto UV-CSIC) Valencia, 46071, Spain IEEE-RT2009.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
Team Members: ECE- Wes Williams, Will Steiden, Josh Howard, Alan Jimenez Sponsor: Brad Luyster Honeywell Network Traffic Generator.
CMS DAQ project at Fermilab
University of Wisconsin at Madison
Chapter 13: I/O Systems Modified by Dr. Neerja Mhaskar for CS 3SH3.
CLAS12 DAQ & Trigger Status
Port Connection Status
Section 4 – Computer Networks
Operating System.
ATF/ATF2 Control System
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
Large Area Endplate Prototype for the LC TPC
Controlling a large CPU farm using industrial tools
RT2003, Montreal Niko Neufeld, CERN-EP & Univ. de Lausanne
Status of the Front-End Electronics and DCS for PHOS and TPC
Cover page.
VELO readout On detector electronics Off detector electronics to DAQ
The LHCb Run Control System
Transfer Line and CSC Rφ Reconstruction
University of California Los Angeles
University of Wisconsin at Madison
University of Wisconsin-Madison
Tracker Software Status
Commissioning of the ALICE-PHOS trigger
LHCb Trigger, Online and related Electronics
University of Wisconsin-Madison
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
CMS Week Muon Alignment
Readout electronics system for Laser TPC prototype
TELL1 A common data acquisition board for LHCb
Pierluigi Paolucci & Giovanni Polese
Implementation Plan system integration required for each iteration
Presentation transcript:

EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002 Outline: Components to be read-out or controlled (See D. Eartly’s talk for details of the front end hardware) General layout of FE and DAQ hardware Software Issues: Current Status plans and summary

Devices to be Readout DCOPS sensors: Analog sensors: 36 per layer (6 x 1/2-SLM lines, each with 6 sensors including both on the transfer plate) 6 sensors on each MAB daisy chained and communicate with 2 serial lines daisy chained and communicate with 2 serial lines Analog sensors: 60 ADC channels (for ME2, 3, and 4) > 144 ADC channels for ME1 area (12 more) One Agilent DAU handles 60 ADC channels. Each DAU communicates with 1 serial line Switching lasers (Agilent DAU) : 12 channels (SLM) per layer, 12 (possibly 24) axial ch.

Number of Serial lines 2 (RS-422) 3 (RS-232) 1 (RS-232) 5 3 2 Layer 1 MAB # Serial lines for DCOPS 2 (RS-422) # Serial lines for Agilent DAU 3 (RS-232) 1 (RS-232) Total # of serial lines 5 3 2

General Layout

Characteristics All the components above the serial hub (device specific below) are generic standard plug-ins. Device specific readout system is designed to be modular (equal vertical slices) and easily expandable. This allows developing software, testing and commissioning of the detector much simpler. Use of commercially available hardware (serial hub, Aligent DAU, ethernet hub, router/gateway, etc…) Data path in the low level should be protected from the outside network traffic, however, the DAQ operation system must be easily accessible. Relatively inexpensive.

Serial Hub & Agilent DAU

Software Issues Operating System: Linux Language: c with gnu compiler network protocol: TCPIP DCS interface: DIM socket connection rawdata: input to COCOA for the fast alignment reconstruction of chambers. Rawdata Exchange: Most of the rawdata are totally internal to the EMU system and no need for data exchange between the subsystems. Only a very small amount of MAB DCOPS sensor rawdata for the barrel system are possibly being read out by the EMU DAQ.

Software Issues (Cont.) Input to EMU Chamber Reconstruction (COCOA): Input to the EMU reconstruction program requires some information from the link system (link COCOA output) together with EMU raw data. Output of COCOA: Most of the data needed to be exchanged between the subsystem are not raw data but COCOA output. The output of the alignment reconstruction program must be easily interface to: Trigger alignment input Offline muon track reconstruction (ORCA) (see P. Ace’s Reconstruction Software talk for more details)

Expected Raw Data Size DCOPS sensors (8 words per sensor): 36 sensors per layer (4 layers in each side) 6 sensors on each MAB (36+6)*2*8*2 = 672*2 B Analog sensors: 60 ADC channels (for ME2, 3, and 4) 144 ADC channels (for ME1) (60*3+144)*2*2= 648*2 B approx. 5kB/event one event/min (over estimate) approx. 6 MB/day (very small)

Current Status Basic DAQ design is finished and tested We have, currently, a set of necessary hardware elements to test/develop a modular and expandable DAQ system. Router/Gateway (1) Rocketport Serial Hub (2) Agilent DAU (2) DCOPS readout electronics (multiple number of DSP cards, Interface cards). We have made and successfully tested a simple C program to readout both DCOPS and Agilent DAU. It works under Linux OS using a setup with all the basic readout hardware components listed above. We have been using above setup to test/debug our FE.

Near Future Plans for DAQ Continue to develop the DAQ software to add more functionalities. Modify RS232 to RS422 readout at the serial hub (at a moment, using RS232). We need to look into more on: making sure this DAQ configuration works with the nominal cms operating conditions, such as magnetic field and radiation. Get ready for the 2004 magnet test. (see more on next page) Implement DCS connection.

DAQ Magnet Test Plan Should be able to read out the full EMU alignment system using the hardware and software components for EMU DAQ described above. Some of the ‘nice’ functionalities of DAQ (GUI, DCS connections, Database access, etc.) may not be ready, yet. But that should be ok for this test. The software must be developed enough that during the magnet test we can have fast feed- back from the data taken. This means that the interface between raw data and COCOA, and COCOA software must be well established enough that we can get fast feed-back from COCOA output (results of muon alignment reconstruction).

EMU DAQ Summary We have completed and tested the basic DAQ design with a modular expandable unit successfully. We have been using the setup to test/debug FE. We are in a good shape to carry on developing our readout system.