Database requirements from ITk-Strips for DAQ loads

Slides:



Advertisements
Similar presentations
ATLAS Module building at Glasgow
Advertisements

Barrel Module Database - Status Status of upload utilities Review of uploading SCTDAQ info Flagging Hybrid re-work Module Quality uploads Module Signoff.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Martin Gibson (RAL), Richard Holt (RAL), Dave Lynn (BNL), Peter Phillips.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Stave DAQ Updates. Testing two collobarative software websites Wiki 22ATLAS_Upgrade_- _Stave_DAQ%22#Code_Versions.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall.
Michał Dwużnik, for the SCT collaboration
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
Serial Powering System Architecture Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of the SP Community Acknowledgement: many figures prepared.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
Sergio Díez Cornell, Berkeley Lab (USA),
Peter W Phillips Ashley Greenall Matt Warren Bruce Gallop 08/02/2013.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
UK Participation in phase-II tracker upgrade o Brief Overview of R&D work to date1 slide o Scope of Interest of UK institutes2 slides o Task list & Institute.
WP2: On Detector Systems 2.1 Strip Sensors Layout Evaluation 2.2 ASICs Digital Design Evaluation Wafer Test 2.3 Hybrids Layout & Manufacture Die Attach.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
ATLAS-UK Tracker Upgrade OverviewR.Nickerson Programme StatusI.Wilmut [hat 2] WP2Peter Phillips WP3Bart Hommels WP4Tim Jones WP5Craig Buttar [hat 3] B180Todd.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Discussion of what to show at ITK-SC meeting 1. What has been asked for Current status, near term plans From today and older slides, draft to be circulated.
Serial Power Distribution for the ATLAS SCT Upgrade John Matheson Rutherford Appleton Laboratory On behalf of the SP Community Thanks to Richard Holt (RAL),
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
CT-PPS DB Info (Preliminary) DB design will be the same as currently used for CMS Pixels, HCAL, GEM, HGCAL databases DB is Oracle based A DB for a sub-detector.
Berkeley status Aug 10th, 2012.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
+ Steve Worm (since Monday)
MODULE QUALIFICATION STATUS AT LIVERPOOL
GLAST Large Area Telescope:
ATLAS ITk Short-Strip Stave prototypes with 130nm chipset
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
ITK Strip Module Meeting; 12st October 2015
Constructional requirements from ITk-Strips
Mini-drawers, FE-ASIC , Integrator
LOI Backup Document: R&D
Work packages status in Torino and perspectives
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
Module production in Italy
UK CMS Oversight Committee Mtg
RPC Detector Control System
VELO Software Update TELL1 Algorithms Error analysis
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Database requirements from ITk-Strips for DAQ loads Jiri Kroll, on behalf of ITK strips community

Contents Breakdown of components for Strips Upgrade Max numbers of parts in the Build DAQ loads Summary Meeting on ITk production databases

Strip Tracker Components I act as the contact from the strips to the production database designers at Unicorn College This talk has is an update to the presentation Andy Blue gave last year at the production database meeting in Prague It has Updated layout More components (power boards, HV switches etc) Will use this info as the input to you Meeting on ITk production databases

Strip Tracker ‘Parts’ Very simplistic outline for just now Stave/ Petal Cores Glues HV Mutiplexing Tapes Eos Staves/Petals Sensors ABC ASICs Modules Hybrids HCCs Will work this way Power boards Hybrid Panels Meeting on ITk production databases

Strip Tracker Components From LOI CERN-LHCC-2012-022 ; LHCC-I-023 Meeting on ITk production databases

Strip Tracker Components HCC Multiplexing ASIC Sensor Hybrid LV Powering Board (Liverpool, RAL & BNL) ABC ASIC Barrel Module: Composed of 2 Hybrids and 1 sensor Each Hybrid has 10 x ABC130 readout chips 1 x HCC multiplexing chip 1 x LV Powering board Meeting on ITk production databases

Strip Tracker Components R5 module R4 module R3 module R2 module R1 module R0 module S0 S1 H0 H1 H2 H3 Petal: Composed of 5 different modules with 13 Hybrid variants 7-12 x ABC130 readout chips /Hybrid ~1 x HCC multiplexing chi/Hybrid ~1 x LV Powering board Meeting on ITk production databases

And Finally Endcap Totals Modules 8064 Hybrids 11648 ABC ASICs 107832 HCCs Barrel Totals Modules 10976 Hybrids 14784 ABC ASICs 147840 HCCs Meeting on ITk production databases

Present day WE have approximately 20 sites ready to test DAQ loads DAQ loads contain hybrid HCC ABC130 mini sensor Frame Plan for 40 DAQ loads Each DAQ load has an identification code Meeting on ITk production databases

What do we want We want to compare ASIC (ABC130 and HCC) tests before and after they are assembled into the DAQ loads DAQ load tests from 20 institutes from around the world for comparison plots Meeting on ITk production databases

What do we want to record? – DAQ loads Item Data Type Comments DAQ load eps & txt 3 Point Gain Threshold Noise Occupancy # dead, masked channels ABC + HCC ASICs Wafer map, .dat, txt. .eps Wafer tests Meeting on ITk production databases

DAQ loads From tests we produce output (txt) files that have for each channel the Channel no. Gain Offset noise Meeting on ITk production databases

ASICs # Information on the ASICS (ABC130 and HCC) are recorded when they are wafer probed We want the database to link the results from the wafer probing to the DAQ load tests ABCn25 data (per asic) #chan code vt50 gain offset innse 0 1000 169.1 81.0 7.6 533 1 1000 170.4 80.5 8.5 548 2 1000 167.1 82.0 3.0 543 3 1000 169.2 82.6 4.3 508 4 1000 164.3 81.5 0.9 481 5 1000 166.8 80.5 5.4 559 6 1000 166.4 81.6 3.6 469 7 1000 168.7 80.8 7.2 522 8 1000 160.7 80.8 -1.2 532 9 1000 168.1 81.0 6.0 500 10 1000 167.5 80.9 6.0 542 Meeting on ITk production databases

Time frames Is it possible to have a timeframe on when we should have such a database for these comparison tests? Do we need write the application to allow us to upload the files to the database? Meeting on ITk production databases